Resumo:
Current recipes for learning across business sectors too often fail to recognize the embedded and contextual nature of management practice. The existing literature gives little emphasis to the symbiotic relationship between supply chain management and the broader dynamics of context. The aerospace and construction sectors are selected for comparison on the basis that they are so different. The UK aerospace sector has undergone extensive consolidation as a result of the imperatives of global competitive pressures. In contrast, the construction industry has experienced decades of fragmentation and remains highly localized. An increasing proportion of output in the aerospace sector occurs within a small number of large, globally orientated firms. In contrast, construction output is dominated by a plethora of small firms with high levels of subcontracting and a widespread reliance on self-employment. These differences have fundamental implications for the way that supply chain management is understood and implemented in the two sectors. Semi-structured interviews with practitioners from both sectors support the contention that supply chain management is more established in aerospace than construction. The introduction of prime contracting and the increasing use of framework agreements within the construction sector potentially provide a much more supportive climate for supply chain management than has traditionally prevailed. However, progress depends upon an improved continuity of workload under such arrangements.
Resumo:
Firms form consortia in order to win contracts. Once a project has been awarded to a consortium each member then concentrates on his or her own contract with the client. Therefore, consortia are marketing devices, which present the impression of teamworking, but the production process is just as fragmented as under conventional procurement methods. In this way, the consortium forms a barrier between the client and the actual construction production process. Firms form consortia, not as a simple development of normal ways of working, but because the circumstances for specific projects make it a necessary vehicle. These circumstances include projects that are too large or too complex to undertake alone or projects that require on-going services which cannot be provided by the individual firms inhouse. It is not a preferred way of working, because participants carry extra risk in the form of liability for the actions of their partners in the consortium. The behaviour of members of consortia is determined by their relative power, based on several factors, including financial commitment and ease of replacement. The level of supply chain visibility to the public sector client and to the industry is reduced by the existence of a consortium because the consortium forms an additional obstacle between the client and the firms undertaking the actual construction work. Supply chain visibility matters to the client who otherwise loses control over the process of construction or service provision, while remaining accountable for cost overruns. To overcome this separation there is a convincing argument in favour of adopting the approach put forward in the Project Partnering Contract 2000 (PPC2000) Agreement. Members of consortia do not necessarily go on to work in the same consortia again because members need to respond flexibly to opportunities as and when they arise. Decision-making processes within consortia tend to be on an ad hoc basis. Construction risk is taken by the contractor and the construction supply chain but the reputational risk is carried by all the firms associated with a consortium. There is a wide variation in the manner that consortia are formed, determined by the individual circumstances of each project; its requirements, size and complexity, and the attitude of individual project leaders. However, there are a number of close working relationships based on generic models of consortia-like arrangements for the purpose of building production, such as the Housing Corporation Guidance Notes and the PPC2000.
Resumo:
In developing techniques for monitoring the costs associated with different procurement routes, the central task is disentangling the various project costs incurred by organizations taking part in construction projects. While all firms are familiar with the need to analyse their own costs, it is unusual to apply the same kind of analysis to projects. The purpose of this research is to examine the claims that new, ways of working such as strategic alliancing and partnering bring positive business benefits. This requires that costs associated with marketing, estimating, pricing, negotiation of terms, monitoring of performance and enforcement of contract are collected for a cross-section of projects under differing arrangements, and from those in the supply, chain from clients to consultants, contractors, subcontractors and suppliers. Collaboration with industrial partners forms the basis for developing a research instrument, bused on time sheets, which will be relevant for all those taking part in the work. The signs are that costs associated with,with tendering are highly variable, 1-15%, depending upon what precisely, is taken into account. The research to date reveals that there are mechanisms for measuring the costs of transactions and these will generate useful data for subsequent analysis.
Resumo:
FIDIC has over the years produced standard forms of contracts for the international procurement of projects. A source of continuing criticism of its Red Book concerns the duality in the traditional role of the engineer as the employer's agent and as an independent third party holding the balance fairly between the employer and the contractor. In response to this and other criticisms FIDIC produced a replacement for it in 1999. The role of the engineer under the new Red Book is critically examined in the light of relevant case law, expert commentaries and feedback from two multidisciplinary workshops with international participation. The examination identified three major changes: (1) a duty to act impartially has been replaced by a duty to make fair determination of certain matters; (2) it is open to parties to allow greater control of the engineer by the employer by stating in the appropriate part of the contract powers the engineer must not exercise without the employer's approval; (3) there is provision for a Dispute Adjudication Board (DAB) to which disputes may be referred. Although the duality has not been eliminated completely, the contract is structured flexibly enough to support those who wish to contract on the basis of the engineer acting solely as the agent of the employer.
