974 resultados para simulation-optimization


Relevância:

20.00% 20.00%

Publicador:

Resumo:

Trabalho Final de Mestrado para obtenção do grau de Mestre em Engenharia de Electrónica e Telecomunicações

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Competitive electricity markets have arisen as a result of power-sector restructuration and power-system deregulation. The players participating in competitive electricity markets must define strategies and make decisions using all the available information and business opportunities.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This paper presents a modified Particle Swarm Optimization (PSO) methodology to solve the problem of energy resources management with high penetration of distributed generation and Electric Vehicles (EVs) with gridable capability (V2G). The objective of the day-ahead scheduling problem in this work is to minimize operation costs, namely energy costs, regarding he management of these resources in the smart grid context. The modifications applied to the PSO aimed to improve its adequacy to solve the mentioned problem. The proposed Application Specific Modified Particle Swarm Optimization (ASMPSO) includes an intelligent mechanism to adjust velocity limits during the search process, as well as self-parameterization of PSO parameters making it more user-independent. It presents better robustness and convergence characteristics compared with the tested PSO variants as well as better constraint handling. This enables its use for addressing real world large-scale problems in much shorter times than the deterministic methods, providing system operators with adequate decision support and achieving efficient resource scheduling, even when a significant number of alternative scenarios should be considered. The paper includes two realistic case studies with different penetration of gridable vehicles (1000 and 2000). The proposed methodology is about 2600 times faster than Mixed-Integer Non-Linear Programming (MINLP) reference technique, reducing the time required from 25 h to 36 s for the scenario with 2000 vehicles, with about one percent of difference in the objective function cost value.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Although power-line communication (PLC) is not a new technology, its use to support communication with timing requirements is still the focus of ongoing research. Recently, a new infrastructure was presented, intended for communication using power lines from a central location to geographically dispersed nodes using inexpensive devices. This new infrastructure uses a two-level hierarchical power-line system, together with an IP-based network. Within this infrastructure, in order to provide end-toend communication through the two levels of the powerline system, it is necessary to fully understand the behaviour of the underlying network layers. The masterslave behaviour of the PLC MAC, together with the inherent dynamic topology of power-line networks are important issues that must be fully characterised. Therefore, in this paper we present a simulation model which is being used to study and characterise the behaviour of power-line communication.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Modern real-time systems, with a more flexible and adaptive nature, demand approaches for timeliness evaluation based on probabilistic measures of meeting deadlines. In this context, simulation can emerge as an adequate solution to understand and analyze the timing behaviour of actual systems. However, care must be taken with the obtained outputs under the penalty of obtaining results with lack of credibility. Particularly important is to consider that we are more interested in values from the tail of a probability distribution (near worst-case probabilities), instead of deriving confidence on mean values. We approach this subject by considering the random nature of simulation output data. We will start by discussing well known approaches for estimating distributions out of simulation output, and the confidence which can be applied to its mean values. This is the basis for a discussion on the applicability of such approaches to derive confidence on the tail of distributions, where the worst-case is expected to be.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

A number of characteristics are boosting the eagerness of extending Ethernet to also cover factory-floor distributed real-time applications. Full-duplex links, non-blocking and priority-based switching, bandwidth availability, just to mention a few, are characteristics upon which that eagerness is building up. But, will Ethernet technologies really manage to replace traditional Fieldbus networks? Ethernet technology, by itself, does not include features above the lower layers of the OSI communication model. In the past few years, it is particularly significant the considerable amount of work that has been devoted to the timing analysis of Ethernet-based technologies. It happens, however, that the majority of those works are restricted to the analysis of sub-sets of the overall computing and communication system, thus without addressing timeliness at a holistic level. To this end, we are addressing a few inter-linked research topics with the purpose of setting a framework for the development of tools suitable to extract temporal properties of Commercial-Off-The-Shelf (COTS) Ethernet-based factory-floor distributed systems. This framework is being applied to a specific COTS technology, Ethernet/IP. In this paper, we reason about the modelling and simulation of Ethernet/IP-based systems, and on the use of statistical analysis techniques to provide usable results. Discrete event simulation models of a distributed system can be a powerful tool for the timeliness evaluation of the overall system, but particular care must be taken with the results provided by traditional statistical analysis techniques.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

In the past few years, a significant amount of work has been devoted to the timing analysis of Ethernet-based technologies. However, none of these address the problem of timeliness evaluation at a holistic level. This paper describes a research framework embracing this objective. It is advocated that, simulation models can be a powerful tool, not only for timeliness evaluation, but also to enable the introduction of less pessimistic assumptions in an analytical response time approach, which, most often, are afflicted with simplifications leading to pessimistic assumptions and, therefore, delusive results. To this end, we address a few inter-linked research topics with the purpose of setting a framework for developing tools suitable to extract temporal properties of commercial-off-the-shelf (COTS) factory-floor communication systems.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

It is generally challenging to determine end-to-end delays of applications for maximizing the aggregate system utility subject to timing constraints. Many practical approaches suggest the use of intermediate deadline of tasks in order to control and upper-bound their end-to-end delays. This paper proposes a unified framework for different time-sensitive, global optimization problems, and solves them in a distributed manner using Lagrangian duality. The framework uses global viewpoints to assign intermediate deadlines, taking resource contention among tasks into consideration. For soft real-time tasks, the proposed framework effectively addresses the deadline assignment problem while maximizing the aggregate quality of service. For hard real-time tasks, we show that existing heuristic solutions to the deadline assignment problem can be incorporated into the proposed framework, enriching their mathematical interpretation.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

