887 resultados para Distribution network reconfiguration problem
Resumo:
Distribution systems are the first volunteers experiencing the benefits of smart grids. The smart grid concept impacts the internal legislation and standards in grid-connected and isolated distribution systems. Demand side management, the main feature of smart grids, acquires clear meaning in low voltage distribution systems. In these networks, various coordination procedures are required between domestic, commercial and industrial consumers, producers and the system operator. Obviously, the technical basis for bidirectional communication is the prerequisite of developing such a coordination procedure. The main coordination is required when the operator tries to dispatch the producers according to their own preferences without neglecting its inherent responsibility. Maintenance decisions are first determined by generating companies, and then the operator has to check and probably modify them for final approval. In this paper the generation scheduling from the viewpoint of a distribution system operator (DSO) is formulated. The traditional task of the DSO is securing network reliability and quality. The effectiveness of the proposed method is assessed by applying it to a 6-bus and 9-bus distribution system.
Resumo:
Natural gas industry has been confronted with big challenges: great growth in demand, investments on new GSUs – gas supply units, and efficient technical system management. The right number of GSUs, their best location on networks and the optimal allocation to loads is a decision problem that can be formulated as a combinatorial programming problem, with the objective of minimizing system expenses. Our emphasis is on the formulation, interpretation and development of a solution algorithm that will analyze the trade-off between infrastructure investment expenditure and operating system costs. The location model was applied to a 12 node natural gas network, and its effectiveness was tested in five different operating scenarios.
Resumo:
To maintain a power system within operation limits, a level ahead planning it is necessary to apply competitive techniques to solve the optimal power flow (OPF). OPF is a non-linear and a large combinatorial problem. The Ant Colony Search (ACS) optimization algorithm is inspired by the organized natural movement of real ants and has been successfully applied to different large combinatorial optimization problems. This paper presents an implementation of Ant Colony optimization to solve the OPF in an economic dispatch context. The proposed methodology has been developed to be used for maintenance and repairing planning with 48 to 24 hours antecipation. The main advantage of this method is its low execution time that allows the use of OPF when a large set of scenarios has to be analyzed. The paper includes a case study using the IEEE 30 bus network. The results are compared with other well-known methodologies presented in the literature.
Resumo:
Currently, power systems (PS) already accommodate a substantial penetration of distributed generation (DG) and operate in competitive environments. In the future, as the result of the liberalisation and political regulations, PS will have to deal with large-scale integration of DG and other distributed energy resources (DER), such as storage and provide market agents to ensure a flexible and secure operation. This cannot be done with the traditional PS operational tools used today like the quite restricted information systems Supervisory Control and Data Acquisition (SCADA) [1]. The trend to use the local generation in the active operation of the power system requires new solutions for data management system. The relevant standards have been developed separately in the last few years so there is a need to unify them in order to receive a common and interoperable solution. For the distribution operation the CIM models described in the IEC 61968/70 are especially relevant. In Europe dispersed and renewable energy resources (D&RER) are mostly operated without remote control mechanisms and feed the maximal amount of available power into the grid. To improve the network operation performance the idea of virtual power plants (VPP) will become a reality. In the future power generation of D&RER will be scheduled with a high accuracy. In order to realize VPP decentralized energy management, communication facilities are needed that have standardized interfaces and protocols. IEC 61850 is suitable to serve as a general standard for all communication tasks in power systems [2]. The paper deals with international activities and experiences in the implementation of a new data management and communication concept in the distribution system. The difficulties in the coordination of the inconsistent developed in parallel communication and data management standards - are first addressed in the paper. The upcoming unification work taking into account the growing role of D&RER in the PS is shown. It is possible to overcome the lag in current practical experiences using new tools for creating and maintenance the CIM data and simulation of the IEC 61850 protocol – the prototype of which is presented in the paper –. The origin and the accuracy of the data requirements depend on the data use (e.g. operation or planning) so some remarks concerning the definition of the digital interface incorporated in the merging unit idea from the power utility point of view are presented in the paper too. To summarize some required future work has been identified.
Resumo:
Mathematical Program with Complementarity Constraints (MPCC) finds many applications in fields such as engineering design, economic equilibrium and mathematical programming theory itself. A queueing system model resulting from a single signalized intersection regulated by pre-timed control in traffic network is considered. The model is formulated as an MPCC problem. A MATLAB implementation based on an hyperbolic penalty function is used to solve this practical problem, computing the total average waiting time of the vehicles in all queues and the green split allocation. The problem was codified in AMPL.
Resumo:
Mestrado em Engenharia Electrotécnica e de Computadores
Resumo:
This paper focuses on the problem of providing efficient scheduling mechanisms for IP packets encapsulated in the frames of a real-time fieldbus network - the PROFIBUS. The approach described consists on a dual-stack approach encompassing both the controlrelated traffic ("native" fieldbus traffic) and the IPrelated traffic. The overall goal is to maintain the hard real-time guarantees of the control-related traffic, while at the same time providing the desired quality of service (QoS) to the coexistent IP applications. We start to describe the work which have been up to now carried out in the framework of the European project RFieldbus (High Performance Wireless Fieldbus in Industrial Multimedia-Related Environments - IST-1999-11316). Then we identify its limitations and point out solutions that are now being addressed out of the framework of the above-mentioned European project.
Resumo:
This technical report describes the PDFs which have been implemented to model the behaviours of certain parameters of the Repeater-Based Hybrid Wired/Wireless PROFIBUS Network Simulator (RHW2PNetSim) and Bridge-Based Hybrid Wired/Wireless PROFIBUS Network Simulator (BHW2PNetSim).
