954 resultados para mesocosm facility
Resumo:
Objective To compare mortality burden estimates based on direct measurement of levels and causes in communities with indirect estimates based on combining health facility cause-specific mortality structures with community measurement of mortality levels. Methods. Data from sentinel vital registration (SVR) with verbal autopsy (VA) were used to determine the cause-specific mortality burden at the community level in two areas of the United Republic of Tanzania. Proportional cause-specific mortality structures from health facilities were applied to counts of deaths obtained by SVR to produce modelled estimates. The burden was expressed in years of life lost. Findings. A total of 2884 deaths were recorded from health facilities and 2167 recorded from SVR/VAs. In the perinatal and neonatal age group cause-specific mortality rates were dominated by perinatal conditions and stillbirths in both the community and the facility data. The modelled estimates for chronic causes were very similar to those from SVR/VA. Acute febrile illnesses were coded more specifically in the facility data than in the VA. Injuries were more prevalent in the SVR/VA data than in that from the facilities. Conclusion. In this setting, improved International classification of diseases and health related problems, tenth revision (ICD-10) coding practices and applying facility-based cause structures to counts of deaths from communities, derived from SVR, appears to produce reasonable estimates of the cause-specific mortality burden in those aged 5 years and older determined directly from VA. For the perinatal and neonatal age group, VA appears to be required. Use of this approach in a nationally representative sample of facilities may produce reliable national estimates of the cause-specific mortality burden for leading causes of death in adults.
Resumo:
The work presented was conducted within the scope of a larger study investigating impacts of the Stuart Oil Shale project, a facility operating to the north of the industrial city of Gladstone, Australia. The aims of the investigations were threefold: (a) the identification of the plant signatures in terms of particle size distributions in the submicrometer range (13-830 nm) through stack measurements, (b) exploring the applicability of these signatures in tracing the source contributions at locations of interest, at a distance from the plant, and (c) assessing the contribution of the plant to the total particle number concentration at locations of interest. The stack measurements conducted for three different conditions of plant operation showed that the particle size distributions were bimodal with average modal count median diameters (CMDs) of 24 (SD 4) and 52 (SD 9) nm. The average of all the particle size distributions recorded within the plant sector at a site located 4.5 km from the plant, over the sampling period when the plant was operating, also showed a bimodal distribution. The modal CMDs in this case were 27 and 50 nm, similar to those at the stack. This bimodal size distribution is distinct from the size distribution of the most common ambient anthropogenic emission source, which is vehicle emissions, and can be considered as a signature of this source. The average contribution of the plant (for plant sector winds) was estimated to be (10.0 +/- 3.8) x 10(2) particles cm(-3) and constituted approximately a 50% increase over the local particle ambient concentration for plant sector winds. This increase in particle number concentration compared to the local background concentration, while high compared to the clean environment concentration, is not significant when compared to concentrations generally encountered in the urban environment of Brisbane.
Resumo:
Purpose – The purpose of the paper is to present the findings of a study of factory closure management. It details the sequence and the results of the key strategic manufacturing management decisions made from the time of the announcement of the plant closure to the cessation of operations. The paper also includes an analysis of the human resource management (HRM) actions taken during this same time period and their consequences upon all those involved in the closure management process. Design/methodology/approach – The case study methodology consisted of two initial site visits to monitor closure management effectiveness (adherence to plan and the types and frequency of closure management communications). During these visits, documentary evidence of the impact of the closure decision upon production performance was also collected (manufacturing output and quality performance data). Following plant closure, interviews were held with senior business, production and HRM managers and production personnel. A total of 12 interviews were carried out. Findings – The case study findings have informed the development of a conceptual model of facility closure management. Information obtained from the interviews suggests that the facility closure management process consists of five key management activities. The unexpected announcement of a factory closure can cause behavioural changes similar to those of bereavement, particularly by those employees who are its survivors. In addition, similar reactions to the closure announcement may be displayed by those who choose to remain employed by the factory owner throughout the phased closure of the plant. Originality/value – Facility closure management is an insufficiently researched strategic operations management activity. This paper details a recommended procedure for its management. A conceptual model has also been developed to illustrate the links between the key facility closure management tasks and the range of employee changes of behaviour that can be induced by their execution.
Resumo:
A discrete event simulation model was developed and used to estimate the storage area required for a proposed overseas textile manufacturing facility. It was found that the simulation was able to achieve this because of its ability to both store attribute values and to show queuing levels at an individual product level. It was also found that the process of undertaking the simulation project initiated useful discussions regarding the operation of the facility. Discrete event simulation is shown to be much more than an exercise in quantitative analysis of results and an important task of the simulation project manager is to initiate a debate among decision makers regarding the assumptions of how the system operates.