919 resultados para OPM3 (Organizational Project Management Model Maturity)
Resumo:
For executing the activities of a project, one or several resources are required, which are in general scarce. Many resource-allocation methods assume that the usage of these resources by an activity is constant during execution; in practice, however, the project manager may vary resource usage by individual activities over time within prescribed bounds. This variation gives rise to the project scheduling problem which consists in allocating the scarce resources to the project activities over time such that the project duration is minimized, the total number of resource units allocated equals the prescribed work content of each activity, and precedence and various work-content-related constraints are met.
Resumo:
This study evaluated a modified home-based model of family preservation services, the long-term community case management model, as operationalized by a private child welfare agency that serves as the last resort for hard-to-serve families with children at severe risk of out-of-home placement. The evaluation used a One-Group Pretest-Posttest design with a modified time-series design to determine if the intervention would produce a change over time in the composite score of each family's Child Well-Being Scales (CWBS). A comparison of the mean CWBS scores of the 208 families and subsets of these families at the pretest and various posttests showed a statistically significant decrease in the CWBS scores, indicating decreased risk factors. The longer the duration of services, the greater the statistically significant risk reduction. The results support the conclusion that the families who participate in empowerment-oriented community case management, with the option to extend service duration to resolve or ameliorate chronic family problems, have experienced effective strengthening in family functioning.
Resumo:
Although still in an early stage, offshore wind development is now characterized by a boom process. This leads to the necessity of applying an integral management model for the design of offshore wind facilities, being the purpose of the model to achieve technical, economical and environmental viability, all within a sustainable development framework. The foregoing led to the research project exposed in this paper, consisting of drawing up an offshore wind farms methodological proposal; this methodology has a global and/or general nature or point of view whilst searching for optimization of the overall process of operations leading to the design of this type of installations and establishing collated theoretical bases for the further development of management tools. This methodological proposal follows a classical engineering thought scheme: it begins with the alternatives study, and ends with the detailed design. With this in mind, the paper includes the following sections: introduction, methodology used for the research project, conditioning factors, methodological proposal for the design of offshore wind farms, checking the methodological proposal, and conclusions
Resumo:
Offshore wind farms are beginning to form part of coastal and marine landscapes located in dynamic surroundings. An integral management model must therefore be applied to achieve not only technical and economic viability of the project but also respect for the environment. Amongst other aspects, the latter calls for an analysis of the possible impact these facilities may have on littoral processes and this requires the differences between littoral processes prior and subsequent to the facility’s construction to be known. The maritime climate, the composition of the coast, lay-out distribution and characteristics of the facility’s components need to be known, particularly foundations as they are the main obstacles waves and currents meet. This article first addresses different aspects related to an offshore wind farm’s influence on the analysis of how it affects littoral dynamics and, because of their importance in this study, pays special attention to foundations. Coastal erosion due to this type of facility is then examined. The main conclusion of this article is that, whilst there are certain opinions claiming the coast is not affected by the presence of this kind of facility since the distance from location to coast and between wind turbine generators themselves is long, the impact must be analysed in each specific case, at least until experience proves otherwise and criteria are adopted in this respect.
Resumo:
Experiences relating to the InternationalMasters in Rural Development from the Technical University of Madrid (Universidad Politécnica de Madrid, UPM), the first Spanish programme to receive a mention as a Registered Education Programme by InternationalProject Management Association (IPMA) are considered. Backed by an educational strategy based on Project-Based Learning dating back twenty years, this programme has managed to adapt to the competence evaluation requirements proposed by the European Space for Higher Education (ESHE). In order to do this the training is linked to the professional qualification using competences as a reference leading to the qualification in project management as established by the IPMA.
Resumo:
In this work, a comparison between the competences codes in the CDIÓs* curriculum, the ones defined for the Tunning Project and the International Project Management Association (IPMA) is made. The goal is to define the most appropriate competences codes for the engineering education in Latin America. The CDIO code is obtained from the engineering practice, and responds to the Accreditation Board for Engineering and Technology (ABET) standards of accreditation. The Tuning competences are the ones defined for Latin America and the IPMÁs are international competences for project management. It is the first time that the competences defined in ABET accreditation standards in the engineering field are compared with the international competences according to IPMÁs model. The results give evidence that, in first place, there is a need to apply holistic models in the definition of an engineering curriculum. Second, the pertinence of these models in the definition of engineering programs in Latin America.
