923 resultados para Construction Project Delivery


Relevância:

30.00% 30.00%

Publicador:

Resumo:

As regulators, governments are often criticised for over‐regulating industries. This research project seeks to examine the regulation affecting the construction industry in a federal system of government. It uses a case study of the Australian system of government to focus on the question of the implications of regulation in the construction industry. Having established the extent of the regulatory environment, the research project considers the costs associated with this environment. Consequently, ways in which the regulatory burden on industry can be reduced are evaluated. The Construction Industry Business Environment project is working with industry and government agencies to improve regulatory harmonisation in Australia, and thereby reduce the regulatory burden on industry. It is found that while taxation and compliance costs are not likely to be reduced in the short term, costs arising from having to adapt to variation between regulatory regimes in a federal system of government, seem the most promising way of reducing regulatory costs. Identifying and reducing adaptive costs across jurisdictional are argued to present a novel approach to regulatory reform.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Construction sector policy makers have the opportunity to create improvements and develop economic, social and environmental sustainability through supply chain economics. The idea of the supply chain concept to improve firm behaviour and industry performance is not new. However there has been limited application and little or no measurement to monitor successful implementation. Often purchasing policies have been developed with sound strategic procurement principles but even these have had limited penetration in to the processes and practices of infrastructure agencies. The research reported in this paper documents an action research study currently being undertaken in the Australian construction sector which aims to explore supply chain economic policy implementation for sectoral change by two government agencies. The theory which informs this study is the emerging area of construction supply chain economics. There are five stages to the project including; demand analysis, chain analysis, government agency organizational audit, supplier strategy and strategic alignment. The overall objective is towards the development of a Supplier Group Strategy Map for two public sector agencies. Two construction subsectors are examined in detail; construction and demolition waste and precast concrete. Both of these subsectors are critical to the economic and environmental sustainability performance of the construction sector and the community as a whole in the particular jurisdictions. The local and state government agencies who are at the core of the case studies rely individually on the performance of these sectors. The study is set within the context of a sound state purchasing policy that has however, had limited application by the two agencies. Partial results of the study are presented and early findings indicate that the standard risk versus expenditure procurement model does not capture the complexities of project, owner and government risk considerations. A new model is proposed in this paper, which incorporates the added dimension of time. The research results have numerous stakeholders; they will hold particular value for those interested in regional construction sector economics, government agencies who develop and implement policy and who have a large construction purchasing imprint and the players involved in the two subsectors. Even though this is a study in Australia it has widespread applicability as previous research indicates that procurement reform is of international significance and policy implementation is problematic.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The adoption of e-business by the Australian construction industry lags other service and product industries. It is assumed that slow adoption rate does not reflect the maturity of the technology but is due to adoption barriers peculiar to the nature of construction. This paper examines impediments to the uptake of e-business nationally and internationally. A systematic and extensive literature search of barriers (also referred to as obstacles, impediments or hindrances) to adoption has been undertaken and the findings discussed in this paper. This review included more that 200 documents and these have been published in a searchable database as part of a larger research initiative funded by the Cooperative Research Centre for Construction Innovation. The influence of levels of e-business maturity seen in other sectors such as retail, tourism and manufacturing was also captured and a number of major barriers were identified some including: privacy, trust, uncertainty of financial returns, lack of reliable measurement, fraud, lack of support and system maintenance. A total of 23 barriers were assessed in terms of impact to organisational type and size across reviewed documents. With this information it was possible to develop a reference framework for measuring maturity levels and readiness to uptake e-business in construction. Results have also shown that barriers to e-business adoption work differently according to organisational type and culture. Areas of training and people development need to be addressed. This would include a more sensitive approach to the nature of construction organisations, especially to those small and medium enterprises. Raising levels of awareness and creating trust for on-line collaboration are other aspects that need attention, which current studies confirm as lacking. An empirical study within construction, to validate these findings, forms the subsequent phase of this research.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Automated Scheduler is a prototype software tool that automatically prepares a construction schedule together with a 4D simulation of the construction process from a 3D CAD building model.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The Way-fi nding in the Built Environment project is a worldwide review identifying those way-fi nding systems and technologies that could be used to make it easier and safer for people with a sensory impairment (and in particular a vision impairment) to fi nd their way around buildings and large public spaces. The project makes recommendations on how these technologies and systems may be incorporated, by law or otherwise, into Australia’s building and construction practice. Way-fi nding aims to ensure that people with a sensory impairment know where they are in a building or an environment, where their desired location is, and how to get there from their present location. It is unlawful to discriminate against people with a disability under the Disability Discrimination Act 1992.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This paper compares and reviews the recommendations and contents of the guide for the design and construction of externally bonded FRP systems for strengthening concrete structures reported by ACI committee 440 and technical report of Externally bonded FRP reinforcement for RC structures (FIB 14) in application of carbon fiber reinforced polymer (CFRP) composites in strengthening of an aging reinforced concrete headstock. The paper also discusses the background, limitations, strengthening for flexure and shear, and other related issues in use of FRP for strengthening of a typical reinforced concrete headstock structure such as durability, de-bonding, strengthening limits, fire and environmental conditions. A case study of strengthening of a bridge headstock using FRP composites is presented as a worked example in order to illustrate and compare the differences between these two design guidelines when used in conjunction with the philosophy of the Austroads (1992) bridge design code.