Resumo:
OBJECTIVE To analyze temporal trends and distribution patterns of unsafe abortion in Brazil. METHODS Ecological study based on records of hospital admissions of women due to abortion in Brazil between 1996 and 2012, obtained from the Hospital Information System of the Ministry of Health. We estimated the number of unsafe abortions stratified by place of residence, using indirect estimate techniques. The following indicators were calculated: ratio of unsafe abortions/100 live births and rate of unsafe abortion/1,000 women of childbearing age. We analyzed temporal trends through polynomial regression and spatial distribution using municipalities as the unit of analysis. RESULTS In the study period, a total of 4,007,327 hospital admissions due to abortions were recorded in Brazil. We estimated a total of 16,905,911 unsafe abortions in the country, with an annual mean of 994,465 abortions (mean unsafe abortion rate: 17.0 abortions/1,000 women of childbearing age; ratio of unsafe abortions: 33.2/100 live births). Unsafe abortion presented a declining trend at national level (R2: 94.0%, p < 0.001), with unequal patterns between regions. There was a significant reduction of unsafe abortion in the Northeast (R2: 93.0%, p < 0.001), Southeast (R2: 92.0%, p < 0.001) and Central-West regions (R2: 64.0%, p < 0.001), whereas the North (R2: 39.0%, p = 0.030) presented an increase, and the South (R2: 22.0%, p = 0.340) remained stable. Spatial analysis identified the presence of clusters of municipalities with high values for unsafe abortion, located mainly in states of the North, Northeast and Southeast Regions. CONCLUSIONS Unsafe abortion remains a public health problem in Brazil, with marked regional differences, mainly concentrated in the socioeconomically disadvantaged regions of the country. Qualification of attention to women’s health, especially to reproductive aspects and attention to pre- and post-abortion processes, are necessary and urgent strategies to be implemented in the country.
Resumo:
Dissertação apresentada para a obtenção do Grau de Doutor em Química, especialidade em Química-Física, pela Universidade Nova de Lisboa, Faculdade de Ciências e Tecnologia
Resumo:
Mestrado em Engenharia Electrotécnica – Sistemas Eléctricos de Energia
Resumo:
Dissertation submitted in partial fulfilment of the requirements for the Degree of Master of Science in Geospatial Technologies
Resumo:
The objective of great investments in telecommunication networks is to approach economies and put an end to the asymmetries. The most isolated regions could be the beneficiaries of this new technological investments wave disseminating trough the territories. The new economic scenarios created by globalisation make high capacity backbones and coherent information society polity, two instruments that could change regions fate and launch them in to an economic development context. Technology could bring international projection to services or products and could be the differentiating element between a national and an international economic strategy. So, the networks and its fluxes are becoming two of the most important variables to the economies. Measuring and representing this new informational accessibility, mapping new communities, finding new patterns and localisation models, could be today’s challenge. In the physical and real space, location is defined by two or three geographical co-ordinates. In the network virtual space or in cyberspace, geography seems incapable to define location, because it doesn’t have a good model. Trying to solve the problem and based on geographical theories and concepts, new fields of study came to light. The Internet Geography, Cybergeography or Geography of Cyberspace are only three examples. In this paper and using Internet Geography and informational cartography, it was possible to observe and analyse the spacialisation of the Internet phenomenon trough the distribution of the IP addresses in the Portuguese territory. This work shows the great potential and applicability of this indicator to Internet dissemination and regional development studies. The Portuguese territory is seen in a completely new form: the IP address distribution of Country Code Top Level Domains (.pt) could show new regional hierarchies. The spatial concentration or dispersion of top level domains seems to be a good instrument to reflect the info-structural dynamic and economic development of a territory, especially at regional level.
Resumo:
Information Society plays an important role in all kinds of human activity, inducing new forms of economic and social organization and creating knowledge. Over the last twenty years of the 20th century, large investments in telecommunication networks were made to approach economies and put an end to the asymmetries. The most isolated regions were the beneficiaries of this new technological investment’s wave disseminating trough the territories. The new economic scenarios created by globalisation make high capacity backbones and coherent information society polity, two instruments that could change regions fate and launch them in to an economic development context. Technology could bring international projection to services, products and could be the differentiating element between a national and an international economic strategy. So, the networks and its fluxes are becoming two of the most important variables to the economies. Measuring and representing this new informational accessibility, mapping new communities, finding new patterns and localisation models, could be today’s challenge. In the physical/real space, location is defined by two or three geographical co-ordinates. In the network/virtual space or in cyberspace, geography seems incapable to define location, because it doesn’t have a good model. Trying to solve the problem and based on geographical theories and concepts, new fields of study came to light. Internet Geography is one example. In this paper and using Internet Geography and informational cartography, it was possible to observe and analyse the spacialisation of the Internet phenomenon trough the distribution of the IP addresses in the Portuguese territory. This work shows the great potential and applicability of this indicator to regional development studies, and at the same time. The IP address distribution of Country Code Top Level Domains (.pt for Portugal) could show the same economic patterns, reflecting territorial inflexibility or, by opposition, new regional hierarchies. The spatial concentration or dispersion of top level domains seems to be a good instrument to analyse the info-structural dynamic and economic development of a territory, especially at regional level. At the same time it shows that information technologies are essential to innovation and competitive advantage.
Resumo:
Dissertação apresentada na Faculdade de Ciências e Tecnologia da Universidade Nova de Lisboa para obtenção do grau de Mestre em Engenharia Electrotécnica e Computadores