719 resultados para Sector plan
Resumo:
Against a background of already thin markets in some sectors of major public sector infrastructure in Australia and the desire of Australian federal government to leverage private finance, concerns about ensuring sufficient levels of competition are prompting federal government to seek new sources of in-bound Foreign Direct Income. The aim of this paper is to justify and develop a means to deploying the eclectic paradigm of internationalisation that forms part of an Australian federally funded research project designed to explain the determinants of multinational contractors' willingness to bid for Australian public sector major infrastructure projects. Despite the dominance of the eclectic paradigm as a theory of internationalisation for over two decades, it has seen limited application in terms of multinational construction. It is expected that the research project will be the first empirical study to deploy the eclectic paradigm to inbound FDI to Australia whilst using the dominant economic theories advocated for use within the eclectic paradigm. Furthermore, the research project is anticipated to yield a number of practical benefits. These include estimates of the potential scope to attract more multinational contractors to bid for Australian public sector infrastructure, including the nature and extent to which this scope can be influenced by Australian governments responsible for the delivery of infrastructure. On the other hand, the research is also expected to indicate the extent to which indigenous and other multinational contractors domiciled in Australia are investing in special purpose technology and achieving productivity gains relative to foreign multinational contractors.
Resumo:
With rising environmental alarm, the reduction of critical aircraft emissions including carbon dioxides (CO2) and nitrogen oxides (NOx) is one of most important aeronautical problems. There can be many possible attempts to solve such problem by designing new wing/aircraft shape, new efficient engine, etc. The paper rather provides a set of acceptable flight plans as a first step besides replacing current aircrafts. The paper investigates a green aircraft design optimisation in terms of aircraft range, mission fuel weight (CO2) and NOx using advanced Evolutionary Algorithms coupled to flight optimisation system software. Two multi-objective design optimisations are conducted to find the best set of flight plans for current aircrafts considering discretised altitude and Mach numbers without designing aircraft shape and engine types. The objectives of first optimisation are to maximise range of aircraft while minimising NOx with constant mission fuel weight. The second optimisation considers minimisation of mission fuel weight and NOx with fixed aircraft range. Numerical results show that the method is able to capture a set of useful trade-offs that reduce NOx and CO2 (minimum mission fuel weight).
Resumo:
The significant challenge faced by government in demonstrating value for money in the delivery of major infrastructure resolves around estimating costs and benefits of alternative modes of procurement. Faced with this challenge, one approach is to focus on a dominant performance outcome visible on the opening day of the asset, as the means to select the procurement approach. In this case, value for money becomes a largely nominal concept and determined by selected procurement mode delivering, or not delivering, the selected performance outcome, and notwithstanding possible under delivery on other desirable performance outcomes, as well as possibly incurring excessive transaction costs. This paper proposes a mind-set change in this particular practice, to an approach in which the analysis commences with the conditions pertaining to the project and proceeds to deploy transaction cost and production cost theory to indicate a procurement approach that can claim superior value for money relative to other competing procurement modes. This approach to delivering value for money in relative terms is developed in a first-order procurement decision making model outlined in this paper. The model developed could be complementary to the Public Sector Comparator (PSC) in terms of cross validation and the model more readily lends itself to public dissemination. As a possible alternative to the PSC, the model could save time and money in preparation of project details to lesser extent than that required in the reference project and may send a stronger signal to the market that may encourage more innovation and competition.
Resumo:
Project Procurement is a ‘great’ environment for ethical issues with its low-price state of mind and competition. It has many opportunities that could contribute to illegal activities or unethical behavior especially in the construction industry. In 2006 alone, 17.3% of 417 Malaysian government contract projects were considered sick due to the poor performance by the contractors. Therefore it is important to govern the project procurement, especially the plan procurement stage to ensure the accountability and transparency of the decision made in awarding the right contract to the best contractor. This is where project governance framework (PGF) is really needed in project procurement planning. Project governance is a subset of corporate governance focusing on the areas of corporate governance related to project activities, including: portfolio direction, project sponsorship, project and program management and efficiency and disclosure and reporting. This paper highlights the importance of implementing project governance framework (PGF) to ensure that the decision makers are answerable and accountable to the stakeholders, and the decision making is transparent to avoid any ethical issues arises. A comprehensive preliminary literature is carried out to discover the importance of executing PGF in project procurement in Malaysian public sector. By understanding the important of PGF, it is hoped that this will bring a signal to other developing countries to implement the similar method in ensuring the transparency of the decision making in project procurement planning in their countries.
Resumo:
There is a lack of research which identifies the role of the public-sector client in relation to ethical practice in plan procurement. This paper discusses a conceptual framework for ethical decision making in project procurement, focusing on public sector clients within the Malaysian construction industry. A framework is proposed to ensure that effective ethical decision making strategies are deployed to ensure that plan procurement is carried out with a transparent process so that the public sector clients are able to adopt. The conceptual framework adopts various factors that contribute to ethical decision making at the early stage of procurement and consists of the procurement system, individual factors, project characteristics, and organizational culture as the internal factors and professional code of conduct and government policies as the external factors. This framework rationalizes the relationships between systems, psychology and organizational theory to form an innovative understanding of making ethical decisions in plan procurement. It is expected that this proposed framework will be useful as a foundation for identifying the factors that contribute to ethical decision making focusing on the planning stage of procurement process.
