888 resultados para Multinational Contractors


Relevância:

10.00% 10.00%

Publicador:

Resumo:

This report presents the results of the largest and most comprehensive study to date on portland cement pervious concrete (PCPC). It is designed to be widely accessible and easily applied by designers, producers, contractors, and owners. The project was designed to begin with pervious concrete best practices and then to address the unanswered questions in a systematic fashion to allow a successful overlay project. Consequently, the first portion of the integrated project involved a combination of fundamental material property investigations, test method development, and addressing constructability issues before actual construction could take place. The second portion of the project involved actual construction and long-term testing before reporting successes, failures, and lessons learned. The results of the studies conducted show that a pervious concrete overlay can be designed, constructed, operated, and maintained. A pervious concrete overlay has several inherent advantages, including reduced splash and spray and reduced hydroplaning potential, as well as being a very quiet pavement. The good performance of this overlay in a particularly harsh freeze-thaw climate, Minnesota, shows pervious concrete is durable and can be successfully used in freeze-thaw climates with truck traffic and heavy snow plowing.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

This phase of the electronic collaboration project involved two major efforts: 1) implementation of AEC Sync (formerly known as Attolist), a web-based project management system (WPMS), on the Broadway Viaduct Bridge Project and the Iowa Falls Arch Bridge Project and 2) development of a web-based project management system for bridge and highway construction projects with less than $10 million in contract value. During the previous phase of this project (fiscal year 2010), the research team helped with the implementation process for AEC Sync and collected feedback from the Broadway Viaduct project team members before the start of the project. During the 2011 fiscal year, the research team collected the post-project surveys from the Broadway Viaduct project members and compared them to the pre-project survey results. The results of the AEC Sync implementation on the Broadway project were positive. The project members were satisfied with the performance of the AEC Sync software and how it facilitated document management and its transparency. In addition, the research team distributed, collected, and analyzed the pre-project surveys for the Iowa Falls Arch Bridge Project. The implementation of AEC Sync for the Iowa Falls Arch Bridge Project appears to also be positive, based on the pre-project surveys. The fourth phase of this electronic collaboration project involves the identification and implementation of a WPMS solution for smaller bridge and highway projects. The workflow for the shop drawing approval process for sign truss projects was documented and used to identify possible WPMS solutions. After testing and evaluating several WPMS solutions, Microsoft SharePoint Foundation’s site pages were selected to be pilot-tested on sign truss projects. Due to the limitation on the SharePoint license that the Iowa Department of Transportation (DOT) has, a file transfer protocol (FTP) site will be developed alongside this site to allow contractors to upload shop drawings to the Iowa DOT. The SharePoint site pages are expected to be ready for implementation during the 2012 calendar year.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The Plinius Maior Society is a European multinational, multidisciplinary group of clinicians and researchers in the alcoholism field, which strives for a comprehensive care concept in the management of alcoholism and alcohol-related problems. The Society, using evidence-based medicine, has developed a set of protocols, in the forms of guidelines, flow-charts, leaflets and booklets, for use as tools in research on and treatment of alcohol dependence, with a view to standardize clinical research procedures and to bridge the gap between the alcoholism researcher, practitioner and patient. These protocols or tools have been subjected to a review process during their preparation, and further comments on their validity will be integrated in their updates. Seven protocols have so far been developed, two of which, 'Guidelines on Evaluation of Treatment of Alcohol Dependence' and 'Detection and Management of Patients with Psychiatric and Alcohol Use Disorders', are aimed at the clinical researcher and specialists, whereas three others [in the form of decision trees (flow-charts)] are aimed at the general practitioner and other primary health care providers. These are entitled 'Alcohol Risk Assessment and Intervention in Primary Care', 'Withdrawal from Alcohol at Home' and 'Brief Intervention in Patients with Alcohol-Related Problems'. The remaining two tools are booklets aimed at the patient, one to support initiatives for detection of drinking problems and primary intervention, namely 'Do you have this Problem? Discuss it with your Doctor!', and the other to assist the patient in relapse prevention after the early stages of treatment, namely 'On the Way to Recovery'. The protocols for the general practitioners and patients have so far been produced in seven European languages, and, as with the Guidelines, feedback from target users will be collected and incorporated in future updates. The Society continually seeks to consider areas of clinical importance for its work and, as it enters the new millennium, it hopes to address and make a significant contribution to the most pressing problem in the management of alcohol dependence, namely relapse.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

