910 resultados para Traffic accidents.
Resumo:
The main goal of the research described in this report was to evaluate countermeasures that agencies can use to reduce speeds as drivers enter rural communities located on high-speed roadways. The objectives of this study were as follows: * Identify and summarize countermeasures used to manage speeds in transition zones * Demonstrate the effectiveness of countermeasures that are practical for high- to low-speed transition zones * Acquire additional information about countermeasures that may show promise but lack sufficient evidence of effectiveness * Develop an application toolbox to assist small communities in selecting appropriate transition zones and effective countermeasures for entrances to small rural communities The team solicited small communities that were interested in participating in the Phase II study and several communities were also recommended. The treatments evaluated were selected by carefully considering traffic-calming treatments that have been used effectively in other countries for small rural communities, as well as the information gained from the first phase of the project. The treatments evaluated are as follows: * Transverse speed bars * Colored entrance treatment * Temporary island * Radar-activated speed limit sign * Speed feedback sign The toolbox publication and four focused tech briefs also cover the results of this work.
Resumo:
Collection : Bibliothèque agricole
Resumo:
Researchers should continuously ask how to improve the models we rely on to make financial decisions in terms of the planning, design, construction, and maintenance of roadways. This project presents an alternative tool that will supplement local decision making but maintain a full appreciation of the complexity and sophistication of today’s regional model and local traffic impact study methodologies. This alternative method is tailored to the desires of local agencies, which requested a better, faster, and easier way to evaluate land uses and their impact on future traffic demands at the sub-area or project corridor levels. A particular emphasis was placed on scenario planning for currently undeveloped areas. The scenario planning tool was developed using actual land use and roadway information for the communities of Johnston and West Des Moines, Iowa. Both communities used the output from this process to make regular decisions regarding infrastructure investment, design, and land use planning. The City of Johnston case study included forecasting future traffic for the western portion of the city within a 2,600-acre area, which included 42 intersections. The City of West Des Moines case study included forecasting future traffic for the city’s western growth area covering over 30,000 acres and 331 intersections. Both studies included forecasting a.m. and p.m. peak-hour traffic volumes based upon a variety of different land use scenarios. The tool developed took goegraphic information system (GIS)-based parcel and roadway information, converted the data into a graphical spreadsheet tool, allowed the user to conduct trip generation, distribution, and assignment, and then to automatically convert the data into a Synchro roadway network which allows for capacity analysis and visualization. The operational delay outputs were converted back into a GIS thematic format for contrast and further scenario planning. This project has laid the groundwork for improving both planning and civil transportation decision making at the sub-regional, super-project level.
Resumo:
Skid resistance is a major concern of the safety engineer since wet pavement conditions are present for approximately 18% of the total accidents in Iowa according to studies by the Traffic and Safety Department. Many of these accidents may be influenced by the low skid resistant quality of the pavement. The size, shape, type, and arrangement of the concrete's particles interrelate with each other in a complex manner to give us frictional resistance. The purpose of this investigation was to determine which method of texturing provides the best skid resistance properties on portland cement concrete pavement.
Resumo:
Left-turning traffic is a major source of conflicts at intersections. Though an average of only 10% to 15% of all approach traffic turns left, these vehicles are involved in approximately 45% of all accidents. This report presents the results of research conducted to develop models which estimate approach accident rates at high speed signalized intersections. The objective of the research was to quantify the relationship between traffic and intersection characteristics, and accident potential of different left turn treatments. Geometric, turning movement counts, and traffic signal phasing data were collected at 100 intersections in Iowa using a questionnaire sent to municipalities. Not all questionnaires resulted in complete data and ultimately complete data were derived for 63 intersections providing a database of 248 approaches. Accident data for the same approaches were obtained from the Iowa Department of Transportation Accident Location and Analysis System (ALAS). Regression models were developed for two different dependent variables: 1) the ratio of the number of left turn accidents per approach to million left turning vehicles per approach, and 2) the ratio of accidents per approach to million traffic movements per approach. A number of regression models were developed for both dependent variables. One model using each dependent variable was developed for intersections with low, medium, and high left turning traffic volumes. As expected, the research indicates that protected left turn phasing has a lower accident potential than protected/permitted or permitted phasing. Left turn lanes and multiple lane approaches are beneficial for reducing accident rates, while raised medians increase the likelihood of accidents. Signals that are part of a signal system tend to have lower accident rates than isolated signals. The resulting regression models may be used to determine the likely impact of various left turn treatments on intersection accident rates. When designing an intersection approach, a traffic engineer may use the models to estimate the accident rate reduction as a result of improved lane configurations and left turn treatments. The safety benefits may then be compared to any costs associated with operational effects to the intersection (i.e., increased delay) to determine the benefits and costs of making intersection safety improvements.
