932 resultados para 290804 Construction Engineering
Resumo:
Background: In sub-tropical and tropical Queensland, a legacy of poor housing design,minimal building regulations with few compliance measures, an absence of post-construction performance evaluation and various social and market factors has led to a high and growing penetration of, and reliance on, air conditioners to provide thermal comfort for occupants. The pervasive reliance on air conditioners has arguably impacted on building forms, changed cultural expectations of comfort and social practices for achieving comfort, and may have resulted in a loss of skills in designing and constructing high performance building envelopes. Aim: The aim of this paper is to report on initial outcomes of a project that sought to determine how the predicted building thermal performance of twenty-five houses in subtropical and tropical Queensland compared with objective performance measures and comfort performance as perceived by occupants. The purpose of the project was to shed light on the role of various supply chain agents in the realisation of thermal performance outcomes. Methodology: The case study methodology embraced a socio-technical approach incorporating building science and sociology. Building simulation was used to model thermal performance under controlled comfort assumptions and adaptive comfort conditions. Actual indoor climate conditions were measured by temperature and relative humidity sensors placed throughout each house, whilst occupants’ expectations of thermal comfort and their self-reported behaviours were gathered through semi-structured interviews and periodic comfort surveys. Thermal imaging and air infiltration tests, along with building design documents, were analysed to evaluate the influence of various supply chain agents on the actual performance outcomes. Results: The results clearly show that in the housing supply chain – from designer to constructor to occupant – there is limited understanding from each agent of their role in contributing to, or inhibiting, occupants’ comfort.
Resumo:
Australia is currently experiencing a resources boom and jobs in the male dominated fields of construction and engineering are at a premium. Employment in the construction industry, historically and today, is overwhelmingly male and, with an ageing population this predominately older male workforce will be retiring in greater numbers in the coming decade. Despite more that 25 years of anti- discrimination legislation and equal opportunity legislation these industries still employ few women in operational roles. This paper investigates the issue of the low representation of women in the construction industry. Our investigation involves the analysis of 95 organisation progress reports on the equal opportunity strategic programs in the construction industry. Findings indicate that this industry is not engaging with equal employment opportunity programs and further that equity outcomes for women in the industry are not evident.
Resumo:
A graph theoretic approach is developed for accurately computing haulage costs in earthwork projects. This is vital as haulage is a predominant factor in the real cost of earthworks. A variety of metrics can be used in our approach, but a fuel consumption proxy is recommended. This approach is novel as it considers the constantly changing terrain that results from cutting and filling activities and replaces inaccurate “static” calculations that have been used previously. The approach is also capable of efficiently correcting the violation of top down cutting and bottom up filling conditions that can be found in existing earthwork assignments and sequences. This approach assumes that the project site is partitioned into uniform blocks. A directed graph is then utilised to describe the terrain surface. This digraph is altered after each cut and fill, in order to reflect the true state of the terrain. A shortest path algorithm is successively applied to calculate the cost of each haul and these costs are summed to provide a total cost of haulage
Resumo:
The construction industry has an obligation to respond to sustainability expectations of our society. Solutions that integrate innovative, intelligent and sustainability deliverables are vital for us to meet new and emerging challenges. Industrialised Building Systems (IBS), or known otherwise as prefabrication, employs a combination of ready-made components in the construction of buildings. They promote quality of production, enhance simplification of construction processes and minimise waste. The unique characteristics of this construction method respond well to sustainability. Despite the promises however, IBS has yet to be effectively implemented in Malaysia. There are often misconceptions among key stakeholders about IBS applications. The existing rating schemes fail to assess IBS against sustainability measures. To ensure the capture of full sustainability potential in buildings developed, the critical factors and action plans agreeable to all participants in the development processes need to be identified. Through questionnaire survey, eighteen critical factors relevant to IBS sustainability were identified and encapsulated into a conceptual framework to coordinate a systematic IBS decision making approach. Five categories were used to separate the critical factors into: ecological performance; economic value; social equity and culture; technical quality; and implementation and enforcement. This categorisation extends the "Triple Bottom Lines" to include social, economic, environmental and institutional dimensions. Semi-structured interviews help identify strategies of actions and solutions of potential problems through a SWOT analysis framework. These tools help the decision-makers maximise the opportunities by using available strengths, avoid weaknesses, and diagnose possible threats in the examined issues. The recommendations formed an integrated action plan to present information on what and how to improve sustainability through tackling each critical factor during IBS development. It can be used as part of the project briefing documents for IBS designers. For validation and finalisation the research deliverables, three case studies were conducted. The research fills a current gap by responding to IBS project scenarios in developing countries. It also provides a balanced view for designers to better understand sustainability potential and prioritize attentions to manage sustainability issues in IBS applications.