BACKGROUND AND OBJECTIVES: The SBP values to be achieved by antihypertensive therapy in order to maximize reduction of cardiovascular outcomes are unknown; neither is it clear whether in patients with a previous cardiovascular event, the optimal values are lower than in the low-to-moderate risk hypertensive patients, or a more cautious blood pressure (BP) reduction should be obtained. Because of the uncertainty whether 'the lower the better' or the 'J-curve' hypothesis is correct, the European Society of Hypertension and the Chinese Hypertension League have promoted a randomized trial comparing antihypertensive treatment strategies aiming at three different SBP targets in hypertensive patients with a recent stroke or transient ischaemic attack. As the optimal level of low-density lipoprotein cholesterol (LDL-C) level is also unknown in these patients, LDL-C-lowering has been included in the design. PROTOCOL DESIGN: The European Society of Hypertension-Chinese Hypertension League Stroke in Hypertension Optimal Treatment trial is a prospective multinational, randomized trial with a 3 × 2 factorial design comparing: three different SBP targets (1, <145-135; 2, <135-125; 3, <125 mmHg); two different LDL-C targets (target A, 2.8-1.8; target B, <1.8 mmol/l). The trial is to be conducted on 7500 patients aged at least 65 years (2500 in Europe, 5000 in China) with hypertension and a stroke or transient ischaemic attack 1-6 months before randomization. Antihypertensive and statin treatments will be initiated or modified using suitable registered agents chosen by the investigators, in order to maintain patients within the randomized SBP and LDL-C windows. All patients will be followed up every 3 months for BP and every 6 months for LDL-C. Ambulatory BP will be measured yearly. OUTCOMES: Primary outcome is time to stroke (fatal and non-fatal). Important secondary outcomes are: time to first major cardiovascular event; cognitive decline (Montreal Cognitive Assessment) and dementia. All major outcomes will be adjudicated by committees blind to randomized allocation. A Data and Safety Monitoring Board has open access to data and can recommend trial interruption for safety. SAMPLE SIZE CALCULATION: It has been calculated that 925 patients would reach the primary outcome after a mean 4-year follow-up, and this should provide at least 80% power to detect a 25% stroke difference between SBP targets and a 20% difference between LDL-C targets.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Research project HR-219 was sponsored by the Iowa Highway Research Board and the Iowa Department of Transportation. The funding authorized from the Primary Road Research Fund was $11,200. The author wishes to express his appreciation to Iowa DOT personnel for their participation in the research. The special features were incorporated into the plans by Road Design personnel. Office of Materials personnel developed the proportions for the flowable mortar. Project inspection was provided by the Creston Resident Engineer and his staff. The excellent cooperation of the contractors contributed to the success of the research. The prime contractor was Irving F. Jensen Company, Inc. of Sioux City, Iowa who retained Reilly Construction Company of Ossian, Iowa and GNA Concrete, Inc. of Grimes, Iowa as subcontractors for the special culvert backfilling.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Cet article traite des entreprises militaires et de sécurité privées (EMSP) fournissant des services qui jusque lors étaient dévolus aux armées nationales. Malgré les nombreux incidents entraînant des violations des droits de l'homme, ces contractors ne sont que rarement poursuivis et sanctionnés. Les EMSP opèrent-elles dès lors dans un vide juridique où elles peuvent agir en toute impunité ? Qui peut être tenu pour responsable de leurs actes ? Cet article part du principe que les activités des EMSP sont rendues possibles grâce à l'assentiment ou l'absence de réprobation des Etats, et donc que la question de la responsabilité pour les actes des EMSP est également celle de la responsabilité de l'Etat. Il convient donc d'analyser les règles sur la responsabilité de l'Etat pour fait internationalement illicite et surtout les obligations positives des Etats découlant des principaux instruments internationaux et régionaux de protection des droits de l'homme. L'enjeu est de démontrer qu'un Etat ne peut pas s'exonérer de sa responsabilité en délégant ses fonctions gouvernementales à des organismes privés.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