Resumo:
There are approximately 800 installations of destination lighting at secondary road intersections in Iowa. Approximately 90% of these have only a single luminaire. The other installations have two luminaires. No warrants currently exist for justifying the use of this type of lighting. Previous research has examined the safety benefits from full lighting of rural intersections that generally serve substantially higher traffic volumes than secondary road intersections in Iowa. However, the safety benefit of destination lighting at intersections carrying relatively low volumes has not been the subject of previous research. The research reported here, sponsored by the Iowa Department of Transportation, was undertaken to identify locations where destination lighting could be expected to improve highway safety. If destination lighting were shown to reduce accident frequency, warrants for its use on secondary roads could be developed. An inventory of secondary road lighting installations in Iowa was assembled. From this inventory, two samples were constituted that would permit two separate comparisons of the accident experience with and without destination lighting. Before and after comparisons were made for the same locations if accident records were available for at least one full year both preceding and following the installation of destination lighting. Accident records for this purpose were available from a statewide computerized record system covering the period from 1977 through 1982. The accident experience at locations having destination lighting installed before 1978 was compared with a sample of comparable locations not having destination lighting. The sample of secondary road intersections used for the before and after comparison included 91 locations. The sample of continuously lighted locations included 102 intersections. Accident experience at these locations was compared with the experience at 102 intersections that were not lighted. The intersections included in these samples averaged only 0.31 accidents per year. The accident rate at secondary road intersections that had destination lighting did not differ significantly from the accident rate at intersections that were not lighted. This conclusion was derived from both comparisons, the before and after experience and the comparison of experience at intersections that were continuously lighted with that at unlighted locations. Furthermore, no significant differences were noted between lighted and unlighted locations in the proportion of accidents that occurred at night. The distribution of accidents by type also did not differ between unlighted intersections and those having destination lighting. It was not possible to formulate warrants for destination lighting since analyses directed toward identifying specific characteristics of an intersection that could be correlated with highway safety did not yield any useful relationships. However, it was noted that the average damages for night accidents that occurred at lighted intersections were lower than for accidents at unlighted intersections. Even in the absence of a more definitive demonstration of beneficial effects, destination lighting is perceived by officials in most of the counties having such installations as yielding desirable effects and is recognized as helpful to motorists in performing the guidance function in driving. Given this benefit and a relatively low cost (an average of $74 per year for one luminaire), and given that the subjective criteria that have been used in the past to justify the installation of destination lighting have led to a high degree of public acceptance and satisfaction, it is recommended that the same subjective criteria continue to be used in lieu of definitive warrants.
Resumo:
Excessive speed on State and County highways is recognized as a serious problem by many Iowans. Speed increases both the risk and severity of accidents. Studies conducted by the FHWA and NHTSA have concluded that if average speeds were increased by five MPH, fatalities would increase by at least 2,200 annually. Along with the safety problems associated with excessive speed are important energy considerations. When the national speed limit was lowered to 55 MPH in 1974, a tremendous savings in fuel was realized. The estimated actual savings for automobiles amounted to 2.2 billion gallons, an average of 20.75 gallons for each of the 106 million automobiles registered in 1975. These benefits prompted the Federal-Aid Amendment of 1974 requiring annual State enforcement certification as a prerequisite for approval of Federal-aid highway projects. In 1978, the United States D.O.T. recommended to Congress significant changes in speed limit legislation designed to increase compliance with the national speed limit. The Highway Safety Act of 1978 provides for both withholding Federal-aid highway funds and awarding incentive grants based on speed compliance data submitted annually. The objective of this study was to develop and make operational, an automatic speed monitoring system which would have flexible capabilities of collecting accurate speed data on all road systems in Iowa. It was concluded that the Automatic Speed Monitoring Program in Iowa has been successful and needed data is being collected in the most economical manner possible.
Resumo:
Currently, many drivers experience some difficulty in viewing the road ahead of them during times of reduced visibility, such as rain, snow, fog, or the darkness of night- Recent studies done by the National Safety Council provide a detailed contrast between fatal accidents occurring during the day and night. Revealed was that the motor vehicle night death rate (4.41 deaths per 100 million miles driven) was sharply higher than the corresponding death rate during daylight hours (1.21). By providing a delineating system powered by the natural resource of solar power, a constant source of visibility may be maintained throughout the evening. Along with providing enough light to trace the outline of the road, other major goals defined in producing this delineator system are as follows: 1. A strong and durable design that would protect the internal components and survive extreme weather conditions. 2. A low maintenance system where components need few repairs or replacements. 3. A design which makes all components accessible in the event that maintenance is needed, but also prevents vandalism. 4. A design that provides greater visibility to drivers and will not harm a vehicle or its passengers in the event of a collision. This solar powered highway delineator consists of an adjustable solar array, a light fixture, and a standard delineator pole. The solar array houses and protects the solar panels, and can be easily adjusted to obtain a maximum amount of sunlight. The light fixture primarily houses the battery, the circuit and the light assembly. Both components allow for easy accessibility and reduce vandalism using internal connections for bolts and wires. The delineator mounting pole is designed to extensively deform in the event of a collision, therefore reducing any harm caused to the vehicle and/or the passengers. The cost of a single prototype to be produced is approximately $70.00 excluding labor costs. However, these material and labor costs will be greatly reduced if a large number of delineators are produced. It is recommended that the Iowa Department of Transportation take full advantage of the research and development put into this delineator design. The principles used in creating this delineator can be used to provide an outline for drivers to follow, or on a larger scale, provide actual roadway lighting in areas where it was never before possible or economically feasible. In either event, the number of fatal accidents will be decreased due to the improved driver visibility in the evening.
