829 resultados para 120201 Building Construction Management and Project Planning


Relevância:

100.00% 100.00%

Publicador:

Resumo:

This paper presents the results of performance monitoring under real winter weather conditions, controlled laboratory testing and computational fluid dynamics (CFD) analysis of a wall mounted ventilation air inlet heat convector. For real winter weather monitoring, the wall-mounted convector was installed in a laboratory room of the Engineering Building of the School of Construction Management and Engineering. Air and hot water temperatures and air speeds were measured at the entrance to the convector and in the room. The hot water temperature was controlled at 40, 60 and 80 °C. The monitoring results were later used as boundary conditions for a CFD simulation to investigate the air movement in the room. Controlled laboratory testing was conducted in laboratories at the University of Reading, UK and at Wetterstad Consultancy, Sweden. The results of the performance investigation showed that the system contributed greatly to the room heating, particularly at a water temperature of 80 °C. Also adequate fresh air was supplied to the room. Such a system is able to provide an energy efficient method of eliminating problems associated with cold winter draughts.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Strategy is a contested concept. The generic literature is characterized by a diverse range of competing theories and alternative perspectives. Traditional models of the competitive strategy of construction firms have tended to focus on exogenous factors. In contrast, the resource-based view of strategic management emphasizes the importance of endogenous factors. The more recently espoused concept of dynamic capabilities extends consideration beyond static resources to focus on the ability of firms to reconfigure their operating routines to enable responses to changing environments. The relevance of the dynamics capabilities framework to the construction sector is investigated through an exploratory case study of a regional contractor. The focus on how firms continuously adapt to changing environments provides new insights into competitive strategy in the construction sector. Strong support is found for the importance of path dependency in shaping strategic choice. The case study further suggests that strategy is a collective endeavour enacted by a loosely defined group of individual actors. Dynamic capabilities are characterized by an empirical elusiveness and as such are best construed as situated practices embedded within a social and physical context.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Anticipating the future is increasingly being seen as a useful way to align, direct and improve current organizational strategy. Several such 'future studies' have been produced which envision various construction industry scenarios which result from technological and socio-economic trends and influences. Thirteen construction-related future studies are critically reviewed. Most studies fail to address the complexities and uncertainties of both the present and the future, and fail to explore the connections between global, local, construction-specific and more widespread factors. The methodological approaches used in these studies do not generate any significantly different advice or recommendations for the industry than those emerging from the much larger canon of non-future oriented construction research. As such, these reports are less about the future than the present. If future studies are to make a worthwhile contribution to construction, it is critical that they develop our appreciation of the practical ability of stakeholders to influence some aspects of the future and not others, and an awareness of the competing agendas and the relative benefits and disadvantages of specific futures within the construction sector. Only then can future studies provide insights and help in preparing for the opportunities and threats the future may bring.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The desirable coverage of the journal is considered including the need to focus on research which can lead to positive action. Criteria for establishing the desirability of research projects are proposed and these are then applied first, to four broad issues and, secondly, to the inputs and other requirements for a well functioning industry. Some conclusions are drawn as to the research most likely to enable action to be taken to improve the industry. It is found that certain other difficulties can sometimes be dealt with by experimentation with actual projects or, where there is consensus on desirable action, by bringing pressure to bear on those able to initiate change.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

FIDIC has over the years produced standard forms of contracts for the international procurement of projects. A source of continuing criticism of its Red Book concerns the duality in the traditional role of the engineer as the employer's agent and as an independent third party holding the balance fairly between the employer and the contractor. In response to this and other criticisms FIDIC produced a replacement for it in 1999. The role of the engineer under the new Red Book is critically examined in the light of relevant case law, expert commentaries and feedback from two multidisciplinary workshops with international participation. The examination identified three major changes: (1) a duty to act impartially has been replaced by a duty to make fair determination of certain matters; (2) it is open to parties to allow greater control of the engineer by the employer by stating in the appropriate part of the contract powers the engineer must not exercise without the employer's approval; (3) there is provision for a Dispute Adjudication Board (DAB) to which disputes may be referred. Although the duality has not been eliminated completely, the contract is structured flexibly enough to support those who wish to contract on the basis of the engineer acting solely as the agent of the employer.

