919 resultados para Hydropower scheduling


Relevância:

20.00% 20.00%

Publicador:

Resumo:

Class-based service differentiation is provided in DiffServ networks. However, this differentiation will be disordered under dynamic traffic loads due to the fixed weighted scheduling. An adaptive weighted scheduling scheme is proposed in this paper to achieve fair bandwidth allocation among different service classes. In this scheme, the number of active flows and the subscribed bandwidth are estimated based on the measurement of local queue metrics, then the scheduling weights of each service class are adjusted for the per-flow fairness of excess bandwidth allocation. This adaptive scheme can be combined with any weighted scheduling algorithm. Simulation results show that, comparing with fixed weighted scheduling, it effectively improve the fairness of excess bandwidth allocation.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

DUE TO COPYRIGHT RESTRICTIONS ONLY AVAILABLE FOR CONSULTATION AT ASTON UNIVERSITY LIBRARY AND INFORMATION SERVICES WITH PRIOR ARRANGEMENT

Relevância:

20.00% 20.00%

Publicador:

Resumo:

DUE TO COPYRIGHT RESTRICTIONS ONLY AVAILABLE FOR CONSULTATION AT ASTON UNIVERSITY LIBRARY AND INFORMATION SERVICES WITH PRIOR ARRANGEMENT

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This paper presents a simulated genetic algorithm (GA) model of scheduling the flow shop problem with re-entrant jobs. The objective of this research is to minimize the weighted tardiness and makespan. The proposed model considers that the jobs with non-identical due dates are processed on the machines in the same order. Furthermore, the re-entrant jobs are stochastic as only some jobs are required to reenter to the flow shop. The tardiness weight is adjusted once the jobs reenter to the shop. The performance of the proposed GA model is verified by a number of numerical experiments where the data come from the case company. The results show the proposed method has a higher order satisfaction rate than the current industrial practices.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Computational performance increasingly depends on parallelism, and many systems rely on heterogeneous resources such as GPUs and FPGAs to accelerate computationally intensive applications. However, implementations for such heterogeneous systems are often hand-crafted and optimised to one computation scenario, and it can be challenging to maintain high performance when application parameters change. In this paper, we demonstrate that machine learning can help to dynamically choose parameters for task scheduling and load-balancing based on changing characteristics of the incoming workload. We use a financial option pricing application as a case study. We propose a simulation of processing financial tasks on a heterogeneous system with GPUs and FPGAs, and show how dynamic, on-line optimisations could improve such a system. We compare on-line and batch processing algorithms, and we also consider cases with no dynamic optimisations.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Composite Web Services (CWS) aggregate multiple Web Services in one logical unit to accomplish a complex task (e.g. business process). This aggregation is achieved by defining a workflow that orchestrates the underlying Web Services in a manner consistent with the desired functionality. Since CWS can aggregate atomic and other CWS they foster the development of service layers and reuse of already existing functionality. An important issue in the deployment of services is their run-time performance under various loads. Due to the complex interactions of the underlying services, a CWS they can exhibit problematic and often difficult to predict behaviours in overload situations. This paper focuses on the use of request scheduling for improving CWS performance in overload situations. Different scheduling policies are investigated in regards to their effectiveness in helping with bulk arrivals.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The re-entrant flow shop scheduling problem (RFSP) is regarded as a NP-hard problem and attracted the attention of both researchers and industry. Current approach attempts to minimize the makespan of RFSP without considering the interdependency between the resource constraints and the re-entrant probability. This paper proposed Multi-level genetic algorithm (GA) by including the co-related re-entrant possibility and production mode in multi-level chromosome encoding. Repair operator is incorporated in the Multi-level genetic algorithm so as to revise the infeasible solution by resolving the resource conflict. With the objective of minimizing the makespan, Multi-level genetic algorithm (GA) is proposed and ANOVA is used to fine tune the parameter setting of GA. The experiment shows that the proposed approach is more effective to find the near-optimal schedule than the simulated annealing algorithm for both small-size problem and large-size problem. © 2013 Published by Elsevier Ltd.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

We propose the adaptive algorithm for solving a set of similar scheduling problems using learning technology. It is devised to combine the merits of an exact algorithm based on the mixed graph model and heuristics oriented on the real-world scheduling problems. The former may ensure high quality of the solution by means of an implicit exhausting enumeration of the feasible schedules. The latter may be developed for certain type of problems using their peculiarities. The main idea of the learning technology is to produce effective (in performance measure) and efficient (in computational time) heuristics by adapting local decisions for the scheduling problems under consideration. Adaptation is realized at the stage of learning while solving a set of sample scheduling problems using a branch-and-bound algorithm and structuring knowledge using pattern recognition apparatus.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

In this paper an evolutionary algorithm is proposed for solving the problem of production scheduling in assembly system. The aim of the paper is to investigate a possibility of the application of evolutionary algorithms in the assembly system of a normally functioning enterprise producing household appliances to make the production graphic schedule.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Purpose - This research note aims to present a summary of research concerning economic-lot scheduling problem (ELSP). Design/methodology/approach - The paper's approach is to review over 100 selected studies published in the last 15 years (1997-2012), which are then grouped under different research themes. Findings - Five research themes are identified and insights for future studies are reported at the end of this paper. Research limitations/implications - The motivation of preparing this research note is to summarize key research studies in this field since 1997, when the ELSP problems have been verified as NP-hard. Originality/value - ELSP is an important scheduling problem that has been studied since the 1950s. Because of its complexity in delivering a feasible analytical closed form solution, many studies in the last two decades employed heuristic algorithms in order to come up with good and acceptable solutions. As a consequence, the solution approaches are quite diversified. The major contribution of this paper is to provide researchers who are interested in this area with a quick reference guide on the reviewed studies. © Emerald Group Publishing Limited.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

