891 resultados para Complex Project Management


Relevância:

80.00% 80.00%

Publicador:

Resumo:

Gaining or maintaining a “contractor's” competitive advantage is not easy as it is determined by a large number of factors. Identification of critical success factors (CSFs) allows one to reduce the vast number of factors to some manageable few but vital ones. Based on the CSFs, contractors' limited resources such as money and manpower can be allocated and aligned appropriately for yielding a maximum outcome of overall competitiveness. This paper describes the CSFs identified from a survey study carried out in Mainland China. The ranking analysis of the survey results shows that 35 factors are rated as critical for determining the competitiveness of a contractor. Factor analysis reveals that the 35 CSFs identified can be grouped into eight clusters, namely, project management skills, organization structure, resources, competitive strategy, relationships, bidding, marketing, and technology. The CSFs in this study provide a vehicle for guiding a contractor in managing its resources in order to improve competitive advantage. The study also provides insights into the management of competitiveness for contractors that are operating in the particular context of the Chinese construction industry.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Little attention has been focussed on a precise definition and evaluation mechanism for project management risk specifically related to contractors. When bidding, contractors traditionally price risks using unsystematic approaches. The high business failure rate our industry records may indicate that the current unsystematic mechanisms contractors use for building up contingencies may be inadequate. The reluctance of some contractors to include a price for risk in their tenders when bidding for work competitively may also not be a useful approach. Here, instead, we first define the meaning of contractor contingency, and then we develop a facile quantitative technique that contractors can use to estimate a price for project risk. This model will help contractors analyse their exposure to project risks; and help them express the risk in monetary terms for management action. When bidding for work, they can decide how to allocate contingencies strategically in a way that balances risk and reward.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

In the emerging digital economy, the management of information in aerospace and construction organisations is facing a particular challenge due to the ever-increasing volume of information and the extensive use of information and communication technologies (ICTs). This paper addresses the problems of information overload and the value of information in both industries by providing some cross-disciplinary insights. In particular it identifies major issues and challenges in the current information evaluation practice in these two industries. Interviews were conducted to get a spectrum of industrial perspectives (director/strategic, project management and ICT/document management) on these issues in particular to information storage and retrieval strategies and the contrasting approaches to knowledge and information management of personalisation and codification. Industry feedback was collected by a follow-up workshop to strengthen the findings of the research. An information-handling agenda is outlined for the development of a future Information Evaluation Methodology (IEM) which could facilitate the practice of the codification of high-value information in order to support through-life knowledge and information management (K&IM) practice.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

There is a growing concern in reducing greenhouse gas emissions all over the world. The U.K. has set 34% target reduction of emission before 2020 and 80% before 2050 compared to 1990 recently in Post Copenhagen Report on Climate Change. In practise, Life Cycle Cost (LCC) and Life Cycle Assessment (LCA) tools have been introduced to construction industry in order to achieve this such as. However, there is clear a disconnection between costs and environmental impacts over the life cycle of a built asset when using these two tools. Besides, the changes in Information and Communication Technologies (ICTs) lead to a change in the way information is represented, in particular, information is being fed more easily and distributed more quickly to different stakeholders by the use of tool such as the Building Information Modelling (BIM), with little consideration on incorporating LCC and LCA and their maximised usage within the BIM environment. The aim of this paper is to propose the development of a model-based LCC and LCA tool in order to provide sustainable building design decisions for clients, architects and quantity surveyors, by then an optimal investment decision can be made by studying the trade-off between costs and environmental impacts. An application framework is also proposed finally as the future work that shows how the proposed model can be incorporated into the BIM environment in practise.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

There are a number of challenges associated with managing knowledge and information in construction organizations delivering major capital assets. These include the ever-increasing volumes of information, losing people because of retirement or competitors, the continuously changing nature of information, lack of methods on eliciting useful knowledge, development of new information technologies and changes in management and innovation practices. Existing tools and methodologies for valuing intangible assets in fields such as engineering, project management and financial, accounting, do not address fully the issues associated with the valuation of information and knowledge. Information is rarely recorded in a way that a document can be valued, when either produced or subsequently retrieved and re-used. In addition there is a wealth of tacit personal knowledge which, if codified into documentary information, may prove to be very valuable to operators of the finished asset or future designers. This paper addresses the problem of information overload and identifies the differences between data, information and knowledge. An exploratory study was conducted with a leading construction consultant examining three perspectives (business, project management and document management) by structured interviews and specifically how to value information in practical terms. Major challenges in information management are identified. An through-life Information Evaluation methodology (IEM) is presented to reduce information overload and to make the information more valuable in the future.