After some success with a small asphalt pavement recycling project in 1975, Kossuth County, Iowa programmed a much larger undertaking during the 1976 construction season. The work performed in 1975 indicated that a quality product could be produced with some modifications to conventional equipment. As anticipated , the major problem encountered was the excessive air pollution created during the heating and mixing process. As part of its 1976 road program, Kossuth County developed plans for recycling sixteen miles of existing asphalt pavements using the "hot mix" recycling process. One project, ten miles in length, was selected by the Federal Highway Authority as part of "Demonstration Project No. 39, Recycling Asphalt Pavements." The FHWA provided a $29,500 grant t o the project to be used for project testing and evaluation. Cooperation and input into the work proposed for 1976 was received from many sources. The people and organizations contributing were the Federal Highway Authority, the Iowa Department of Environmental Quality, the Federal Environmental Protection Agency, several contractors, and personnel from the Kossuth County Engineer's Office.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Five Seasons Transportation & Parking (FSTP) and the Johnson County Council of Governments (JCCOG) are interested in evaluating the feasibility of prospective passenger rail service(s) that would operate over existing trackage of the Cedar Rapids and Iowa City Railway Company (CRANDIC), seen below left, and/or the Iowa Interstate Railroad System (IAIS), seen below right, connecting Cedar Rapids, Iowa City and the Amana Colonies. To perform the study, FSTP and JCCOG selected R.L. Banks & Associates, Inc. (RLBA) as Prime Contractors, HNTB Corporation (HNTB) and Snyder & Associates, Inc. (Snyder) as Subcontractors, hereafter Consultant Team. Both railroads participated in the study and contributed time and resources, as did many local government and civic organizations. The purpose of the study is to determine whether it is feasible to establish regularly scheduled passenger rail service and/or special event excursion rail service, in conjunction with the Five Seasons Transit system, Iowa City Transit, East Central Iowa Transit, Coralville Transit and the University of Iowa CAMBUS.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The following data was derived from 1391 reports of participating contractors for the annual 2002 through 2011 reporting periods. The workforce data is reflective of one peak work week for highway contractors during the most active time of the season, the last full week of July. The summary data on pages 4 and 5 was compiled by Iowa DOT staff from the 1391 reports received. Interesting changes and trends have been addressed in the written analysis.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

A pilot study was conducted on the premature failures of neoprene strip seals in expansion joints in Iowa bridges. In a relatively large number of bridges, strip seals have pulled out of the steel extrusions or otherwise failed well before the expected life span of the seal. The most serious consequence of a strip-seal failure is damage to the bridge substructure due to salt, water, and debris interacting with the substructure. A literature review was performed. Manufacturers’ specifications and recommendations, practices in the states bordering Iowa, and Iowa DOT design and installation guidelines were reviewed. Discussions were held with bridge contractors and the installation of a strip seal system was observed. Iowa DOT bridge databases were analyzed. A national survey was conducted on the use and performance of strip seals. With guidance from the Iowa DOT, twelve in-service bridges with strip-seal expansion joints were selected for detailed investigation. Effective bridge temperatures and corresponding expansion-joint openings were measured, DOT inspection reports were reviewed, and likely cause(s) of premature failures of strip seals were proposed. All of the seals used in the twelve bridges that had the most serious failures were in concrete girder bridges. Experimental results show that for a majority of these serious failures, the joint opening at 0° F predicted by the Iowa DOT design equations, the joint opening at 0° F extrapolated from the experimental data, or both, are larger than the movement rating of the strip seal specified on the bridge plans. Other likely causes of premature failures of seals in the twelve bridges include debris and ice in the seal cavity, a large skew and the corresponding decrease in the movement rating of the seal, improper installation, and improper setting of the initial gap.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

This report provides a summary of the updates to the traffic signal content within the Iowa Statewide Urban Design and Specifications (SUDAS) Design Manual Chapter 13 and Standard Specifications Division 8. Major focal points included pole footing design, cabinets and controllers, monitoring systems, communications systems, and figure updates. This work was completed through a project task force with a variety of participants (contractors, Iowa Department of Transportation, city traffic engineers, consultant, vendors, and University research and support staff).