Relevância:

100.00% 100.00%

Publicador:

Relevância:

100.00% 100.00%

Publicador:

Resumo:

In the tender process, contractors often rely on subcontract and supply enquiries to calculate their bid prices. However, this integral part of the bidding process is not empirically articulated in the literature. Over 30 published materials on the tendering process of contractors that talk about enquiries were reviewed and found to be based mainly on experiential knowledge rather than systematic evidence. The empirical research here helps to describe the process of enquiries precisely, improve it in practice, and have some basis to support it in theory. Using a live participant observation case study approach, the whole tender process was shadowed in the offices of two of the top 20 UK civil engineering construction firms. This helped to investigate 15 research questions on how contractors enquire and obtain prices from subcontractors and suppliers. Forty-three subcontract enquiries and 18 supply enquiries were made across two different projects with average value of 7m. An average of 15 subcontract packages and seven supply packages was involved. Thus, two or three subcontractors or suppliers were invited to bid in each package. All enquiries were formulated by the estimator, with occasional involvement of three other personnel. Most subcontract prices were received in an average of 14 working days; and supply prices took five days. The findings show 10 main activities involved in processing enquiries and their durations, as well as wasteful practices associated with enquiries. Contractors should limit their enquiry invitations to a maximum of three per package, and optimize the waiting time for quotations in order to improve cost efficiency.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

From a construction perspective, Public-Private Partnership projects (PPPs) are often credited as providing real incentives for the actors involved as well as a business environment that is conducive to innovation and improved practices. The validity of four common rhetorical arguments used to promote the PPP procurement route is explored: collaborative working, design freedom, long-term commitment and risk transfer. Particular interest is given to the extent to which espoused intentions correlate with experienced realities in allowing actors involved in the design and construction phases to be presented with, and able to exploit, opportunities for technological innovation. It is argued that there is reason to be cautious in fully accepting the purported benefits of the PPP framework and that the arguments often presented need to be revised. Alternative interpretations are provided.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Gaining or maintaining a “contractor's” competitive advantage is not easy as it is determined by a large number of factors. Identification of critical success factors (CSFs) allows one to reduce the vast number of factors to some manageable few but vital ones. Based on the CSFs, contractors' limited resources such as money and manpower can be allocated and aligned appropriately for yielding a maximum outcome of overall competitiveness. This paper describes the CSFs identified from a survey study carried out in Mainland China. The ranking analysis of the survey results shows that 35 factors are rated as critical for determining the competitiveness of a contractor. Factor analysis reveals that the 35 CSFs identified can be grouped into eight clusters, namely, project management skills, organization structure, resources, competitive strategy, relationships, bidding, marketing, and technology. The CSFs in this study provide a vehicle for guiding a contractor in managing its resources in order to improve competitive advantage. The study also provides insights into the management of competitiveness for contractors that are operating in the particular context of the Chinese construction industry.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Academia has a critical role in developing new knowledge which construction industry practitioners need to envision, undertake and sustain successful innovation. The new knowledge produced by academia, however, often does not satisfy the needs of practitioners. This unsatisfactory state of affairs is frequently taken to be the consequence of the cultural, motivational and operational differences between the two communities. Actionable knowledge is presented as a useful concept which can fuse the expectations, contributions and outputs of academia and practitioners. Within this context, action research is argued to be an appropriate methodology to develop successful actionable knowledge. Results from an action research project are given which provide researchers and practitioners greater understanding of the key factors that shape the degree to which action research produces actionable knowledge: change focus, collaboration capabilities and systematic process. The criteria intrinsic to Mode 2 research (Gibbons et al., 1994) are demonstrated to have utility in evidencing actionable knowledge. The implication for policy is that there is a need to develop and use appropriate actionable knowledge frameworks and measures to design funding calls, and to evaluate research proposals and outputs.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Climate change is one of the major challenges facing economic systems at the start of the 21st century. Reducing greenhouse gas emissions will require both restructuring the energy supply system (production) and addressing the efficiency and sufficiency of the social uses of energy (consumption). The energy production system is a complicated supply network of interlinked sectors with 'knock-on' effects throughout the economy. End use energy consumption is governed by complex sets of interdependent cultural, social, psychological and economic variables driven by shifts in consumer preference and technological development trajectories. To date, few models have been developed for exploring alternative joint energy production-consumption systems. The aim of this work is to propose one such model. This is achieved in a methodologically coherent manner through integration of qualitative input-output models of production, with Bayesian belief network models of consumption, at point of final demand. The resulting integrated framework can be applied either (relatively) quickly and qualitatively to explore alternative energy scenarios, or as a fully developed quantitative model to derive or assess specific energy policy options. The qualitative applications are explored here.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This conceptual paper aims to improve our understanding of how internationalised firms use outsourcing and offshoring strategies to manage knowledge and information through the life-cycle of integrated product-service solutions. More precisely, we identify the appropriate theoretical framework for this analysis and investigate through in-depth case studies how UK engineering firms organise, coordinate, and incentivise work that is executed in globally distributed teams. Our research focuses on their UK and India offices to study the organisation and governance of distributed teams. The research has several theoretical dimensions - organization; geography; time and knowledge - that it addresses as boundary challenges.