998 resultados para Transit Planning


Relevância:

20.00% 20.00%

Publicador:

Resumo:

Considering ultrasound propagation through complex composite media as an array of parallel sonic rays, a comparison of computer simulated prediction with experimental data has previously been reported for transmission mode (where one transducer serves as transmitter, the other as receiver) in a series of ten acrylic step-wedge samples, immersed in water, exhibiting varying degrees of transit time inhomogeneity. In this study, the same samples were used but in pulse-echo mode, where the same ultrasound transducer served as both transmitter and receiver, detecting both ‘primary’ (internal sample interface) and ‘secondary’ (external sample interface) echoes. A transit time spectrum (TTS) was derived, describing the proportion of sonic rays with a particular transit time. A computer simulation was performed to predict the transit time and amplitude of various echoes created, and compared with experimental data. Applying an amplitude-tolerance analysis, 91.7±3.7% of the simulated data was within ±1 standard deviation (STD) of the experimentally measured amplitude-time data. Correlation of predicted and experimental transit time spectra provided coefficients of determination (R2) ranging from 100.0% to 96.8% for the various samples tested. The results acquired from this study provide good evidence for the concept of parallel sonic rays. Further, deconvolution of experimental input and output signals has been shown to provide an effective method to identify echoes otherwise lost due to phase cancellation. Potential applications of pulse-echo ultrasound transit time spectroscopy (PE-UTTS) include improvement of ultrasound image fidelity by improving spatial resolution and reducing phase interference artefacts.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The acceptance of broadband ultrasound attenuation (BUA) for the assessment of osteoporosis suffers from a limited understanding of both ultrasound wave propagation through cancellous bone and its exact dependence upon the material and structural properties. It has recently been proposed that ultrasound wave propagation in cancellous bone may be described by a concept of parallel sonic rays; the transit time of each ray defined by the proportion of bone and marrow propagated. A Transit Time Spectrum (TTS) describes the proportion of sonic rays having a particular transit time, effectively describing the lateral inhomogeneity of transit times over the surface aperture of the receive ultrasound transducer. The aim of this study was to test the hypothesis that the solid volume fraction (SVF) of simplified bone:marrow replica models may be reliably estimated from the corresponding ultrasound transit time spectrum. Transit time spectra were derived via digital deconvolution of the experimentally measured input and output ultrasonic signals, and compared to predicted TTS based on the parallel sonic ray concept, demonstrating agreement in both position and amplitude of spectral peaks. Solid volume fraction was calculated from the TTS; agreement between true (geometric calculation) with predicted (computer simulation) and experimentally-derived values were R2=99.9% and R2=97.3% respectively. It is therefore envisaged that ultrasound transit time spectroscopy (UTTS) offers the potential to reliably estimate bone mineral density and hence the established T-score parameter for clinical osteoporosis assessment.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The quality of ultrasound computed tomography imaging is primarily determined by the accuracy of ultrasound transit time measurement. A major problem in analysis is the overlap of signals making it difficult to detect the correct transit time. The current standard is to apply a matched-filtering approach to the input and output signals. This study compares the matched-filtering technique with active set deconvolution to derive a transit time spectrum from a coded excitation chirp signal and the measured output signal. The ultrasound wave travels in a direct and a reflected path to the receiver, resulting in an overlap in the recorded output signal. The matched-filtering and deconvolution techniques were applied to determine the transit times associated with the two signal paths. Both techniques were able to detect the two different transit times; while matched-filtering has a better accuracy (0.13 μs vs. 0.18 μs standard deviation), deconvolution has a 3.5 times improved side-lobe to main-lobe ratio. A higher side-lobe suppression is important to further improve image fidelity. These results suggest that a future combination of both techniques would provide improved signal detection and hence improved image fidelity.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This study analyses British military planning and actions during the Suez Crisis in 1956. It seeks to find military reasons for the change of concepts during the planning and compares these reasons with the tactical doctrines of the time. The thesis takes extensive advantage of military documents preserved in the National Archives, London. In order to expand the understanding of the exchange of views during the planning process, the private papers of high ranking military officials have also been consulted. French military documents preserved in the Service Historique de la Defence, Paris, have provided an important point of comparison. The Suez Crisis caught the British armed forces in the middle of a transition phase. The main objective of the armed forces was to establish a credible deterrence against the Soviet Union. However, due to overseas commitments the Middle East playing a paramount role because of its economic importance the armed forces were compelled to also prepare for Limited War and the Cold War. The armed forces were not fully prepared to meet this demand. The Middle Eastern garrison was being re-organised after the withdrawal from the Canal Base and the concept for a strategic reserve was unimplemented. The tactical doctrines of the time were based on experiences from the Second World War. As a result, the British view of amphibious operations and the subsequent campaigns emphasised careful planning, mastery of the sea and the air, sufficient superiority in numbers and firepower, centralised command and extensive administrative preparations. The British military had realized that Nasser could nationalise the Suez Canal and prepared an outline plan to meet this contingency. Although the plan was nothing more than a concept, it was