1000 resultados para waiting point nuclei


Relevância:

20.00% 20.00%

Publicador:

Resumo:

The pathogenesis of infective endocarditis (IE) is being dissected at the molecular level, which should help redefine new preventive and therapeutic strategies against IE. In spite of improving health care, the incidence of IE has not decreased over the last decades. While classical predisposing conditions such as rheumatic heart disease were being eradicated, new features of IE have emerged. These include IE in intravenous drug users, IE in elderly patients with sclerotic valve disease, prosthetic valve IE and nosocomial IE. The epidemiology, pathogenesis, diagnosis, prevention and treatment of IE are being reviewed in this article.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The suitable timing of capacity investments is a remarkable issue especially in capital intensive industries. Despite its importance, fairly few studies have been published on the topic. In the present study models for the timing of capacity change in capital intensive industry are developed. The study considers mainly the optimal timing of single capacity changes. The review of earlier research describes connections between cost, capacity and timing literature, and empirical examples are used to describe the starting point of the study and to test the developed models. The study includes four models, which describe the timing question from different perspectives. The first model, which minimizes unit costs, has been built for capacity expansion and replacement situations. It is shown that the optimal timing of an investment can be presented with the capacity and cost advantage ratios. After the unit cost minimization model the view is extended to the direction of profit maximization. The second model states that early investments are preferable if the change of fixed costs is small compared to the change of the contribution margin. The third model is a numerical discounted cash flow model, which emphasizes the roles of start-up time, capacity utilization rate and value of waiting as drivers of the profitable timing of a project. The last model expands the view from project level to company level and connects the flexibility of assets and cost structures to the timing problem. The main results of the research are the solutions of the models and analysis or simulations done with the models. The relevance and applicability of the results are verified by evaluating the logic of the models and by numerical cases.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Yritykset ovat pakotettuja erilaisiin yhteistyömuotoihin pärjätäkseen kiristyvässä kilpailussa. Yhteistyösuhteet kulkevat eri nimillä riippuen teollisuuden alasta ja siitä, missä kohtaa toimitusketjua ne toteutuvat, mutta periaatteessa kaikki pohjautuvat samaan ideaan kuin Vendor Managed Inventory (VMI); varastoon jakysyntään liittyvä tieto jaetaan toimitusketjun eri osapuolien kesken, jotta tuotanto, jakelu ja varastonhallinta olisi mahdollista optimoida. Vendor Managed Inventory on ideana yksinkertainen, mutta vaatii onnistuakseen paljon. Perusolettamus on, että toimittajan on kyettävä hallinnoimaan asiakkaan varastoa paremmin kuin asiakas itse. Tämä ei kuitenkaan ole mahdollista ilman riittävää yhteistyötä, oikeanlaista informaatiota tai sopivia tuoteominaisuuksia. Tämän työn tarkoitus on esitellä kriittiset menestystekijät valmistajan kannalta, kun näkyvyys todelliseen kysyntään on heikko ja kyseessäolevat tuotteet ovat ominaisuuksiltaan toimintamalliin huonosti soveltuvia. VMItoimintamallin soveltuvuus matkapuhelimia valmistavan yrityksen liiketoimintaan, sekä sen vaikutus asiakasyhteistyöhön, kannattavuuteen ja toiminnan tehostamiseen on myös tutkittu.