Resumo:
Construction works are project-based and interdisciplinary. Many construction management (CM) problems are ill defined. The knowledge required to address such problems is not readily available and mostly tacit in nature. Moreover, the researchers, especially the students in the higher education, often face difficulty in defining the research problem, adopting an appropriate research process and methodology for designing and validating their research. This paper describes a ‘Horseshoe’ research process approach and its application to address a research problem of extracting construction-relevant information from a building information model (BIM). It describes the different steps of the process for understanding a problem, formulating appropriate research question/s, defining different research tasks, including a methodology for developing, implementing and validating the research. It is argued that a structure research approach and the use of mixed research methods would provide a sound basis for research design and validation in order to make contribution to existing knowledge.
Resumo:
The skill shortage issues have long existed in the construction industry in countries like Australia. Couple this with the lead and lag time between market demand and resultant supply has traditionally seen cyclical fluctuation of skills demand within the construction industry. Skills demand and shortages are generally well documented and can even have a level of predictability in Australia given the tendency to have a delayed reaction to global economic downturns. Sustainability issues in the construction industry have attracted growing public awareness. Traditionally driven by ever increasing, if only gradual, mandated minimum requirements, drive towards sustainable developments is now increasingly being created by the client. As this demand increases, accordingly a demand for people with the skills to provide these services should be felt. This research examines the green skill shortage issues within the context of construction industry. Stakeholders from across relevant sectors of the built environment were engaged to ascertain the industry’s utilisation and demand for ‘green skilled’ personnel. These findings will assist stakeholders within the construction industry in negating the effects of a skills shortage in the event of accelerated demand for sustainable construction.
Resumo:
Construction has been plagued with serious injuries and deaths for years. Although the technological advances have made the world safer and healthier, researchers have noted that some safety interventions, which had clear objective safety benefits, had failed to achieve the forecast savings in lives and injuries. The purpose of this study was to explore whether the construction workers show risk compensation and engage in greater risk taking when certain types of safety measures are implemented in the construction site. A case study approach was used to achieve the aim of this study. A typical construction site in Sydney was selected as the subject of the case study. Data were collected through direct observations, questionnaires and interviews. The findings confirm that workers show risk compensation behaviours in the construction environment. The risk compensation behaviours of workers varied with the level of experience and whether they have suffered from a past workplace injury. The findings of this study may offer a better understanding of workers’ behavioural patterns in construction environment and the effectiveness of safety interventions. The result of this study may provide supports for designing, implementing and evaluating safety interventions in construction site.
Resumo:
With unpredictable workloads and a need for a multitude of specialized skills, many main contractors rely heavily on subcontracting to reduce their risks (Bresnen et al., 1985; Beardsworth et al., 1988). This is especially the case In Hong Kong, where the average direct labour content accounts for only around 1% of the total contract sum (Lai, 1987). Extensive usage of subcontracting is also reported in many other countries, including the UK (Gray and Flanagan, 1989) and Japan (Bennett et al., 1987). In addition, and depending upon the scale and complexity of works, it is not uncommon for subcontractors to further sublet their works to lower tier(s) subcontractors. Richter and Mitchell (1982) argued that main contractors can obtain a higher profit margin by reducing their performance costs by subcontracting work to those who have the necessary resources to perform the work more efficiently and economically. Subcontracting is also used strategically to allow firms to employ a minimum work force under fluctuating demand (Usdiken and Sözen, 1985). Through subcontracting, the risks of main contractors are also reduced, as errors in estimating or additional costs caused by delays or extra labour requirements can be absorbed by the subcontractors involved (Woon and Ofori, 2000). Despite these benefits, the quality of work can suffer when incapable or inexperienced subcontractors are employed. Additional problems also exist in the form of bid shopping, unclear accountability, and high fragmentation (Palaneeswaran et al., 2002). A recent CIB TG 23 International Conference, October 2003, Hong Kong report produced by the Hong Kong Construction Industry Review Committee (CIRC) points to development of a framework to help distinguish between capable and incapable subcontractors (Tang, 2001). This paper describes research aims at identifying and prioritising criteria for use in such a framework.
