848 resultados para Construction management


Relevância:

60.00% 60.00%

Publicador:

Resumo:

The construction industry is a crucial component of the Hong Kong economy, and the safety and efficiency of workers are two of its main concerns. The current approach to training workers relies primarily on instilling practice and experience in conventional teacher-apprentice settings on and off site. Both have their limitations however, on-site training is very inefficient and interferes with progress on site, while off-site training provides little opportunity to develop the practical skills and awareness needed through hands-on experience. A more effective way is to train workers in safety awareness and efficient working by current novel information technologies. This paper describes a new and innovative prototype system – the Proactive Construction Management System (PCMS) – to train precast installation workers to be highly productive while being fully aware of the hazards involved. PCMS uses Chirp-Spread-Spectrum-based (CSS) real-time location technology and Unity3D-based data visualisation technology to track construction resources (people, equipment, materials, etc.) and provide real-time feedback and post-event visualisation analysis in a training environment. A trial of a precast facade installation on a real site demonstrates the benefits gained by PCMS in comparison with equivalent training using conventional methods. It is concluded that, although the study is based on specific industrial conditions found in Hong Kong construction projects, PCMS may well attract wider interest and use in future.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

Railways are an important mode of transportation. They are however large and complex and their construction, management and operation is time consuming and costly. Evidently planning the current and future activities is vital. Part of that planning process is an analysis of capacity. To determine what volume of traffic can be achieved over time, a variety of railway capacity analysis techniques have been created. A generic analytical approach that incorporates more complex train paths however has yet to be provided. This article provides such an approach. This article extends a mathematical model for determining the theoretical capacity of a railway network. The main contribution of this paper is the modelling of more complex train paths whereby each section can be visited many times in the course of a train’s journey. Three variant models are formulated and then demonstrated in a case study. This article’s numerical investigations have successively shown the applicability of the proposed models and how they may be used to gain insights into system performance.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

This paper explores the effects of PLM and BIM on professional practice. It draws on existing literature documenting the experiences of both communities of practice to explain shifts in professional boundaries. A review of case study based literature compares the nature of changes triggered by PLM and BIM relative to the new activities, roles/responsibilities and knowledge competencies, and supply chain relationships. The paper synthesises these changes and reflects PLM and BIM experiences against each other so as to contrast the continuing evolution of professional practice and lessons learned.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

Building energy-efficiency (BEE) is the key to drive the promotion of energy saving in building sector. A large variety of building energy-efficiency policy instrument exist. Some are mandatory, some are soft scheme, and some use economic incentives from country to country. This paper presents the current development of implementing BEE policy instruments by examining the practices of BEE in seven selected countries and regions. In the study, BEE policy instruments are classified into three groups, including mandatory administration control instruments, economic incentive instruments and voluntary scheme instruments. The study shows that different countries have adopted different instruments in their practices for achieving the target of energy-saving and gained various kinds of experiences. It is important to share these experiences gained.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

Purpose of this paper One way in which the tendering process can be further improved is by reviewing and clarifying the high costs that participants face during the course of the tendering phase. The study aims to provide project teams working in construction tender preparation a clear picture of what to expect when tendering for infrastructure projects. Design/methodology/approach Firstly, a review of current literature on tendering in infrastructure projects is conducted to identify the associated costs affecting traditional and PPP procurements as well as the potential measures contributing to tendering cost-reduction. A theoretical framework and its corresponding research hypotheses, which are based on the literature reviewed, are then proposed. An industry-wide questionnaire survey is currently under design to solicit industry practitioners’ views on tendering costs and the associated tendering cost-reduction measures. The data collected in the survey will subject to statistical analysis to test the proposed research hypotheses, which will be reported in a forthcoming paper. Findings and value The direct and indirect costs in public-private procurement have been identified and have been categorised into internal and external costs arising from working on tender submissions. A theoretical framework, mainly composed of five mechanisms of cost reduction, has been proposed and will be tested in a forthcoming industry-wide questionnaire survey. Originality/value of paper The findings are expected to lead to a transparent tendering process in infrastructure procurement, in which there is increased engagement from the private sector as well as an increase in competitive tendering.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

Christina Waterson interviews Queensland interior designer Marisha McAuliffe about her PhD research into process, and why some people are drawn to create.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