Relevância:

80.00% 80.00%

Publicador:

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Construction planning plays a fundamental role in construction project management that requires team working among planners from a diverse range of disciplines and in geographically dispersed working situations. Model-based four-dimensional (4D) computer-aided design (CAD) groupware, though considered a possible approach to supporting collaborative planning, is still short of effective collaborative mechanisms for teamwork due to methodological, technological and social challenges. Targeting this problem, this paper proposes a model-based groupware solution to enable a group of multidisciplinary planners to perform real-time collaborative 4D planning across the Internet. In the light of the interactive definition method, and its computer-supported collaborative work (CSCW) design analysis, the paper discusses the realization of interactive collaborative mechanisms from software architecture, application mode, and data exchange protocol. These mechanisms have been integrated into a groupware solution, which was validated by a planning team in a truly geographically dispersed condition. Analysis of the validation results revealed that the proposed solution is feasible for real-time collaborative 4D planning to gain a robust construction plan through collaborative teamwork. The realization of this solution triggers further considerations about its enhancement for wider groupware applications.

Relevância:

80.00% 80.00%

Publicador:

Relevância:

80.00% 80.00%

Publicador:

Relevância:

80.00% 80.00%

Publicador:

Relevância:

80.00% 80.00%

Publicador:

Resumo:

The coordination of work and expertise in construction projects is often treated in terms of models or formal rules. However, much is to be gained, if we are to understand it, by examining actual coordination practices. The objective in this article is to address practices of coordination of expertise in the context of design team meetings. The focus is specifically on conversational practices between the structural engineer and the landscape architect part of the design team in a healthcare infrastructure project. The central argument is that the coordination of expertise relied on and was organised by mundane and everyday methods, and not by formal and abstract ones. This argument is drawn from ethnomethodology, a form of sociological analysis that focuses on the situated methods by which activities are produced, but shares concerns found in the literature on actual project management practices. The ethnomethodological stance, however, offers a different perspective on the significance of the empirical reality of projects and a possibility to incorporate within this literature a concern with the ordinary methodical organisation of project activities.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

The United Kingdom is committed to a raft of requirements to create a low-carbon economy. Buildings consume approximately 40% of UK energy demand. Any improvement on the energy performance of buildings therefore can significantly contribute to the delivery of a low-carbon economy. The challenge for the construction sector and its clients is how to meet the policy requirements to deliver low and zero carbon (LZC) buildings, which spans broader than the individual building level, to requirements at the local and regional levels, and wider sustainability pressures. Further, the construction sector is reporting skills shortages coupled with the need for ‘new skills’ for the delivery of LZC buildings. The aim of this paper is to identify, and better understand, the skills required by the construction sector and its clients for the delivery of LZC buildings within a region. The theoretical framing for this research is regional innovation system (RIS) using a socio-technical network analysis (STNA) methodology. A case study of a local authority region is presented. Data is drawn from a review of relevant local authority documentation, observations and semi-structured interviews from one (project 1) of five school retrofit projects within the region. The initial findings highlight the complexity surrounding the form and operation of the LZC network for project 1. The skills required by the construction sector and its clients are connected to different actor roles surrounding the delivery of the project. The key actors involved and their required skills are: project management and energy management skills required by local authority; project management skills (in particular project planning), communication and research skills required by school end-users; and a ‘technical skill’ relating to knowledge of a particular energy efficient measure (EEM) and use of equipment to implement the EEM is required by the EEM contractors.