ACM Computing Classification System (1998): I.2.8, G.1.6.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

In this paper a new approach to the resource allocation and scheduling mechanism that reflects the effect of user's Quality of Experience is presented. The proposed scheduling algorithm is examined in the context of 3GPP Long Term Evolution (LTE) system. Pause Intensity (PI) as an objective and no-reference quality assessment metric is employed to represent user's satisfaction in the scheduler of eNodeB. PI is in fact a measurement of discontinuity in the service. The performance of the scheduling method proposed is compared with two extreme cases: maxCI and Round Robin scheduling schemes which correspond to the efficiency and fairness oriented mechanisms, respectively. Our work reveals that the proposed method is able to perform between fairness and efficiency requirements, in favor of higher satisfaction for the users to the desired level. © VDE VERLAG GMBH.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Ebben a tanulmányban a szerző egy új harmóniakereső metaheurisztikát mutat be, amely a minimális időtartamú erőforrás-korlátos ütemezések halmazán a projekt nettó jelenértékét maximalizálja. Az optimális ütemezés elméletileg két egész értékű (nulla-egy típusú) programozási feladat megoldását jelenti, ahol az első lépésben meghatározzuk a minimális időtartamú erőforrás-korlátos ütemezések időtartamát, majd a második lépésben az optimális időtartamot feltételként kezelve megoldjuk a nettó jelenérték maximalizálási problémát minimális időtartamú erőforrás-korlátos ütemezések halmazán. A probléma NP-hard jellege miatt az egzakt megoldás elfogadható idő alatt csak kisméretű projektek esetében képzelhető el. A bemutatandó metaheurisztika a Csébfalvi (2007) által a minimális időtartamú erőforrás-korlátos ütemezések időtartamának meghatározására és a tevékenységek ennek megfelelő ütemezésére kifejlesztett harmóniakereső metaheurisztika továbbfejlesztése, amely az erőforrás-felhasználási konfliktusokat elsőbbségi kapcsolatok beépítésével oldja fel. Az ajánlott metaheurisztika hatékonyságának és életképességének szemléltetésére számítási eredményeket adunk a jól ismert és népszerű PSPLIB tesztkönyvtár J30 részhalmazán futtatva. Az egzakt megoldás generálásához egy korszerű MILP-szoftvert (CPLEX) alkalmaztunk. _______________ This paper presents a harmony search metaheuristic for the resource-constrained project scheduling problem with discounted cash flows. In the proposed approach, a resource-constrained project is characterized by its „best” schedule, where best means a makespan minimal resource constrained schedule for which the net present value (NPV) measure is maximal. Theoretically the optimal schedule searching process is formulated as a twophase mixed integer linear programming (MILP) problem, which can be solved for small-scale projects in reasonable time. The applied metaheuristic is based on the "conflict repairing" version of the "Sounds of Silence" harmony search metaheuristic developed by Csébfalvi (2007) for the resource-constrained project scheduling problem (RCPSP). In order to illustrate the essence and viability of the proposed harmony search metaheuristic, we present computational results for a J30 subset from the well-known and popular PSPLIB. To generate the exact solutions a state-of-the-art MILP solver (CPLEX) was used.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The purpose of this study was to evaluate the effectiveness of an alternate day block schedule design (n = 419) versus a traditional six-period schedule design (n = 623) on the academic achievement of the graduating classes in two schools in which the design was used respectively. Academic achievement was measured by (a) two standardized tests: the Florida Comprehensive Assessment Test Sunshine State Standards (FCAT-SSS) in mathematics and reading for 9th and 10th grade and the Scholastic Reading Inventory Test (SRI) for 9 th, 10th, and 11th grade; (b) three school grades: the mathematics final course grades for 9th, 10th, and 11th grade, the English final course grades for 9th, 10th, 11th, and 12th grade and the graduating GPA. A total of five repeated measure analyses of variance (ANOVAs) were conducted to analyze the difference between the two schools (representing the two designs) with respect to five achievement indicators (FCAT-SSS mathematics scores, FCAT-SSS reading scores, SRI scores, mathematics final course grades, and English final course grades). The between-subject factor for the five ANOVAs was the schedule design and the within-subject factor was the time the tests were taken or the time the course grades were issued. T-tests were performed on all eighth grade achievement indicators to ensure there were no significant differences in achievement between the two cohorts prior to entering high school. An independent samples t-test was conducted to analyze the difference between the two schedule designs with respect to graduating GPA. Achievement in the alternate day block schedule design was significantly higher than in the traditional six-period schedule design for some of the locally assigned school grades. The difference between the two types of schedule designs was not significant for the standardized measures (the FCAT-SSS in reading and mathematics and the SRI). This study concludes that the use of an alternate day block schedule design can be considered an educational tool that can help improve the academic achievement of students as measured by local indicators of achievement; but, apparently the design is not an important factor in achievement as measured by state examinations such as the FCAT-SSS or the SRI.