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This paper compares and reviews the recommendations and contents of the guide for the design and construction of externally bonded FRP systems for strengthening concrete structures reported by ACI committee 440 and technical report of Externally bonded FRP reinforcement for RC structures (FIB 14) in application of carbon fiber reinforced polymer (CFRP) composites in strengthening of an aging reinforced concrete headstock. The paper also discusses the background, limitations, strengthening for flexure and shear, and other related issues in use of FRP for strengthening of a typical reinforced concrete headstock structure such as durability, de-bonding, strengthening limits, fire and environmental conditions. A case study of strengthening of a bridge headstock using FRP composites is presented as a worked example in order to illustrate and compare the differences between these two design guidelines when used in conjunction with the philosophy of the Austroads (1992) bridge design code.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Measuring social and environmental metrics of property is necessary for meaningful triple bottom line (TBL) assessments. This paper demonstrates how relevant indicators derived from environmental rating systems provide for reasonably straightforward collations of performance scores that support adjustments based on a sliding scale. It also highlights the absence of a corresponding consensus of important social metrics representing the third leg of the TBL tripod. Assessing TBL may be unavoidably imprecise, but if valuers and managers continue to ignore TBL concerns, their assessments may soon be less relevant given the emerging institutional milieu informing and reflecting business practices and society expectations.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The Queensland Department of Public Works (DPW) holds a significant interest in the Brisbane Central Business District (CBD) in controlling approximately 20 percent of the office space within its confines. This comprises a total of 333,903 square metres of space, of which 170,111 square metres is owned and 163,792 square metres is leased from the private sector. The department’s nominal ownership extends to several enduring, landmark buildings as well as several modern office towers. The portfolio includes the oldest building in the CBD, being the former Commissariat Stores building and one of the newest, a 15,000 square metre office tower under construction at 33 Charlotte Street.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The literature and anecdotal evidence suggests that that there is more to tenancy selection (firm location) than the profit maximisation drive that traditional neo-classical economic location theory suggests. In the first instance these models assume property markets are rational and perfectly competitive; the CBD office market is clearly neither rational nor perfectly competitive. This fact alone relegates such models to the margins of usefulness for an industry that seeks to satisfy tenant demand in order to optimise returns on capital invested. Acknowledgment of property market imperfections are universally accepted to the extent that all contemporary texts discuss the lack of a coherent centralised market place and incomplete and poorly disseminated information processes as fundamental inadequacies which characterise the property market inefficiencies. Less well researched are the facets of the market which allow the observer to determine market activity to be significantly irrational. One such facet is that of ‘decision maker preferences’. The decision to locate a business operation at one location as opposed to another seems ostensibly a routine choice based on short, medium and long term business objectives. These objectives are derived from a process of strategic planning by one or more individuals whose goal is held to be to optimise outcomes which benefit the business (and presumably those employed within it). However the decision making processes appear bounded by how firms function, the institutional context in which they operate, as well as by opportunistic behaviour by individual decision makers who allow personal preferences to infiltrate and ‘corrupt’ the process. In this way, history, culture, geography, as well as institutions all become significant to the extent that these influence and shape individual behaviour which in turn determine the morphology of individual preferences, as well as providing a conduit for them to take effect. This paper exams historical and current literature on the impact of individual behaviour in the decision making process within organisations as a precursor to an investigation of the tenancy decision making process within the CBD office market. Literature on the topic falls within a number of research disciplines, philosophy, psychology and economics to name a few.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Most investors look at the initial return (or yield) that they will receive from an investment property, but this is only part of the picture. The more important issue is what capital appreciation will be achieved. Unless an investment property will deliver substantial capital appreciation, it is unlikely to be a good investment in financial terms.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The overall goal of the project was to provide a tool for improved investment decision making for functional performance of investment property. The evaluation examines both ex post and ex ante building performance within operational and investment contexts and considers the resultant financial, environmental and social impacts.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Queensland Department of Main Roads, Australia, spends approximately A$ 1 billion annually for road infrastructure asset management. To effectively manage road infrastructure, firstly road agencies not only need to optimise the expenditure for data collection, but at the same time, not jeopardise the reliability in using the optimised data to predict maintenance and rehabilitation costs. Secondly, road agencies need to accurately predict the deterioration rates of infrastructures to reflect local conditions so that the budget estimates could be accurately estimated. And finally, the prediction of budgets for maintenance and rehabilitation must provide a certain degree of reliability. This paper presents the results of case studies in using the probability-based method for an integrated approach (i.e. assessing optimal costs of pavement strength data collection; calibrating deterioration prediction models that suit local condition and assessing risk-adjusted budget estimates for road maintenance and rehabilitation for assessing life-cycle budget estimates). The probability concept is opening the path to having the means to predict life-cycle maintenance and rehabilitation budget estimates that have a known probability of success (e.g. produce budget estimates for a project life-cycle cost with 5% probability of exceeding). The paper also presents a conceptual decision-making framework in the form of risk mapping in which the life-cycle budget/cost investment could be considered in conjunction with social, environmental and political issues.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