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The implementation of warm-mix asphalt (WMA) is becoming more widespread with a growing number of contractors utilizing various WMA technologies. Early research suggests WMA may be more susceptible to moisture damage than traditional hot-mix asphalt (HMA) mixes. The objectives of this study are to test the binder and mix properties of WMA technologies for both field- and laboratory-produced mixes to determine the performance of WMA compared to traditional HMA. Field- and laboratory-produced mixes were studied. The laboratory-produced mixes compared HMA control mixes with WMA mixes that had the same mix design. The WMA technologies used for the laboratory study were Advera, Sasobit, and Evotherm. The field study tested four WMA field-produced mixes. Each of the four mixes had a corresponding control HMA mix. The WMA technologies used in the field study included: Evotherm 3G/Revix, Sasobit, and Double Barrel Green Foaming. The three main factors for this study were WMA/HMA, moisture-conditioned/not moisture-conditioned, and reheated/not reheated. Mixes were evaluated based on performance tests. Binder testing was performed to determine the rheological differences between HMA and WMA binders to determine if binder grade requirements change with the addition of WMA additives. The conclusions of this study are as follows:  Reduced mixing and compaction temperatures were achieved.  Statistical differences were found when comparing tensile strength ratio (TSR) values for both laboratory- and field-produced mixes. In the laboratory, none of the WMA additives performed as well as the HMA. For the field mixes, all TSR values passed Iowa’s minimum specification of 0.8 but, on average, WMA is lower compared to HMA TSR values.  Dynamic modulus results show that, on average, HMA will have higher dynamic modulus values. This means the HMA exhibits stiffer material properties compared to WMA; this may not necessarily mean superior performance in all cases.  Flow number results show that WMA has reduced flow number values compared to HMA. The only exception was the fourth field mix and weather delayed production of the control mix by nine days. The laboratory mixes showed that flow number values increased significantly with the addition of recycled asphalt pavement (RAP).  In the laboratory study, Advera reduced TSR values. Given that Advera is a foaming agent, the increase in moisture susceptibility is likely attributed to the release of water necessary for the improvement of the workability of the asphalt mixture.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Este trabajo analiza el impacto de las patentes en la dinámica de introducción de nuevos medicamentos en diferentes mercados nacionales. El estudio de un conjunto de mercados de medicamentos contra el VIH/SIDA en una muestra de países en desarrollo indica que las patentes sólo aceleran significativamente la introducción de los nuevos medicamentos después de que hayan pasado entre 1 y 4 años desde su lanzamiento mundial. Las patentes impiden que se introduzcan copias locales de los nuevos medicamentos comercializados por las grandes multinacionales, y la falta de competencia y los mayores precios de introducción resultantes ofrece a las multinacionales mayores ingresos en la comercialización de nuevos medicamentos mientras dura la patente. Sin embargo, el incentivo económico que debería acelerar la disponibilidad de nuevos medicamentos parece operar con cierto retraso

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Ventilator-associated pneumonia (VAP) affects mortality, morbidity and cost of critical care. Reliable risk estimation might improve end-of-life decisions, resource allocation and outcome. Several scoring systems for survival prediction have been established and optimised over the last decades. Recently, new biomarkers have gained interest in the prognostic field. We assessed whether midregional pro-atrial natriuretic peptide (MR-proANP) and procalcitonin (PCT) improve the predictive value of the Simplified Acute Physiologic Score (SAPS) II and Sequential Related Organ Failure Assessment (SOFA) in VAP. Specified end-points of a prospective multinational trial including 101 patients with VAP were analysed. Death &lt;28 days after VAP onset was the primary end-point. MR-proANP and PCT were elevated at the onset of VAP in nonsurvivors compared with survivors (p = 0.003 and p = 0.017, respectively) and their slope of decline differed significantly (p = 0.018 and p = 0.039, respectively). Patients with the highest MR-proANP quartile at VAP onset were at increased risk for death (log rank p = 0.013). In a logistic regression model, MR-proANP was identified as the best predictor of survival. Adding MR-proANP and PCT to SAPS II and SOFA improved their predictive properties (area under the curve 0.895 and 0.880). We conclude that the combination of two biomarkers, MR-proANP and PCT, improve survival prediction of clinical severity scores in VAP.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The MIT-Scan-T2 device is marketed as a non-destructive way to determine pavement thickness on both HMA and PCC pavements. PCC pavement thickness determination is an important incentivedisincentive measurement for the Iowa DOT and contractors. The thickness incentive can be as much as 3% of the concrete contact unit price and the disincentive can be as severe as remove and replace. This study evaluated the potential of the MIT device for PCC pavement thickness quality assurance. The limited testing indicates the unit is sufficiently repeatable and accurate enough to replace core drilling as the thickness measurement method. Further study is needed to statistically establish the single user and multi-user/device precision as well as establish an appropriate sampling protocol and PWL specification.