917 resultados para Three Gorges Project


Relevância:

20.00% 20.00%

Publicador:

Resumo:

Recent developments in networked three dimensional (3D) virtual worlds and the proliferation of high bandwidth communications technology have the potential to dramatically improve collaboration in the construction industry. This research project focuses on the early stages of a design/construction project in which models for a project are developed and revised. We have investigated three aspects of collaboration in virtual environments: 1. The processes that enable effective collaboration using high bandwidth information communication technology (ICT); 2. The models that allow for multiple disciplines to share their views in a synchronous virtual environment; 3. The generic skills used by individuals and teams when engaging with high bandwidth information communication technology.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Practice placement education has been recognised as an integral and critical component of the training of occupational therapy students. Although there is an extensive body of literature on clinical education and traditional practice placement education models, there has been limited research on alternative placements.-------- This paper reviews the literature on various practice placement education models and presents a contemporary view on how it is currently delivered. The literature is examined with a particular focus on the increasing range of practice placement education opportunities, such as project and role-emerging placements. The drivers for non-traditional practice placement education include shortages of traditional placement options, health reform and changing work practices, potential for role development and influence on practice choice. The benefits and challenges of non-traditional practice placement education are discussed, including supervision issues, student evaluation, professional and personal development and the opportunity to practise clinical skills.--------- Further research is recommended to investigate occupational therapy graduates' perceptions of role-emerging and project placements in order to identify the benefits or otherwise of these placements and to contribute to the limited body of knowledge of emerging education opportunities.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This paper describes the process adopted in developing an integrated decision support framework for planning of office building refurbishment projects, with specific emphasize on optimising rentable floor space, structural strengthening, residual life and sustainability. Expert opinion on the issues to be considered in a tool is being captured through the DELPHI process, which is currently ongoing. The methodology for development of the integrated tool will be validated through decisions taken during a case study project: refurbishment of CH1 building of Melbourne City Council, which will be followed through to completion by the research team. Current status of the CH1 planning will be presented in the context of the research project.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

With an increase in growing number of aging public building infrastructure globally, there is an opportunity for an efficient life care management rather then mere demolition and rebuild. By carefully implementing appropriate structural engineering practices with facility management, the whole of life cycle costs for public building assets can be optimised and public money can be saved and better utilised elsewhere. A need of decision support tool/methodology which can assist asset manager make better decision among demolish, refurbish, do nothing or rebuilt option for any typical building under consideration is growing in order to optimise maintenance funds. The paper is part of research project focusing on development of such methodology known as residual service life prediction. The paper is mainly focusing on following three major aspects of public building infrastructure; first, issues and challenges in optimisation of maintenance funds, second, residual service life prediction methodology and issues and challenges in the development of such methodology. The paper concludes with the authors’ observations and further research potentials

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The 2007 Australian Federal election not only saw the election of a Labor government after 11 years of John Howard’s conservative Coalition government. It also saw new levels of political engagement through the Internet, including the rise of citizen journalism as an alternative outlet and mode of reporting on the election. This paper reports on the You Decide 2007 project, an initiative undertaken by a QUT-based research team to facilitate online news reporting on the election on a ‘hyper-local’, electorate-based model. We evaluate the You Decide initiative on the basis of: promoting greater citizen participation in Australian politics; new ways of engaging citizens and key stakeholders in policy deliberation; establishing new links between mainstream media and independent online media; and broadening the base of political participation to include a wider range of citizen and groups.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

In today’s global design world, architectural and other related design firms design across time zones and geographically distant locations. High bandwidth virtual environments have the potential to make a major impact on these global design teams. However, there is insufficient evidence about the way designers collaborate in their normal working environments using traditional and/or digital media. This paper presents a method to study the impact of communication and information technologies on collaborative design practice by comparing design tasks done in a normal working environment with design tasks done in a virtual environment. Before introducing high bandwidth collaboration technology to the work environment, a baseline study is conducted to observe and analyze the existing collaborative process. Designers currently rely on phone, fax, email, and image files for communication and collaboration. Describing the current context is important for comparison with the following phases. We developed the coding scheme that will be used in analyzing three stages of the collaborative design activity. The results will establish the basis for measures of collaborative design activity when a new technology is introduced later to the same work environment – for example, designers using electronic whiteboards, 3D virtual worlds, webcams, and internet phone. The results of this work will form the basis of guidelines for the introduction of technology into global design offices

Relevância:

20.00% 20.00%

Publicador:

Resumo:

In many cases, construction projects do not achieve the objectives that the project participants set for them. If participants could better understand how their project is performing overall, at various stages of its delivery, then the opportunities to achieve project success would almost certainly be greater. This paper documents a method of assessing the status of a project, at a point in its design or construction phase, or after completion. The status is assessed in terms of up to seven (7) key success factors. Any evidence of less than adequate performance in these performance areas is scrutinised to seek out the root causes of why this situation is happening. Using these identified root causes of under performance, general suggestions can then be made as to how to return the project to good health. A software package that assists in assessing the status of the project has been developed. The package is currently being calibrated before commercial release.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Project Diagnostics is a tool for construction industry stakeholders wishing to improve project delivery and outcomes. This software identifies areas of poor project health, then establishes probable root causes and provides suggested remedial measures. Its focus is to act as an advanced warning system for construction projects that are failing to meet predetermined objectives based on the critical success factors (CSFs) of cost, time, quality, safety, relationships, environment and stakeholder value.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