accepted as a basis for further planning when the Canal was nationalised at the end of July. This plan was short-lived. The nominated Task Force Commanders shifted the landing site from Port Said to Alexandria because it enabled faster expansion of the bridgehead. In addition, further operations towards Cairo the hub of Nasser s power would be easier to conduct. The operational concept can be described as being traditional and was in accordance with the amphibious warfare doctrine. This plan was completely changed at the beginning of September. Apparently, General Charles Keightley, the Commander-in-Chief, and the Chairman of the Chiefs of Staff Committee developed the idea of prolonged aerial operations. The essence of the concept was to break the Egyptian will to resist by attacking the oil facilities, the transportation system and the armed forces. This victory through air concept would be supported by carefully planned psychological operations. This concept was in accordance with the Royal Air Force doctrine, which promoted a bomber offensive against selected target categories. General Keightley s plan was accepted despite suspicions at every planning level. The Joint Planning Staff and the Task Force Commanders opposed the concept from the beginning to the end because of its unpredictability. There was no information that suggested the bombing would persuade the Egyptians to submit. This problem was worsened by the fact that British intelligence was unable to provide reliable strategic information. The Task Force Commanders, who were responsible for the tactical plans, were not able to change Keightley s mind, but the concept was expanded to include a traditional amphibious assault on Port Said due to their resistance. The bombing campaign was never tested as the Royal Air Force was denied authorisation to destroy the transportation and oil targets. The Chiefs of Staff and General Keightley were too slow to realise that the execution of the plan depended on the determination of the Prime Minister. However, poor health, a lack of American and domestic support and the indecisiveness of the military had ruined Eden s resolve. In the end, a very traditional amphibious assault, which was bound to succeed at the tactical level but fail at the strategic level, was launched against Port Said.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This paper investigates quality of service (QoS) and resource productivity implications of transit route passenger loading and travel time. It highlights the value of occupancy load factor as a direct passenger comfort QoS measure. Automatic Fare Collection data for a premium radial bus route in Brisbane, Australia, is used to investigate time series correlation between occupancy load factor and passenger average travel time. Correlation is strong across the entire span of service in both directions. Passengers tend to be making longer, peak direction commuter trips under significantly less comfortable conditions than off-peak. The Transit Capacity and Quality of Service Manual uses segment based load factor as a measure of onboard loading comfort QoS. This paper provides additional insight into QoS by relating the two route based dimensions of occupancy load factor and passenger average travel time together in a two dimensional format, both from the passenger’s and operator’s perspectives. Future research will apply Value of Time to QoS measurement, reflecting perceived passenger comfort through crowding and average time spent onboard. This would also assist in transit service quality econometric modeling. The methodology can be readily applied in a practical setting where AFC data for fixed scheduled routes is available. The study outcomes also provide valuable research and development directions.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The relationship between governance arrangements and sustainability planning outcomes in complex governance systems remains poorly understood, despite significant discussions of governance in the environmental management literature emerging in the last decade. In order to analyse and examine the relationship between the health of sustainability planning governance and decision-making outcomes, this paper applies the Governance Systems Analysis framework (GSA) in the Cairns region. This paper analyses the sustainability planning governance arrangements in the Cairns region by exploring the capacity, connectivity and knowledge use of institutions in the region to deliver desired sustainability planning outcomes. The paper finds that the planning for sustainability in the Cairns region is on a knife’s edge, and could fail or succeed to deliver its intended decision-making outcomes. The paper concludes with recommendations for governance reform for sustainability in the Cairns region.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Purpose A retrospective planning study comparing volumetric arc therapy (VMAT) and stereotactic body radiotherapy (SBRT) treatment plans for non-small cell lung cancer (NSCLC). Methods and materials Five randomly selected early stage lung cancer patients were included in the study. For each patient, four plans were created: the SBRT plan and three VMAT plans using different optimisation methodologies. A total of 20 different plans were evaluated. The dose parameters of dose conformity results and the target dose constraints results were compared for these plans. Results The mean planning target volume (PTV) for all the plans (SBRT and VMAT) was 18·3 cm3, with a range from 15·6 to 20·1 cm3. The maximum dose tolerance to 1 cc of all the plans was within 140% (84 Gy) of the prescribed dose, and 95% of the PTV of all the plans received 100% of the prescribed dose (60 Gy). In all the plans, 99% of the PTV received a dose >90% of the prescribed dose, and the mean dose in all the plans ranged from 67 to 72 Gy. The planning target dose conformity for the SBRT and the VMAT (0°, 15° collimator single arc plans and dual arc) plans showed the tightness of the prescription isodose conformity to the target. Conclusions SBRT and VMAT are radiotherapy approaches that increase doses to small tumour targets without increasing doses to the organs at risk. Although VMAT offers an alternative to SBRT for NSCLC and the potential advantage of VMAT is the reduced treatment times over SBRT, the statistical results show that there was no significant difference between the SBRT and VMAT optimised plans in terms of dose conformity and organ-at-risk sparing.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

