992 resultados para planning authority
Resumo:
Planning with partial observability can be formulated as a non-deterministic search problem in belief space. The problem is harder than classical planning as keeping track of beliefs is harder than keeping track of states, and searching for action policies is harder than searching for action sequences. In this work, we develop a framework for partial observability that avoids these limitations and leads to a planner that scales up to larger problems. For this, the class of problems is restricted to those in which 1) the non-unary clauses representing the uncertainty about the initial situation are nvariant, and 2) variables that are hidden in the initial situation do not appear in the body of conditional effects, which are all assumed to be deterministic. We show that such problems can be translated in linear time into equivalent fully observable non-deterministic planning problems, and that an slight extension of this translation renders the problem solvable by means of classical planners. The whole approach is sound and complete provided that in addition, the state-space is connected. Experiments are also reported.
Resumo:
Iowa’s Statewide Transportation Improvement Program (STIP) has been developed in conformance with the guidelines prescribed by 23 U.S.C. and 49 U.S.C. The STIP is generated to provide the Federal Highway Administration and Federal Transit Administration a listing of all projects that are candidates for federal aid from the FHWA and FTA for four federal fiscal years (FFY). The 2015-2018 STIP was approved by FHWA and FTA on September 16, 2014. Preceding the listings of federal-aid candidates are general comments concerning Iowa’s public participation process for selection of federal-aid projects and the basis for funding the proposed projects. Documents evidencing the Iowa Department of Transportation’s authority to act concerning matters related to transportation, federal-aid expenditures and approvals of metropolitan planning organizations’ (MPOs), transportation improvements programs (TIPs) have been provided in past STIPs and can be provided again upon request.
Resumo:
Iowa’s Statewide Transportation Improvement Program (STIP) has been developed in conformance with the guidelines prescribed by 23 U.S.C. and 49 U.S.C. The STIP is generated to provide the Federal Highway Administration and Federal Transit Administration a listing of all projects that are candidates for federal aid from the FHWA and FTA for four federal fiscal years (FFY). The 2015-2018 STIP was approved by FHWA and FTA on September 16, 2014. Preceding the listings of federal-aid candidates are general comments concerning Iowa’s public participation process for selection of federal-aid projects and the basis for funding the proposed projects. Documents evidencing the Iowa Department of Transportation’s authority to act concerning matters related to transportation, federal-aid expenditures and approvals of metropolitan planning organizations’ (MPOs), transportation improvements programs (TIPs) have been provided in past STIPs and can be provided again upon request.
Resumo:
Iowa’s Statewide Transportation Improvement Program (STIP) has been developed in conformance with the guidelines prescribed by 23 U.S.C. and 49 U.S.C. The STIP is generated to provide the Federal Highway Administration and Federal Transit Administration a listing of all projects that are candidates for federal aid from the FHWA and FTA for four federal fiscal years (FFY). Preceding the listings of federal-aid candidates are general comments concerning Iowa’s public participation process for selection of federal-aid projects and the basis for funding the proposed projects. Documents evidencing the Iowa Department of Transportation’s authority to act concerning matters related to transportation, federal-aid expenditures and approvals of metropolitan planning organizations’ (MPOs), transportation improvements programs (TIPs) have been provided in past STIPs and can be provided again upon request.
Resumo:
Des del 1995 el Consell Europeu ha promogut l’aprenentatge d’una segona llengua a través d’una altra àrea en el que coneixem per CLIL (Contingut i Llengua Integrats en l’Aprenentatge) o en altres paraules: “una activitat en la qual l’aprenentatge d’una llengua estrangera és utilitzada com una eina per l’aprenentatge d’una àrea no linguística en la qual llengua i contingut tenen un mateix paper” (Marsh, 2002). Tot I així, “ensenyar una àrea a través d’una llengua estrangera no és el mateix que la integració de llengua i contingut”. CLIL comporta altres implicacions metodològiques pel que fa a la planificació, estratègies didàctiques i particularment al rol del docent. De fet, són aquests factors els que componen l’èxit o el fracàs en l’implementació de CLIL. i per aquest motiu pretenc analitzar i descriure les diferències entre una sessió de CLIL i una de llengua anglesa. Aquesta investigació és un estudi de cas que vol oferir una mirada a les diferències entre una unitat de CLIL i una de llengua anglesa portades a terme en un grup de 3r de primària a l’escola de Sant Miquel dels Sants (Vic) pel que fa a la planificació, les estratègies i actuacions del docent.
Resumo:
Agency Performance Plan
Resumo:
This report outlines the strategic plan for Iowa Finance Authority, goals and mission.
Resumo:
Audit report on the Waste Authority of Jackson County for the year ended June 30, 2014
Resumo:
Agency Performance Plan, Iowa Lottery Authority
Resumo:
Agency Performance Plan