As operações de separação por adsorção têm vindo a ganhar importância nos últimos anos, especialmente com o desenvolvimento de técnicas de simulação de leitos móveis em colunas, tal como a cromatografia de Leito Móvel Simulado (Simulated Moving Bed, SMB). Esta tecnologia foi desenvolvida no início dos anos 60 como método alternativo ao processo de Leito Móvel Verdadeiro (True Moving Bed, TMB), de modo a resolver vários dos problemas associados ao movimento da fase sólida, usuais nestes métodos de separação cromatográficos de contracorrente. A tecnologia de SMB tem sido amplamente utilizada em escala industrial principalmente nas indústrias petroquímica e de transformação de açúcares e, mais recentemente, na indústria farmacêutica e de química fina. Nas últimas décadas, o crescente interesse na tecnologia de SMB, fruto do alto rendimento e eficiente consumo de solvente, levou à formulação de diferentes modos de operação, ditos não convencionais, que conseguem unidades mais flexíveis, capazes de aumentar o desempenho de separação e alargar ainda mais a gama de aplicação da tecnologia. Um dos exemplos mais estudados e implementados é o caso do processo Varicol, no qual se procede a um movimento assíncrono de portas. Neste âmbito, o presente trabalho foca-se na simulação, análise e avaliação da tecnologia de SMB para dois casos de separação distintos: a separação de uma mistura de frutose-glucose e a separação de uma mistura racémica de pindolol. Para ambos os casos foram considerados e comparados dois modos de operação da unidade de SMB: o modo convencional e o modo Varicol. Desta forma, foi realizada a implementação e simulação de ambos os casos de separação no simulador de processos Aspen Chromatography, mediante a utilização de duas unidades de SMB distintas (SMB convencional e SMB Varicol). Para a separação da mistura frutose-glucose, no quediz respeito à modelização da unidade de SMB convencional, foram utilizadas duas abordagens: a de um leito móvel verdadeiro (modelo TMB) e a de um leito móvel simulado real (modelo SMB). Para a separação da mistura racémica de pindolol foi considerada apenas a modelização pelo modelo SMB. No caso da separação da mistura frutose-glucose, procedeu-se ainda à otimização de ambas as unidades de SMB convencional e Varicol, com o intuito do aumento das suas produtividades. A otimização foi realizada mediante a aplicação de um procedimento de planeamento experimental, onde as experiências foram planeadas, conduzidas e posteriormente analisadas através da análise de variância (ANOVA). A análise estatística permitiu selecionar os níveis dos fatores de controlo de modo a obter melhores resultados para ambas as unidades de SMB.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Trabalho Final de Mestrado para obtenção do grau de Mestre Em Engenharia Química e Biológica Ramo de processos Químicos

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Dissertação para obtenção do grau de Mestre em Engenharia Electrotécnica Ramo de Energia

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This paper presents a distributed predictive control methodology for indoor thermal comfort that optimizes the consumption of a limited shared energy resource using an integrated demand-side management approach that involves a power price auction and an appliance loads allocation scheme. The control objective for each subsystem (house or building) aims to minimize the energy cost while maintaining the indoor temperature inside comfort limits. In a distributed coordinated multi-agent ecosystem, each house or building control agent achieves its objectives while sharing, among them, the available energy through the introduction of particular coupling constraints in their underlying optimization problem. Coordination is maintained by a daily green energy auction bring in a demand-side management approach. Also the implemented distributed MPC algorithm is described and validated with simulation studies.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Traditional vertically integrated power utilities around the world have evolved from monopoly structures to open markets that promote competition among suppliers and provide consumers with a choice of services. Market forces drive the price of electricity and reduce the net cost through increased competition. Electricity can be traded in both organized markets or using forward bilateral contracts. This article focuses on bilateral contracts and describes some important features of an agent-based system for bilateral trading in competitive markets. Special attention is devoted to the negotiation process, demand response in bilateral contracting, and risk management. The article also presents a case study on forward bilateral contracting: a retailer agent and a customer agent negotiate a 24h-rate tariff. © 2014 IEEE.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

A new integrated mathematical model for the simulation of offshore wind energy conversion system performance is presented in this paper. The mathematical model considers an offshore variable-speed turbine in deep water equipped with a permanent magnet synchronous generator using full-power two-level converter, converting the energy of a variable frequency source in injected energy into the electric network with constant frequency, through a high voltage DC transmission submarine cable. The mathematical model for the drive train is a concentrate two mass model which incorporates the dynamic for the structure and tower due to the need to emulate the effects of the moving surface. Controller strategy considered is a proportional integral one. Also, pulse width modulation using space vector modulation supplemented with sliding mode is used for trigger the transistor of the converter. Finally, a case study is presented to access the system performance. © 2014 IEEE.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This paper proposes a stochastic mixed-integer linear approach to deal with a short-term unit commitment problem with uncertainty on a deregulated electricity market that includes day-ahead bidding and bilateral contracts. The proposed approach considers the typically operation constraints on the thermal units and a spinning reserve. The uncertainty is due to the electricity prices, which are modeled by a scenario set, allowing an acceptable computation. Moreover, emission allowances are considered in a manner to allow for the consideration of environmental constraints. A case study to illustrate the usefulness of the proposed approach is presented and an assessment of the cost for the spinning reserve is obtained by a comparison between the situation with and without spinning reserve.