For a sustainable building industry, not only should the environmental and economic indicators be evaluated but also the societal indicators for building. Current indicators can be in conflict with each other, thus decision making is difficult to clearly quantify and assess sustainability. For the sustainable building, the objectives of decreasing both adverse environmental impact and cost are in conflict. In addition, even though both objectives may be satisfied, building management systems may present other problems such as convenience of occupants, flexibility of building, or technical maintenance, which are difficult to quantify as exact assessment data. These conflicting problems confronting building managers or planners render building management more difficult. This paper presents a methodology to evaluate a sustainable building considering socio-economic and environmental characteristics of buildings, and is intended to assist the decision making for building planners or practitioners. The suggested methodology employs three main concepts: linguistic variables, fuzzy numbers, and an analytic hierarchy process. The linguistic variables are used to represent the degree of appropriateness of qualitative indicators, which are vague or uncertain. These linguistic variables are then translated into fuzzy numbers to reflect their uncertainties and aggregated into the final fuzzy decision value using a hierarchical structure. Through a case study, the suggested methodology is applied to the evaluation of a building. The result demonstrates that the suggested approach can be a useful tool for evaluating a building for sustainability.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Construction projects are faced with a challenge that must not be underestimated. These projects are increasingly becoming highly competitive, more complex, and difficult to manage. They become ‘wicked problems’, which are difficult to solve using traditional approaches. Soft Systems Methodology (SSM) is a systems approach that is used for analysis and problem solving in such complex and messy situations. SSM uses “systems thinking” in a cycle of action research, learning and reflection to help understand the various perceptions that exist in the minds of the different people involved in the situation. This paper examines the benefits of applying SSM to wicked problems in construction project management, especially those situations that are challenging to understand and difficult to act upon. It includes relevant examples of its use in dealing with the confusing situations that incorporate human, organizational and technical aspects.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Maintaining the health of a construction project can help to achieve the desired outcomes of the project. An analogy is drawn to the medical process of a human health check where it is possible to broadly diagnose health in terms of a number of key areas such as blood pressure or cholesterol level. Similarly it appears possible to diagnose the current health of a construction project in terms of a number of Critical Success Factors (CSFs) and key performance indicators (KPIs). The medical analogy continues into the detailed investigation phase where a number of contributing factors are evaluated to identify possible causes of ill health and through the identification of potential remedies to return the project to the desired level of health. This paper presents the development of a model that diagnoses the immediate health of a construction project, investigates the factors which appear to be causing the ill health and proposes a remedy to return the project to good health. The proposed model uses the well-established continuous improvement management model (Deming, 1986) to adapt the process of human physical health checking to construction project health.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

In moving from lowest cost adversarial based traditional procurement towards value driven methodologies the challenges range from re-engineering the process, to metrics and team alignment. This paper describes research into methodologies which encourage alignment of project partners towards achieving mutually beneficial goals. The research identifies nine variables which influence the achievement of successful projects delivering value. Results from case studies illustrate that not all parties can achieve value for themselves which directs attention to the balance between deliverables and the interests of team members. Re- valuing construction demands refocusing towards the delivery of operational assets and their place in the value system whilst recognising the need to manage the delivery process and the team to align the value to the parties. The objective of the project was to develop tools and recommendations for reform of project delivery in the building and construction industry to transform business-as-usual performance into exceptional performance. Benefits flow not only to the construction industry, but to the community as a whole because a more sophisticated industry can deliver more effective use of assets, financing, operating and maintenance of facilities to suit the community’s needs. This research was funded by the Australian Cooperative Research Centre for Construction Innovation.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

A study into best practice project delivery and the development of a suite of products, resources and services to help guide clients and project teams towards the best approach for specific projects.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Research Background - Young people with negative experiences of mainstream education often display low levels of traditional academic achievement. These young people tend to display considerable cultural and social resources developed through their repeated experiences of adversity. Education research has a duty to provide these young people with opportunities to showcase, assess and translate their social and cultural resources into symbolic forms of capital. This creative work addresses the research question, how can educators maximise the social and cultural capital they help young people acquire through live music performances and studio recordings? Research Contribution - This live music performance, built on existing artistic reputations of the artists, saw the lads support one of their local heroes from Brisbane Hip Hop music scene. In doing so they showcased what their three years of concerted musical engagement can achieve within supportive flexible learning environments. The new knowledge derived from this research focuses on the academic and self confidence benefits for disengaged young people using festival performances as authentic learning activities. Research Significance - This research is significant because it aims to maximise the number of tangible outcomes related to a school-based arts project. The young participants gained technical, artistic, social and commercial status during this project. Individual performances were distributed and downloaded via creative commons licences at the Australian Creative Resource Archive. This performance also contributed to their certified qualifications and acted as pilot research data for two competitively funded ARC grants (DP0209421 & LP0883643)