Resumo:
Over the past 20 years there has been a considerable push at all three tiers of Government and private industry in Australia to improve the energy efficiency and sustainability levels of residential housing. A number of these initiatives have been voluntary, such as solar power and solar heating rebates, with other mandatory measures being incorporated into building standards and codes. Although the importance of energy efficiency and sustainable materials have been widely conveyed both at the academic and public level, it does not always reflect in the residential house purchase decision by typical house buyers, including residential property investors. This paper will analyse a range of housing markets in Brisbane to determine the investment performance of those markets over the past 3 years to determine any significant differences between new residential suburbs and older residential suburbs where houses have not been constructed to the current energy efficiency and sustainability guidelines. The range of suburbs to be analysed will focus on middle to lower high value suburbs, with a particular focus on residential housing in Master Planned Communities to determine if socio-economic factors and development size and scope have an impact of the purchase and investment performance of sustainable houses in comparison to older housing stock. The paper confirms that the residential property market shows a higher capital return for residential property built under stricter sustainability guidelines than similar located and type of property built prior to the BCA 2004 and older style project type homes erected prior to 2000.
Resumo:
GPV is a Chinese serotype isolate of barley yellow dwarf virus (BYDV) that has no reaction with antiserum of MAV, PAV, SGV, RPV and RMV The sequence of the coat protein (CP) of GPV isolate of BYDV was identified and its amino acid sequence was deduced. The coding region for the putative GPV CP is 603 bases nucleotides and encodes a Mr 22 218 (22 ku) protein. The same as MAV, PAV and RPV, GPV contained a second ORF within the coat protein coding region. This protein of 17 024 Mr (17 ku) is thought to correspond to the Virion protein genome linked (Vpg). Sequence comparisons of the CP coding region between the GPV isolate of BYDV and other isolates of BYDV have been done. The nucleotide and amino acid sequence homology of GPV has a greater identity to the sequence of RPV than those of PAV and MAV. The GPV CP sequence stored 83.7% of nucleotide similarity and 77.5% of deduced amino acid similarity, whereas that of the PAV and MAV shared 56.9%, 53.2% and 44.1%, 43.8% respectively. According to BYDV-GPV CP sequence, two primers were designed. The cDNA of CP was produced by RT-PCR. Full-length cDNA of CP was inserted into plasmid to construct expression plasmids named pPPI1, pPPI2 and pPPI5 based on different promoters. The recombinant plasmids were identified by using α-32P-dATP labelled CP probe, α-32P-ATP labelled GPV RNA probe and sequencing to confirm real GPV CP gene cDNA in plasmids.
Resumo:
Purpose Most barriers and enablers of sustainable projects are related to procurement. This study proposes a framework for evaluating green procurement practices throughout the lifecycle of road construction projects and demonstrates its application through an Australian case study. Design/methodology/approach The study is based on linking the phases of road construction with incentive mechanisms for proactively motivating behavioural change. A holistic view on utilised and potential incentives is attempted with a literature review and a state-of-practice review. The latter is based on interviews and 90 policy and procurement documents across five Australian states. Findings An evaluation framework with seven procurement stages is suggested to describe current state green procurement incentives throughout the delivery lifecycle of road construction projects. The Australian case study was found to provide useful data to identify gaps and strong points of the different states regarding their level of integration of sustainability and greenhouse gas emissions GHG) reduction elements in their procurement practices. This understanding was used to draw recommendations on future advancement of green procurement. Originality/value: Government entities across the globe can impact considerably the achievement of sustainability and GHG targets, by using their procurement practices and requirements to create incentives for contractors and suppliers to engage in more GHG conscious practices. The present study provides a systematic account of how green procurement practices can be underpinned using the Australian road construction industry as a case study, and distinguish between strong and weak links in the green procurement chain to draw recommendations for future initiatives.