For design-build (DB) projects, owners normally use lump sum and Guaranteed Maximum Price (GMP) as the major contract payment provisions. However, there was a lack of empirical studies to compare the project performance within different contract types and investigate how different project characteristics affect the owners’ selection of contract arrangement. Project information from Design-build Institute of America (DBIA) database was collected to reveal the statistical relationship between different project characteristics and contract types and to compare project performance between lump sum and GMP contract. The results show that lump sum is still the most frequently used contract method for DB projects, especially in the public sector. However, projects using GMP contract are more likely to have less schedule delay and cost overrun as compared to those with lump sum contract. The chi-square tests of cross tabulations reveal that project type, owner type, and procurement method affect the selection of contract types significantly. Civil infrastructure rather than industrial engineering project tends to use lump sum more frequently; and qualification-oriented contractor selection process resorts to GMP more often compared with cost-oriented process. The findings of this research contribute to the current body of knowledge concerning the effect of associated project characteristics on contract type selection. Overall, the results of this study provide empirical evidence from real DB projects that can be used by owners to select appropriate contract types and eventually improve future project performance.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

Sustainability has become crucial for the energy industry as projects in this industry are extensively large and complex and have significant impacts on the environment, community and economy. It demands the energy industry to proactively incorporate sustainability ideas and commit to sustainable project development. This study aims to investigate how the Australian energy industry responds to sustainability requirements and in particular what indicators used to measure sustainability performance. To achieve this, content analysis of sustainability reports, vision statements and policy statements of Australian energy companies listed in the 2013 PLATTS Top 250 Global Energy Company Rankings and government reports relating to sustainability has been conducted. The findings show that the energy companies extensively discuss sustainability aspects within three dimensions, i.e. community, environment, and economy. Their primary goals in sustainability are supplying cleaner energy for future, and doing business in a way that improves outcomes for shareholders, employees, business partners and the communities. In particular, energy companies have valued the employees of the business as a one of the key area that needs to be considered. Furthermore, the energy industry has become increasingly aware of the importance of measuring sustainability performance to achieve sustainability goals. A number of sustainability indicators have been developed on the basis of the key themes beyond economic measures. It is envisaged that findings from this research will help stakeholders in the energy industry to adopt different indicators to evaluate and ultimately achieve sustainability performance.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

Green infrastructure is considered as a strategic approach to address the ecological and social impacts of urban sprawl. The main elements of green infrastructure have been well established and include a series of multifunctional ecological systems, such as green urban space, green road infrastructure and the links between these systems. However, it should be noted that the elements of green road infrastructure have only been briefly mentioned in isolated life cycle stages, e.g. design, procurement, construction, maintenance and operation. The definition of green road infrastructure and the elements in green road infrastructure projects remain largely unknown. To explore the elements in green road infrastructure, a critical review was adopted. As the development of green road infrastructure projects is guided by rating systems, a comparison of three major green roads rating systems, including GreenroadsTM, EnvisionTM and Infrastructure Sustainability Rating Tool—IS, was conducted. The comparison reveals that green roads can be defined as road projects that have superior performance in economic, social and environmental sustainability. The sustainability features in green roads mainly include environmental sustainability, social sustainability, economic sustainability, quality, pavement technology and innovation. The results will contribute to an increased understanding of green roads and will be useful to improve the performance of road projects on these sustainability features.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

How can obstacles to innovation be overcome in road construction? Using a focus group methodology, and based on two prior rounds of empirical work, the analysis in this chapter generates a set of four key solutions to two main construction innovation obstacles: (1) restrictive tender assessment and (2) disagreement over who carries the risk of new product failure. The four key solutions uncovered were: 1) pre-project product certification; 2) past innovation performance assessment; 3) earlier involvement of product suppliers and road asset operators; and 4) performance-based specifications. Additional research is suggested in order to illicit deeper insights into possible solutions to construction innovation obstacles, and should emphasise furthering the theoretical interpretation of empirical phenomena.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

Alternative dispute resolution (ADR) methods, such as arbitration, are often used instead of litigation to resolve construction disputes, as industry folklore considers litigation overly expensive and time-consuming. But is this actually the case? Do the people most involved in construction dispute resolution agree? What are the real advantages and disadvantages of using litigation or ADR? When, if ever, is litigation the most appropriate way of resolving construction disputes? To answer these questions, this paper first provides a review of the literature on the use of litigation and ADR for construction dispute resolution. This is followed by the results of a survey of construction and legal personnel with moderate to extensive experience of dispute resolution in the Australian South-East Queensland construction industry. The main results of this are that, in addition to litigation being more expensive in money and time than ADR methods, the nature of the existing relationship between the parties has an important effect on the resolution process, what happens after an unsuccessful ADR and, if adversarial, is more likely to lead to litigation. The results are then validated and verified by one of the most experienced practitioners in claims and disputes in the whole of Australia.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