Resumo:
A high productivity rate in Engineering is related to an efficient management of the flow of the large quantities of information and associated decision making activities that are consubstantial to the Engineering processes both in design and production contexts. Dealing with such problems from an integrated point of view and mimicking real scenarios is not given much attention in Engineering degrees. In the context of Engineering Education, there are a number of courses designed for developing specific competencies, as required by the academic curricula, but not that many in which integration competencies are the main target. In this paper, a course devoted to that aim is discussed. The course is taught in a Marine Engineering degree but the philosophy could be used in any Engineering field. All the lessons are given in a computer room in which every student can use each all the treated software applications. The first part of the course is dedicated to Project Management: the students acquire skills in defining, using Ms-PROJECT, the work breakdown structure (WBS), and the organization breakdown structure (OBS) in Engineering projects, through a series of examples of increasing complexity, ending up with the case of vessel construction. The second part of the course is dedicated to the use of a database manager, Ms-ACCESS, for managing production related information. A series of increasing complexity examples is treated ending up with the management of the pipe database of a real vessel. This database consists of a few thousand of pipes, for which a production timing frame is defined, which connects this part of the course with the first one. Finally, the third part of the course is devoted to the work with FORAN, an Engineering Production package of widespread use in the shipbuilding industry. With this package, the frames and plates where all the outfitting will be carried out are defined through cooperative work by the studens, working simultaneously in the same 3D model. In the paper, specific details about the learning process are given. Surveys have been posed to the students in order to get feed-back from their experience as well as to assess their satisfaction with the learning process. Results from these surveys are discussed in the paper
Resumo:
La crisis afecta a todos los sectores, es un terremoto en cadena que se inicio en el sector inmobiliario y se ha ido introduciendo en el resto. Todo esto ha dado lugar a una caída brusca de la demanda de los servicios relacionados con la construcción, con un posicionamiento en “espera” de los Promotores e Inversores, que aún tienen liquidez para invertir, buscando oportunidades que lógicamente se tienen que producir en un entorno escasamente fiable como el actual. Aquellos Inversores que vean oportunidades, se aseguraran de que los productos que van a realizar, tengan una demanda suficiente, sus costes estén en consonancia con el mercado, pero sin que aquello perjudique al resultado final, es decir manteniendo la calidad propuesta al inicio del proceso con los costes previstos, dando lugar a un control exhaustivo del producto a realizar, lo cual obligará a una gran profesionalidad por parte de los agentes implicados. Para todo esto habrá que contar con Empresas especializadas, que aporten garantías en este proceso y aseguren tanto al promotor como al Inversor en todo momento donde y en que se invierten sus recursos. La Dirección Integrada de Proyecto (“Project Management “) aplicada al proceso constructivo es una Técnica Metodológica que ayuda a organizar, controlar y gestionar los recursos de los promotores dentro del proceso edificatorio. Cuando los recursos están limitados (que normalmente es la mayoría de las situaciones) gestionarlos de una manera eficiente se convierte en algo muy importante. Bien, pues nos encontramos con que en esta situación actual, los recursos no solo están limitados, si no que son limitados, por lo que un control y un exhaustivo seguimiento de los mismos se convierte no solo en importante si no en fundamental.
Resumo:
In the year 1999 approves the Law of Construction Building (LOE, in Spanish) to regulate a sector such as construction, which contained some shortcomings from the legal point of view. Currently, the LOE has been in force 12 years, changing the spanish world of the construction, due to influenced by internationalization. Within the LOE, there regulating the different actors involved in the construction building, as the Projects design, the Director of Construction, the developer, The builder, Director of execution of the construction (actor only in Spain, similar as construcion engineer and abroad in), control entities and the users, but lacks figure Project manager will assume the delegation of the promoter helping and you organize, direct and management the process. This figure assumes that the market and contracts are not legally regulated in Spain, then should define and establish its regulation in the LOE. (Spain Construction Law) The translation in spanish of the words "Project Manager is owed to Professor Rafael de Heredia in his book Integrated Project Management, as agent acting on behalf of the organization and promoter assuming control of the project, ie Integraded Project Management . Already exist in Spain, AEDIP (Spanish Association Integrated of Project Construction management) which comprises the major companies in “Project Management” in Spain, and MeDIP (Master in Integrated Construction Project) the largest and most advanced studies at the Polytechnic University of Madrid, in "Construction Project Management" they teach which is also in Argentina. The Integrated Project ("Project Management") applied to the construction process is a methodological technique that helps to organize, control and manage the resources of the promoters in the building process. When resources are limited (which is usually most situations) to manage them efficiently becomes very important. Well, we find that in this situation, the resources are not only limited, but it is limited, so a comprehensive control and monitoring of them becomes not only important if not crucial. The alternative of starting from scratch with a team that specializes in developing these follow directly intervening to ensure that scarce resources are used in the best possible way requires the use of a specific methodology (Manual DIP, Matrix Foreign EDR breakdown structure EDP Project, Risk Management and Control, Design Management, et ..), that is the methodology used by "Projects managers" to ensure that the initial objectives of the promoters or investors are met and all actors in process, from design to construction company have the mind aim of the project will do, trying to get their interests do not prevail over the interests of the project. Among the agents listed in the building process, "Project Management" or DIPE (Director Comprehensive building process, a proposed name for possible incorporation into the LOE, ) currently not listed as such in the LOE (Act on Construction Planning ), one of the agents that exist within the building process is not regulated from the legal point of view, no obligations, ie, as is required by law to have a project, a builder, a construction management, etc. DIPE only one who wants to hire you as have been advanced knowledge of their services by the clients they have been hiring these agents, there being no legal obligation as mentioned above, then the market is dictating its ruling on this new figure, as if it were necessary, he was not hired and eventually disappeared from the building process. As the aim of this article is regular the process and implement the name of DIPE in the Spanish Law of buildings construction (LOE)
Resumo:
The interactions among three important issues involved in the implementation of logic programs in parallel (goal scheduling, precedence, and memory management) are discussed. A simplified, parallel memory management model and an efficient, load-balancing goal scheduling strategy are presented. It is shown how, for systems which support "don't know" non-determinism, special care has to be taken during goal scheduling if the space recovery characteristics of sequential systems are to be preserved. A solution based on selecting only "newer" goals for execution is described, and an algorithm is proposed for efficiently maintaining and determining precedence relationships and variable ages across parallel goals. It is argued that the proposed schemes and algorithms make it possible to extend the storage performance of sequential systems to parallel execution without the considerable overhead previously associated with it. The results are applicable to a wide class of parallel and coroutining systems, and they represent an efficient alternative to "all heap" or "spaghetti stack" allocation models.