804 resultados para Defense Systems Management College.
Resumo:
Abstract This seminar will introduce an initial year of research exploring participation in the development of a bilingual symbol dictionary. Symbols can be a communication and literacy ‘lifeline’ for those unable to communicate through speech or writing. We will discuss how an online system has been built to overcome language, cultural and literacy skill issues for a country where 86% are expatriates but the target clients are Arabic born individuals with speech and language impairments. The symbols in use at present are inappropriate and yet there is no democratic way of providing a ‘user voice’ for making choices, let alone easy mechanisms for adapting and sharing newly developed symbols across the nation or extended Arabic world. This project aims to change this situation. Having sourced a series of symbols that could be adapted to suit user’s needs, the team needed to encourage those users, their carers and therapists to vote on whether the symbols would be appropriate and work with those already in use. The first prototype was developed and piloted during the WAISfest in 2013. The second phase needs further voting on the most suitably adapted symbols for use when communicating with others. There is a requirement to have mechanisms for evaluating the outcome of the votes, where symbols fail to represent accurate meanings, have inappropriate colours, representations and actions etc. There also remains the need to collect both quantitative and qualitative data. Not easy in a climate of acceptance of the expert view, a culture where to be critical can be a problem and time is not of the essence.
Resumo:
The Integrated Mass Transit Systems are an initiative of the Colombian Government to replicate the experience of Bogota’s Bus Rapid Transit System —Transmilenio— in large urban areas of the country, most of them over municipal perimeters to provide transportation services to areas undergoing a metropolization process. Management of these large scale metropolitan infrastructure projects involves complex setups that present new challenges in the interaction between stakeholders and interests between municipalities, tiers of government and public and private sectors. This article presents a compilation of the management process of these projects from the national context, based on a document review of the regulatory framework, complemented by interviews with key stakeholders at the national level. Research suggests that the implementation of large-scale metropolitan projects requires a management framework orientated to overcome the traditional tensions between centralism and municipal autonomy.
Resumo:
Resumen basado en el de la publicación
Resumo:
This article discusses the lessons learned from developing and delivering the Vocational Management Training for the European Tourism Industry (VocMat) online training programme, which was aimed at providing flexible, online distance learning for the European tourism industry. The programme was designed to address managers ‘need for flexible, senior management level training which they could access at a time and place which fitted in with their working and non-work commitments. The authors present two main approaches to using the Virtual Learning Environment, the feedback from the participants, and the implications of online Technology in extending tourism training opportunities
Resumo:
The technique of linear responsibility analysis is used for a retrospective case study of a private industrial development consisting of an extension to existing buildings to provide a warehouse, services block and packing line. The organizational structure adopted on the project is analysed using concepts from systems theory which are included in Walker's theoretical model of the structure of building project organizations (Walker, 1981). This model proposes that the process of building provision can be viewed as systems and subsystems which are differentiated from each other at decision points. Further to this, the subsystems can be viewed as the interaction of managing system and operating system. Using Walker's model, a systematic analysis of the relationships between the contributors gives a quantitative assessment of the efficacy of the organizational structure used. The causes of the client's dissatisfaction with the outcome of the project were lack of integration and complexity of the managing system. However, there was a high level of satisfaction with the completed project and this is reflected by the way in which the organization structure corresponded to the model's propositions.
Resumo:
The management of a public sector project is analysed using a model developed from systems theory. Linear responsibility analysis is used to identify the primary and key decision structure of the project and to generate quantitative data regarding differentiation and integration of the operating system, the managing system and the client/project team. The environmental context of the project is identified. Conclusions are drawn regarding the project organization structure's ability to cope with the prevailing environmental conditions. It is found that the complexity of the managing system imposed on the project was unable to achieve this and created serious deficiencies in the outcome of the project.
Resumo:
Smooth flow of production in construction is hampered by disparity between individual trade teams' goals and the goals of stable production flow for the project as a whole. This is exacerbated by the difficulty of visualizing the flow of work in a construction project. While the addresses some of the issues in Building information modeling provides a powerful platform for visualizing work flow in control systems that also enable pull flow and deeper collaboration between teams on and off site. The requirements for implementation of a BIM-enabled pull flow construction management software system based on the Last Planner System™, called ‘KanBIM’, have been specified, and a set of functional mock-ups of the proposed system has been implemented and evaluated in a series of three focus group workshops. The requirements cover the areas of maintenance of work flow stability, enabling negotiation and commitment between teams, lean production planning with sophisticated pull flow control, and effective communication and visualization of flow. The evaluation results show that the system holds the potential to improve work flow and reduce waste by providing both process and product visualization at the work face.
Resumo:
Farming systems research is a multi-disciplinary holistic approach to solve the problems of small farms. Small and marginal farmers are the core of the Indian rural economy Constituting 0.80 of the total farming community but possessing only 0.36 of the total operational land. The declining trend of per capita land availability poses a serious challenge to the sustainability and profitability of farming. Under such conditions, it is appropriate to integrate land-based enterprises such as dairy, fishery, poultry, duckery, apiary, field and horticultural cropping within the farm, with the objective of generating adequate income and employment for these small and marginal farmers Under a set of farm constraints and varying levels of resource availability and Opportunity. The integration of different farm enterprises can be achieved with the help of a linear programming model. For the current review, integrated farming systems models were developed, by Way Of illustration, for the marginal, small, medium and large farms of eastern India using linear programming. Risk analyses were carried out for different levels of income and enterprise combinations. The fishery enterprise was shown to be less risk-prone whereas the crop enterprise involved greater risk. In general, the degree of risk increased with the increasing level of income. With increase in farm income and risk level, the resource use efficiency increased. Medium and large farms proved to be more profitable than small and marginal farms with higher level of resource use efficiency and return per Indian rupee (Rs) invested. Among the different enterprises of integrated farming systems, a chain of interaction and resource flow was observed. In order to make fanning profitable and improve resource use efficiency at the farm level, the synergy among interacting components of farming systems should be exploited. In the process of technology generation, transfer and other developmental efforts at the farm level (contrary to the discipline and commodity-based approaches which have a tendency to be piecemeal and in isolation), it is desirable to place a whole-farm scenario before the farmers to enhance their farm income, thereby motivating them towards more efficient and sustainable fanning.