940 resultados para Electric power systems -- Quality control
Resumo:
Dissertação para a obtenção do grau de Mestre em Engenharia Electrotécnica - Ramo de Energia
Resumo:
The main objective of the study was to define the methodology for assessing the limits for application island grids instead of interconnecting with existing grid infrastructure. The model for simulation of grid extension distance and levelised cost of electricity has been developed and validated by the case study in Finland. Thereafter, sensitivities of the application limits were examined with the respect to operational environment, load conditions, supply security and geographical location. Finally, recommendations for the small-scale rural electrification projects in the market economy environment have been proposed.
Resumo:
At present, the electricity generation through wind energy has an importance growing in the world, with the existence of very large plans for future wind power installation worldwide. Thus, the increasing the electricity generation through wind power requires, more and more, analysis of studies of interaction between wind parks and electric power systems. This paper has as purposes to implement equivalent models for synchronous wind generators to represent a wind park in ATP program and to check behavior of the models through simulations. Simulations with applications of faults were achieved to evaluate the behavior of voltages of system for each equivalent model, through comparisons between the results of models proposed, to verify if the differences obtained allows the adoption of the simplest model
Resumo:
Currently, there are several power converter topologies applied to wind power generation. The converters allow the use of wind turbines operating at variable speed, enabling better use of wind forces. The high performance of the converters is being increasingly demanded, mainly because of the increase in the power generation capacity by wind turbines, which gave rise to various converter topologies, such as parallel or multilevel converters. The use of converters allow effective control of the power injected into the grid, either partially, for the case using partial converter, or total control for the case of using full converter. The back-to-back converter is one of the most used topologies in the market today, due to its simple structure, with few components, contributing to robust and reliable performance. In this work, is presented the implementation of a wind cogeneration system using a permanent magnet synchronous generator (PMSG) associated with a back-to-back power converter is proposed, in order to inject active power in an electric power system. The control strategy of the active power delivered to the grid by cogeneration is based on the philosophy of indirect control
Resumo:
Conselho Nacional de Desenvolvimento Científico e Tecnológico (CNPq)
Resumo:
The paper describes a novel neural model to electrical load forecasting in transformers. The network acts as identifier of structural features to forecast process. So that output parameters can be estimated and generalized from an input parameter set. The model was trained and assessed through load data extracted from a Brazilian Electric Utility taking into account time, current, tension, active power in the three phases of the system. The results obtained in the simulations show that the developed technique can be used as an alternative tool to become more appropriate for planning of electric power systems.
Resumo:
This article presents a well-known interior point method (IPM) used to solve problems of linear programming that appear as sub-problems in the solution of the long-term transmission network expansion planning problem. The linear programming problem appears when the transportation model is used, and when there is the intention to solve the planning problem using a constructive heuristic algorithm (CHA), ora branch-and-bound algorithm. This paper shows the application of the IPM in a CHA. A good performance of the IPM was obtained, and then it can be used as tool inside algorithm, used to solve the planning problem. Illustrative tests are shown, using electrical systems known in the specialized literature. (C) 2005 Elsevier B.V. All rights reserved.
Resumo:
This work proposes a methodology to generalize the Y-connections for 12- and 18-pulse autotransformers. A single mathematical expression, obtained through simple trigonometric operations, represents all the connections. The proposed methodology allows choosing any ratio between the input and the output voltages. The converters can operate either as step-up or as step-down voltage. To simplify the design of the windings, graphics are generated to calculate the turn-ratio and the polarity of each secondary winding, with respect to the primary winding. A design example, followed by digital simulations, illustrates the presented steps. Experimental results of two prototypes (12 and 18 pulses) are presented. The results also show that high power factor is an inherent characteristic of multi-pulse converters, without any active or passive power factor pre-regulators needs. (c) 2005 Elsevier B.V. All rights reserved.
Resumo:
Fundação de Amparo à Pesquisa do Estado de São Paulo (FAPESP)
Resumo:
Fundação de Amparo à Pesquisa do Estado de São Paulo (FAPESP)
Resumo:
Single real transformation matrices are tested as phase-mode transformation matrices of typical symmetrical systems with double three-phase and two parallel double three-phase transmission lines. These single real transformation matrices are achieved from eigenvector matrices of the mentioned systems and they are based on Clarke's matrix. Using linear combinations of the Clarke's matrix elements, the techniques applied to the single three-phase lines are extended to systems with 6 or 12 phase conductors. For transposed double three-phase lines, phase Z and Y matrices are changed into diagonal matrices in mode domain. Considering non-transposed cases of double three-phase lines, the results are not exact and the error analyses are performed using the exact eigenvalues. In case of two parallel double three-phase lines, the exact single real transformation matrix has not been obtained yet. Searching for this exact matrix, the analyses are based on a single homopolar reference. For all analyses in this paper, the homopolar mode is used as the only homopolar reference for all phase conductors of the studied system. (C) 2008 Elsevier B.V. All rights reserved.
Resumo:
An analysis of the performance of six major methods of loss allocation for generators and demands was conducted, based on pro-rata (two), on incremental factors (two), on proportional sharing (PS) (one), and on electric circuit theory (one). Using relatively simple examples which can easily be checked, the advantages and disadvantages of each were ascertained and the results confirmed using a larger sample system (IEEE-118). The discussion considers the location and size of generators and demands, as well as the merits of the location of these agents for each configuration based on an analysis of the effect of various network modifications. Furthermore, an application in the South-Southeastern Brazilian Systems is performed. Conclusions and recommendations are presented. (C) 2004 Elsevier B.V. All rights reserved.
Resumo:
This paper presents an analysis and discussion, based on cooperative game theory, for the allocation of the cost of losses to generators and demands in transmission systems. We construct a cooperative game theory model in which the players are represented by equivalent bilateral exchanges and we search for a unique loss allocation solution, the Core. Other solution concepts, such as the Shapley Value, the Bilateral Shapley Value and the Kernel are also explored. Our main objective is to illustrate why is not possible to find an optimal solution for allocating the cost of losses to the users of a network. Results and relevant conclusions are presented for a 4-bus system and a 14-bus system. (c) 2007 Elsevier B.V. All rights reserved.
Resumo:
This work is devoted to Study and discuss the main methods to solve the network cost allocation problem both for generators and demands. From the presented, compared and discussed methods, the first one is based on power injections, the second deals with proportional sharing factors, the third is based upon Equivalent Bilateral Exchanges, the fourth analyzes the power How sensitivity in relation to the power injected, and the last one is based on Z(bus) network matrix. All the methods are initially illustrated using a 4-bus system. In addition, the IEEE 24-bus RTS system is presented for further comparisons and analysis. Appropriate conclusions are finally drawn. (C) 2008 Elsevier B.V. All rights reserved.
Resumo:
Teaching a course of special electric loads in a continuing education program to power engineers is a difficult task because they are not familiarized with switching topology circuits. Normally, in a typical program, many hours are dedicated to explain the thyristors switching sequence and to draw the converter currents and terminal voltages waveforms for different operative conditions. This work presents teaching support software in order to optimize the time spent in this task and, mainly to benefit the assimilation of the proposed subjects, studying the static converter under different non-ideal operative conditions.