A study has been conducted to investigate current practices on decision-making under risk and uncertainty for infrastructure project investments. It was found that many European countries such as the UK, France, Germany including Australia use scenarios for the investigation of the effects of risk and uncertainty of project investments. Different alternative scenarios are mostly considered during the engineering economic cost-benefit analysis stage. For instance, the World Bank requires an analysis of risks in all project appraisals. Risk in economic evaluation needs to be addressed by calculating sensitivity of the rate of return for a number of events. Risks and uncertainties of project developments arise from various sources of errors including data, model and forecasting errors. It was found that the most influential factors affecting risk and uncertainty resulted from forecasting errors. Data errors and model errors have trivial effects. It was argued by many analysts that scenarios do not forecast what will happen but scenarios indicate only what can happen from given alternatives. It was suggested that the probability distributions of end-products of the project appraisal, such as cost-benefit ratios that take forecasting errors into account, are feasible decision tools for economic evaluation. Political, social, environmental as well as economic and other related risk issues have been addressed and included in decision-making frameworks, such as in a multi-criteria decisionmaking framework. But no suggestion has been made on how to incorporate risk into the investment decision-making process.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This paper presents a comparative study of primarily Australian (and limited international) practices and guidelines on Buildings Asset Management (BAM). The objective of this study was to identify potential gaps in current practices and potential areas of research for further improvement. The paper starts with an overview of BAM. Later sections cover current BAM practices and guidelines across different states of Australia; give a limited overview of international practices and concludes with the authors’ observations.