When tropical cyclone Larry crossed the Queensland coast on 20 March 2006, commercial, recreational and naval vessels in the port of Cairns, 60 km north of the eye of the cyclone and others closer to the eye, were protected from the destructive winds by sheltering in deep mangrove creeks in Trinity Inlet and off other coastal rivers. The Trinity Inlet mangroves are protected under the comprehensive multi-use Trinity Inlet Management Plan, agreed by the local and state government agencies (Cairns City Council, the Cairns Port Authority and the Queensland Government). Using this Australian example and one from the town of Palompon in Leyte province, central Philippines, we show how long-term mangrove habitat protection resulting from well-conceived coastal planning can deliver important economic and infrastructure benefits.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Despite widespread acknowledgment within planning scholarship that emotion – both present in knowledge and a form of knowledge – is integral to lived experience and the judgement of planners, it is often sidelined within planning practice. The extent to which mainstream planning has been able or willing to accommodate emotions remains constrained and the emotions of planners and the public remain an unacknowledged but pervasive presence. Antonio Ferreira recently highlighted in this journal the importance of attending to emotions at the level of the individual planner through the concept of mindfulness. We argue this approach must be complemented by an acknowledgement of the structural and institutional limitations of including emotions in planning practice. Drawing from the emotional geographies literature to describe a social-spatial conceptualisation of emotion, we highlight ontological and practical tensions associated with the achievement of the ‘emotional turn’ and advance a more purposeful engagement with emotion in mainstream planning practice.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

One of the distinctive features of Gold Coast urbanisation is its historically ad hoc approach to development with little or no strategic planning to guide it. Many have commented on the lack of planning on the Gold Coast calling it ‘an experiment in freedom’ or ‘free enterprise city’. Following a major restructuring of the Queensland’s local councils, the 1990s witnessed a shift from ad hoc decision making to more systematic planning on the Gold Coast. Understanding the past is important for shaping the future. This paper reviews the history of regulatory planning on the Gold Coast, encompassing decisions affecting the form and development of its earliest settlements through to its periods of greatest construction and most streamlined decision–making. It focuses mainly on past planning processes, the problems identified in each planning exercise and the interventions introduced, asking whether these were implemented or not and why. The paper positions the Gold Coast as a physical embodiment of this history of decision making, assessing the effects on the city as a whole of specific measures either affording freedoms or insisting on accountability to various levels of regulation. It examines how the absence of some planning measures influenced the form of the city and its internal arrangements and considers how the shift from ad hoc decision making towards more systematic planning efforts affected the city’s urbanisation. The lessons that the Gold Coast example provides will resonate with places elsewhere in Australia and the world, if not always in scale definitely in substance.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Bioversity International is reviewing its moratorium on the distribution of virus-infected Musa germplasm from the International Transit Centre (ITC), and the ProMusa Crop Protection Working Group has been invited to comment on policy changes. This paper was written to form a basis of discussion among the working group members during the ISHS/ProMusa symposium. It argues that the distribution of Musa germplasm should be guided by the International Plant Protection Convention, which states that it is the responsibility of the importing country, not the exporter, to impose the phytosanitary measures. There may be special circumstances where the release of badnavirus-infected germplasm from the ITC could be justified.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This project will examine infrastructure changes required to existing gestation stall accommodation including performance and economics.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The forest simulator is a computerized model for predicting forest growth and future development as well as effects of forest harvests and treatments. The forest planning system is a decision support tool, usually including a forest simulator and an optimisation model, for finding the optimal forest management actions. The information produced by forest simulators and forest planning systems is used for various analytical purposes and in support of decision making. However, the quality and reliability of this information can often be questioned. Natural variation in forest growth and estimation errors in forest inventory, among other things, cause uncertainty in predictions of forest growth and development. This uncertainty stemming from different sources has various undesirable effects. In many cases outcomes of decisions based on uncertain information are something else than desired. The objective of this thesis was to study various sources of uncertainty and their effects in forest simulators and forest planning systems. The study focused on three notable sources of uncertainty: errors in forest growth predictions, errors in forest inventory data, and stochastic fluctuation of timber assortment prices. Effects of uncertainty were studied using two types of forest growth models, individual tree-level models and stand-level models, and with various error simulation methods. New method for simulating more realistic forest inventory errors was introduced and tested. Also, three notable sources of uncertainty were combined and their joint effects on stand-level net present value estimates were simulated. According to the results, the various sources of uncertainty can have distinct effects in different forest growth simulators. The new forest inventory error simulation method proved to produce more realistic errors. The analysis on the joint effects of various sources of uncertainty provided interesting knowledge about uncertainty in forest simulators.