Resumo:
In Australia, collaborative contracts, and in particular, project alliances, have been increasingly used to govern infrastructure projects. These contracts use formal and informal governance mechanisms to manage the delivery of infrastructure projects. Formal mechanisms such as financial risk sharing are specified in the contract, while informal mechanisms such as integrated teams are not. Given that the literature contains a multiplicity of often untestable definitions, this paper reports on a review of the literature to operationalize the concepts of formal and informal governance. This work is the first phase of a study that will examine the optimal balance of formal and informal governance structures. Desk-top review of leading journals in the areas of construction management and business management, as well as recent government documents and industry guidelines, was undertaken to to conceptualise and operationalize formal and informal governance mechanisms. The study primarily draws on transaction-cost economics (e.g. Williamson 1979; Williamson 1991), relational contract theory (Feinman 2000; Macneil 2000) and social psychology theory (e.g. Gulati 1995). Content analysis of the literature was undertaken to identify key governance mechanisms. Content analysis is a commonly used methodology in the social sciences area. It provides rich data through the systematic and objective review of literature (Krippendorff 2004). NVivo 9, a qualitative data analysis software package, was used to assist in this process. A previous study by the authors identified that formal governance mechanisms can be classified into seven measurable categories: (1) negotiated cost, (2) competitive cost, (3) commercial framework, (4) risk and reward sharing, (5) qualitative performance, (6) collaborative multi-party agreement, and (7) early contractor involvement. Similarly, informal governance mechanisms can be classified into four measureable categories: (1) leadership structure, (2) integrated team, (3) team workshops, and (4) joint management system. This paper explores and further defines the key operational characteristics of each mechanism category, highlighting its impact on value for money in alliance project delivery. The paper’s contribution is that it provides the basis for future research to compare the impact of a range of individual mechanisms within each category, as a means of improving the performance of construction projects.
Resumo:
Collaborative contracting has emerged over the past 15 years as an innovative project delivery framework that is particularly suited to infrastructure projects. Australia leads the world in the development of project and program alliance approaches to collaborative delivery. These approaches are considered to promise superior project results. However, very little is known about the learning routines that are most widely used in support of collaborative projects in general and alliance projects in particular. The literature on absorptive capacity and dynamic capabilities indicates that such learning enhances project performance. The learning routines employed at corporate level during the operation of collaborative infrastructure projects in Australia were examined through a large survey conducted in 2013. This paper presents a descriptive summary of the preliminary findings. The survey captured the experiences of 320 practitioners of collaborative construction projects, including public and private sector clients, contractors, consultants and suppliers (three per cent of projects were located in New Zealand, but for brevity’s sake the sample is referred to as Australian). The majority of projects identified used alliances (78.6%); whilst 9% used Early Contractor Involvement (ECI) contracts and 2.7% used Early Tender Involvement contracts, which are ‘slimmer’ types of collaborative contract. The remaining 9.7% of respondents used traditional contracts that employed some collaborative elements. The majority of projects were delivered for public sector clients (86.3%), and/or clients experienced with asset procurement (89.6%). All of the projects delivered infrastructure assets; one third in the road sector, one third in the water sector, one fifth in the rail sector, and the rest spread across energy, building and mining. Learning routines were explored within three interconnected phases: knowledge exploration, transformation and exploitation. The results show that explorative and exploitative learning routines were applied to a similar extent. Transformative routines were applied to a relatively low extent. It was also found that the most highly applied routine is ‘regularly applying new knowledge to collaborative projects’; and the least popular routine was ‘staff incentives to encourage information sharing about collaborative projects’. Future research planned by the authors will examine the impact of these routines on project performance.