Australia is a leading user of collaborative procurement methods, which are used to deliver large and complex infrastructure projects. Project alliances, Early Contractor Involvement (ECI), and partnering are typical examples of collaborative procurement models. In order to increase procurement effectiveness and value for money (VfM), clients have adopted various learning strategies for new contract development. However client learning strategies and behaviours have not been systematically analysed before. Therefore, the current paper undertakes a literature review addressing the research question “How can client learning capabilities be effectively understood?”. From the resource-based and dynamic capability perspectives, this paper proposes that the collaborative learning capability (CLC) of clients drives procurement model evolution. Learning routines underpinning CLC carry out exploratory, transformative and exploitative learning phases associated with collaborative project delivery. This learning improves operating routines, and ultimately performance. The conceptualization of CLC and the three sequential learning phases is used to analyse the evidence in the construction management literature. The main contribution of this study is the presentation of a theoretical foundation for future empirical studies to unveil effective learning strategies, which help clients to improve the performance of collaborative projects in the dynamic infrastructure market.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

The Australian ageing society with baby boomers reaching retirement age has placed a lot of pressures on housing services. The retirement village is increasingly accepted as a suitable living arrangement for older people. Ecological theory of ageing emphasizes a match between environment and older peoples’ competences. As one response to this, creating village environment in a sustainable way is on the agenda. However, it is not very clear what kinds of sustainable features should be incorporated within the village environment to fit residents’ competences, in particular given that baby boomers who have unique requirements have become the main potential customers. In present paper, a sustainable retirement village framework is proposed by building on ecological theory of ageing and triple bottom line. A two-step inductive reasoning research method is adopted in this conceptualization process. The proposed sustainable retirement village framework contains four domains, including senior-oriented basic settings, financial affordability, age-friendly social environment and environmental sustainability. These four domains are interrelated, and a sustainable retirement village stresses a dynamic balance between different domains. This proposed framework not only gives implications for village developers on creating a suitable village environment to better accommodate residents, but also paves the way for future studies on housing older people in an age-friendly manner.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

The importance of developing effective disaster management strategies has significantly grown as the world continues to be confronted with unprecedented disastrous events. Factors such as climate instability, recent urbanization along with rapid population growth in many cities around the world have unwittingly exacerbated the risks of potential disasters, leaving a large number of people and infrastructure exposed to new forms of threats from natural disasters such as flooding, cyclones, and earthquakes. With disasters on the rise, effective recovery planning of the built environment is becoming imperative as it is not only closely related to the well-being and essential functioning of society, but it also requires significant financial commitment. In the built environment context, post-disaster reconstruction focuses essentially on the repair and reconstruction of physical infrastructures. The reconstruction and rehabilitation efforts are generally performed in the form of collaborative partnerships that involve multiple organisations, enabling the restoration of interdependencies that exist between infrastructure systems such as energy, water (including wastewater), transport, and telecommunication systems. These interdependencies are major determinants of vulnerabilities and risks encountered by critical infrastructures and therefore have significant implications for post-disaster recovery. When disrupted by natural disasters, such interdependencies have the potential to promote the propagation of failures between critical infrastructures at various levels, and thus can have dire consequences on reconstruction activities. This paper outlines the results of a pilot study on how elements of infrastructure interdependencies have the potential to impede the post-disaster recovery effort. Using a set of unstructured interview questionnaires, plausible arguments provided by seven respondents revealed that during post-disaster recovery, critical infrastructures are mutually dependent on each other’s uninterrupted availability, both physically and through a host of information and communication technologies. Major disruption to their physical and cyber interdependencies could lead to cascading failures, which could delay the recovery effort. Thus, the existing interrelationship between critical infrastructures requires that the entire interconnected network be considered when managing reconstruction activities during the post-disaster recovery period.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

In Australia, the retirement village is regarded as a viable accommodation option for the fast-growing population of older people. Given that diverse stakeholders are involved in the village development process, a comprehensive stakeholder analysis, especially understanding stakeholders' concerns and expectations, is of critical importance to project success. This paper describes a stakeholder analysis based on a typical retirement village. The main methods utilized in this research were case study and an interdisciplinary workshop comprising intensive work sessions and cross-functional review. The participants of this 2014 Brisbane workshop included four village managers from an Australian retirement village developer and eight academics from diverse disciplines from a large university. Through this workshop, 24 village stakeholders and their specific concerns and expectations were identified. Results suggest that both concerns and expectations of these stakeholders are multidimensional and vary considerably, and the concerns and expectations of different stakeholders have complex relationships. Implications for a retirement village development are also proposed. The findings of the study serve as a valuable reference for developers' understanding of stakeholder concerns and expectations, and for taking corresponding actions in the final stages of the retirement village development.