Resumo:
Several accidents, some involving fatalities, have occurred on U.S. Highway 30 near the Archer Daniels Midland Company (ADM) Corn Sweeteners plant in Cedar Rapids, Iowa. A contributing factor to many of these accidents has been the large amounts of water (vapor and liquid) emitted from multiple sources at ADM's facility located along the south side of the highway. Weather and road closure data acquired from IDOT have been used to develop a database of meteorological conditions preceding and accompanying closure of Highway 30 in Cedar Rapids. An expert system and a FORTRAN program were developed as aids in decision making with regard to closure of Highway 30 near the plant. The computer programs were used for testing, evaluation, and final deployment. Reports indicate the decision tools have been successfully implemented and were judged to be helpful in forecasting road closures and in reducing costs and personnel time in monitoring the roadway.
Resumo:
"Metric Training For The Highway Industry", HR-376 was designed to produce training materials for the various divisions of the Iowa DOT, local government and the highway construction industry. The project materials were to be used to introduce the highway industry in Iowa to metric measurements in their daily activities. Five modules were developed and used in training over 1,000 DOT, county, city, consultant and contractor staff in the use of metric measurements. The training modules developed deal with the planning through operation areas of highway transportation. The materials and selection of modules were developed with the aid of an advisory personnel from the highway industry. Each module is design as a four hour block of instruction and a stand along module for specific types of personnel. Each module is subdivided into four chapters with chapter one and four covering general topics common to all subjects. Chapters two and three are aimed at hands on experience for a specific group and subject. This module includes: Module 4 - Transportation Planning and Traffic Monitoring. Hands on examples of applications of metric measurements in the development of planning reports and traffic data collection are included in this module.
Resumo:
During 1986, the City of Des Moines placed an experimental asphaltic concrete overlay containing an ice-retardant additive (Verglimit) on Euclid Avenue (U.S. Highway 6). Verglimit is a chemical multi-component deicer which is added to the surface course of an asphalt overlay. The additive was uniformly distributed through the mix at the asphalt plant, which allows exposure of the particles as the finished surface wears under traffic. During a snowfall, the exposed particles attract and absorb moisture creating a deicing solution which dampens the pavement. The Verglimit additive used on this project cost $1,180 per metric ton. The Verglimit was added at a rate of 6.3% by weight, which was 126 pounds per ton, or $66.38 per ton of hot mix asphalt. The purchase of Verglimit additive was funded by the Iowa Department of Transportation through a research project recommended by the Highway Research Advisory Board. The pavement surface experienced severe wetting due to the additive's affinity for water immediately after the project was completed and during periods of high humidity. This wetting created slippery conditions both on the project itself and where vehicles tracked the additive. The only way to remove the slipperiness was by flushing the street with water. The ice-retardant overlay appears to perform as expected in reducing the adherence of ice and snow, especially at temperatures just below freezing. It performs better in light snowfalls than in heavy ones. The ice retardant overlay is effective in eliminating thin coatings of ice due to freezing drizzle or widespread frost. The accident data showed a reduction in the number of snow and ice related accidents but due to the low number of this type of accident the results are inconclusive.
Resumo:
In 1986, the Iowa DOT installed 700 feet of International Barrier Corporation (IBC) barrier between the 1-235 eastbound off ramp and the adjacent eastbound loop on ramp at 8th Street in West Des Moines. It is a 3 foot 6 inch high sand-filled galvanized sheet metal barrier. The bid price on this project was $130 per lineal foot. It was evaluated annually for four years. During this time, there have been no severe accidents where vehicles hit the barrier. There are scrapes and dents indicating minor accidents. The barrier has performed very well and required no maintenance. Due to its initial cost, the IBC barrier is not as cost-effective as portland cement concrete barrier rails.
Resumo:
This report presents the results of a number of detailed Iowa access management case studies. Case studies were selected to provide a cross-section of locations and community sizes in Iowa as well as a variety of project types. Generally, access management projects completed during the mid-1990s were chosen as case studies. Projects ranging from driveway consolidation to full raised medians were analyzed on a before and after basis in terms of traffic safety, traffic operations, and adjacent business vitality. Sources of information used for the case study analysis included: road project files; traffic accident records; state sales tax records; and personal interviews of business owners, business customers, and local officials. The case study results from Iowa essentially confirm results of previous access management research from around the nation. Recent access in Iowa had significant, positive impacts in terms of traffic safety. The average reduction of annual accidents and accident rates on improved roadways was approximately 40%. Improvements in access management also led to significantly better roadway operations for most case studies. Although a small number of individual businesses do report sales losses and/or customer complaints once projects have been completed, access management projects in Iowa have not had an adverse impact on the majority of businesses located along them. In fact, some access management projects in Iowa seem to have contributed to an improved business environment along the corridors that have been improved. The results from the Iowa case studies presented in this report will be used to develop access management education materials for Iowa transportation professionals and other audiences interested in the impacts of access management.