Resumo:
The method of distributing the outdoor air in classrooms has a major impact on indoor air quality and thermal comfort of pupils. In a previous study, ([11] Karimipanah T, Sandberg M, Awbi HB. A comparative study of different air distribution systems in a classroom. In: Proceedings of Roomvent 2000, vol. II, Reading, UK, 2000. p. 1013-18; [13] Karimipanah T, Sandberg M, Awbi HB, Blomqvist C. Effectiveness of confluent jets ventilation system for classrooms. In: Idoor Air 2005, Beijing, China, 2005 (to be presented).) presented results for four and two types of air distribution systems tested in a purpose built classroom with simulated occupancy as well as computational fluid dynamics (CFD) modelling. In this paper, the same experimental setup has been used to investigate the indoor environment in the classroom using confluent jet ventilation, see also ([12]Cho YJ, Awbi HB, Karimipanah T. The characteristics of wall confluent jets for ventilated enclosures. In: Proceedings of Roomvent 2004, Coimbra, Portugal, 2004.) Measurements of air speed, air temperature and tracer gas concentrations have been carried out for different thermal conditions. In addition, 56 cases of CFD simulations have been carried to provide additional information on the indoor air quality and comfort conditions throughout the classroom, such as ventilation effectiveness, air exchange effectiveness, effect of flow rate, effect of radiation, effect of supply temperature, etc., and these are compared with measured data.
Resumo:
In the tender process, contractors often rely on subcontract and supply enquiries to calculate their bid prices. However, this integral part of the bidding process is not empirically articulated in the literature. Over 30 published materials on the tendering process of contractors that talk about enquiries were reviewed and found to be based mainly on experiential knowledge rather than systematic evidence. The empirical research here helps to describe the process of enquiries precisely, improve it in practice, and have some basis to support it in theory. Using a live participant observation case study approach, the whole tender process was shadowed in the offices of two of the top 20 UK civil engineering construction firms. This helped to investigate 15 research questions on how contractors enquire and obtain prices from subcontractors and suppliers. Forty-three subcontract enquiries and 18 supply enquiries were made across two different projects with average value of 7m. An average of 15 subcontract packages and seven supply packages was involved. Thus, two or three subcontractors or suppliers were invited to bid in each package. All enquiries were formulated by the estimator, with occasional involvement of three other personnel. Most subcontract prices were received in an average of 14 working days; and supply prices took five days. The findings show 10 main activities involved in processing enquiries and their durations, as well as wasteful practices associated with enquiries. Contractors should limit their enquiry invitations to a maximum of three per package, and optimize the waiting time for quotations in order to improve cost efficiency.
Resumo:
The construction industry has incurred a considerable amount of waste as a result of poor logistics supply chain network management. Therefore, managing logistics in the construction industry is critical. An effective logistic system ensures delivery of the right products and services to the right players at the right time while minimising costs and rewarding all sectors based on value added to the supply chain. This paper reports on an on-going research study on the concept of context-aware services delivery in the construction project supply chain logistics. As part of the emerging wireless technologies, an Intelligent Wireless Web (IWW) using context-aware computing capability represents the next generation ICT application to construction-logistics management. This intelligent system has the potential of serving and improving the construction logistics through access to context-specific data, information and services. Existing mobile communication deployments in the construction industry rely on static modes of information delivery and do not take into account the worker’s changing context and dynamic project conditions. The major problems in these applications are lack of context-specificity in the distribution of information, services and other project resources, and lack of cohesion with the existing desktop based ICT infrastructure. The research works focus on identifying the context dimension such as user context, environmental context and project context, selection of technologies to capture context-parameters such wireless sensors and RFID, selection of supporting technologies such as wireless communication, Semantic Web, Web Services, agents, etc. The process of integration of Context-Aware Computing and Web-Services to facilitate the creation of intelligent collaboration environment for managing construction logistics will take into account all the necessary critical parameters such as storage, transportation, distribution, assembly, etc. within off and on-site project.
Resumo:
Purpose – The purpose of this paper is to focus on the Fédération Internationale des Ingénieurs-Conseils (FIDIC) White Book standard form of building contract. It tracks the changes to this contract over its four editions, and seeks to identify their underlying causes. Design/methodology/approach – The changes made to the White Book are quantified using a specific type of quantitative content analysis. The amended clauses are then examined to understand the nature of the changes made. Findings – The length of the contract increased by 34 per cent between 1990 and 2006. A large proportion of the overall increase can be attributed to the clauses dealing with “conflict of interest/corruption” and “dispute resolution”. In both instances, the FIDIC drafting committees have responded to international developments to discourage corruption, and to encourage the use of alternative dispute resolution. Between 1998 and 2006, the average length of the sentences increased slightly, raising the question of whether long sentences are easily understood by users of contracts. Research limitations/implications – Quantification of text appears to be particularly useful for the analysis of documents which are regularly updated because changes can be clearly identified and the length of sentences can be determined, leading to conclusions about the readability of the text. However, caution is needed because changes of great relevance can be made to contract clauses without actually affecting their length. Practical implications – The paper will be instructive for contract drafters and informative for users of FIDIC's White Book. Originality/value – Quantifying text has been rarely used regarding standard-form contracts in the field of construction.
Resumo:
This paper extends the build-operate-transfer (BOT) concession model (BOTCcM) to a new method for identifying a concession period by using bargaining-game theory. Concession period is one of the most important decision variables in arranging a BOT-type contract, and there are few methodologies available for helping to determine the value of this variable. The BOTCcM presents an alternative method by which a group of concession period solutions are produced. Nevertheless, a typical weakness in using BOTCcM is that the model cannot recommend a specific time span for concessionary. This paper introduces a new method called BOT bargaining concession model (BOTBaC) to enable the identification of a specific concession period, which takes into account the bargaining behavior of the two parties concerned in engaging a BOT contract, namely, the investor and the government concerned. The application of BOTBaC is demonstrated through using an example case.