Resumo:
Australia’s Arts and Entertainment Sector underpins cultural and social innovation, improves the quality of community life, is essential to maintaining our cities as world class attractors of talent and investment, and helps create ‘Brand Australia’ in the global marketplace of ideas (QUT Creative Industries Faculty 2010). The sector makes a significant contribution to the Australian economy. So what is the size and nature of this contribution? The Creative Industries Faculty at Queensland University of Technology recently conducted an exercise to source and present statistics in order to produce a data picture of Australia’s Arts and Entertainment Sector. The exercise involved gathering the latest statistics on broadcasting, new media, performing arts, and music composition, distribution and publishing as well as Australia’s performance in world markets.
Resumo:
Despite the continued popularity of travel blogs and virtual travel communities, there is currently a lack of contemporary criticism surrounding the coded structures and connotations of online travel writings, especially those arising out of the Australian context. While there have been few significant studies of Australian women’s travel to date, there have been even less about female wandering. Reimagining the archetype of Penelope, this paper considers liminal accounts of wandering in contemporary travel blogs of Australian women abroad. When women travel as wanderers, they undermine normative accounts of travel and trace out alternative movements fused with gendered meaning.
Resumo:
International practice-led design research in landscape architecture has identified wetland sites as highly significant and potentially fragile environments in many countries. China has considerable wetland acreage that has been drained and transformed into farmland to address local poverty of farmers. An important gap in knowledge exists as to how to design Chinese public open spaces to reduce water contamination, flood severity and loss of farmland for local villagers as urban development expands. This project responded to the opportunity of introducing a new type of wetland design to Stage 3 of the Bailang River Redevelopment, Weifang City, Shandong Province. The work proposed a range of wetland design innovations for Chinese wetland environments to encourage on-site solutions to contamination and flooding problems.
Resumo:
Statistics indicate that the percentage of fatal industrial accidents arising from repair, maintenance, minor alteration and addition (RMAA) works in Hong Kong was disturbingly high and was over 56% in 2006. This paper provides an initial report of a research project funded by the Research Grants Council (RGC) of the HKSAR to address this safety issue. The aim of this study is to scrutinize the causal relationship between safety climate and safety performance in the RMAA sector. It aims to evaluate the safety climate in the RMAA sector; examine its impacts on safety performance, and recommend measures to improve safety performance in the RMAA sector. This paper firstly reports on the statistics of construction accidents arising from RMAA works. Qualitative and quantitative research methods applied in conducting the research are dis-cussed. The study will critically review these related problems and provide recommendations for improving safety performance in the RMAA sector.
Resumo:
This work reviews the rationale and processes for raising revenue and allocating funds to perform information intensive activities that are pertinent to the work of democratic government. ‘Government of the people, by the people, for the people’ expresses an idea that democratic government has no higher authority than the people who agree to be bound by its rules. Democracy depends on continually learning how to develop understandings and agreements that can sustain voting majorities on which democratic law making and collective action depends. The objective expressed in constitutional terms is to deliver ‘peace, order and good government’. Meeting this objective requires a collective intellectual authority that can understand what is possible; and a collective moral authority to understand what ought to happen in practice. Facts of life determine that a society needs to retain its collective competence despite a continual turnover of its membership as people die but life goes on. Retaining this ‘collective competence’ in matters of self-government depends on each new generation: • acquiring a collective knowledge of how to produce goods and services needed to sustain a society and its capacity for self-government; • Learning how to defend society diplomatically and militarily in relation to external forces to prevent overthrow of its self-governing capacity; and • Learning how to defend society against divisive internal forces to preserve the authority of representative legislatures, allow peaceful dispute resolution and maintain social cohesion.
Resumo:
Triggered by the continuing global financial crisis, most public administration systems internationally are reviewing their ability to meet public expectations in more challenging strategic environments, while satisfying the pressure from their political masters to drive down the costs of public administration. Consequently public sector organizations are under constant pressure to reform to meet not only the global economic challenges, but the need for more responsive government (Brown et al 2003). Doyle et al (2000) propose that organizational change is seldom well managed, but that the public sector faces greater difficulty in implementing corporate change than the private sector because of its unique environment, e.g. the need to deliver bureaucratically impartial outcomes. The scale of the changes required, and the constraints imposed by the context within which these changes need to occur, have intensified the need for capable public sector leadership and management. The types of capability required now extend beyond those typically required in public organizations through the efficiency drive of new public management. Acquiring these capabilities remains a key issue for public organizations. One challenge for public management, then, is leadership and management quality, including the need to recruit externally to refresh, re-energize and change the sector and its individual organizations as well as develop advanced skills among existing senior executives.
Resumo:
Building construction is a highly competitive and risky business. This competitiveness is compounded where conflicting objectives amongst contracting and subcontracting firms set the stage for an adversarial and potentially destructive business relationship. Clients, especially those from the public sector, need broader tender evaluation criteria to complement the traditional focus on bid price. There is also a need for change in the construction industry—not only to a more cooperative approach between the constructing parties—but also from a confrontationist attitude to a more harmonious relationship between all stakeholders in providing constructed facilities. A strategic alliance is a cooperative relationship between two or more organisations that forms part of their overall strategies, and contributes to achieving their major goals and objectives. Strategic alliances in building construction may provide a useful tool to assist public sector construction managers evaluate tenders and concurrently encourage more cooperative relationships amongst construction stakeholders. This paper begins with an overview of the Australian building construction industry, then reviews the existing strategic alliance literature and describes an analysis framework comprising six attributes of strategic alliances for application to construction organisations—trust, commitment, interdependence, cooperation, communication, and joint problem solving. These attributes are currently being used to collect data from 70 building construction firms in Queensland to assess their respective levels of strategic alliance. Given the trend towards broader indicators of construction firm performance, these attributes are proposed as a tool for use in the tender evaluation process for public works.