879 resultados para Multi-criteria Evaluation
Resumo:
Iowa's public road system of 112,000 miles is one of the largest and the best in the nation. It represents a considerable financial investment of taxpayer revenues over the years. And, it requires a sustained investment to preserve an economical level of transport service into the future. In 1982, a Governor's Blue Ribbon Transportation Task Force evaluated the effectiveness of Iowa's entire transportation system. Four important Task Force recommendations dealt with public road administrative issues in Iowa. These issues were related to: (1) Design criteria and levels of maintenance; (2) Consistency in the use of standards among jurisdictions; (3) Consolidation of maintenance operations at one jurisdiction level; and (4) Jurisdicational authority for roads; The issues formed the background for Research Project HR-265.
Resumo:
In this study we propose an evaluation of the angular effects altering the spectral response of the land-cover over multi-angle remote sensing image acquisitions. The shift in the statistical distribution of the pixels observed in an in-track sequence of WorldView-2 images is analyzed by means of a kernel-based measure of distance between probability distributions. Afterwards, the portability of supervised classifiers across the sequence is investigated by looking at the evolution of the classification accuracy with respect to the changing observation angle. In this context, the efficiency of various physically and statistically based preprocessing methods in obtaining angle-invariant data spaces is compared and possible synergies are discussed.
Resumo:
Bipolar affective disorder (BD) is a severe, recurrent and disabling disorder with devastating consequences for individuals, families and society. Although these hazards and costs provide a compelling rationale for development of early detection and early intervention strategies in BD, the development of at-risk criteria for first episode mania is still in an early stage of development. In this paper we review the literature with respect to the clinical, neuroantomical and neuropsychological data, which support this goal. We also describe our recently developed bipolar at-risk criteria (BAR). This criteria comprises the peak age range of the first onset of bipolar disorder, genetic risk, presenting with sub-threshold mania, cyclothymic features or depressive symptoms. An initial pilot evaluation of the BAR criteria in 22 subjects indicated conversion rates to proxies of first-episode mania of 23% within 265 days on average, and high specificity and sensitivity of the criteria. If prospective studies confirm the validity of the BAR criteria, then the criteria would have the potential to open up new avenues of research for indicated prevention in BD and might therefore offer opportunities to ameliorate the severity of, or even prevent BD.
Resumo:
The use of lightweight aggregates in prestressed concrete is becoming more of a reality as our design criteria become more demanding. Bridge girders of greater lengths have been restricted from travel on many of our highways because the weight of the combined girders and transporting vehicle is excessive making hauls of any distance prohibitive. This, along with new safety recommendations, prompted the State of Iowa to investigate the use of lightweight aggregate bridge girders. A series of three projects was started to investigate the possibility of using lightweight aggregate in prestressed concrete. The object of this project is to study the effect which lightweight aggregate concrete has on the camber of bridge girders when used in a field situation.
Resumo:
The purpose of this research project is to determine if (1) epoxy lane markings will last an entire winter season without replacement, (2) epoxy lane marking is an economical alternative to standard paint on high-traffic multi-lane roadways where lane changing is frequent, and (3) there are worthwhile benefits derived from thorough cleaning of the pavement surface before painting. The success of epoxy lane marking depends on the success of the equipment with which it is mixed and applied. The epoxy lane marking material, if properly mixed and placed on a clean surface, has the durability required to withstand a high traffic volume and frequent lane changes for at least one year.
Resumo:
Iowa's public road system of 112,000 miles is one of the largest and the best in the nation. It represents a considerable financial investment of taxpayer revenues over the years. And, it requires a sustained investment to preserve an economical level of transport service into the future. In 1982, a Governor's Blue Ribbon Transportation Task Force evaluated the effectiveness of Iowa's entire transportation system. Four important Task Force recommendations dealt with public road administrative issues in Iowa. These issues were related to: 1. design criteria and levels of maintenance 2. consistency in the use of standards among jurisdictions 3. consolidation of maintenance operations at one jurisdictional level and 4. jurisdictional authority for roads. The issues formed the background for Research Project HR-265.
Resumo:
This report summarizes the findings of a research which was intended to evaluate the concrete strength and opening time for the full depth patching projects in Iowa under cold weather and whether or not cold water could be allowed in the mix. This research was performed both in the laboratory and in the field. The results indicated that with the present specification the concrete strength after five hours for two-lane patches which requires hot water and calcium chloride is about 1,600 psi. Hence, if a higher strength is desired, a longer curing time is required. Hot water will have to be used and water reducer is not recommended for two-lane patches. On the other hand, the concrete strength for multi-lane patches with either hot or cold water approaches 4,000 psi in less than 24 hours. There was only a slight difference in compressive strengths between the 24-hour and 36-hours curing times.
Resumo:
This report discusses the feasibility of using infrared photoacoustic spectroscopy (PAS) as a viable technique that can quickly provide information on cement composition prior to use. The PAS technique is of interest because the cost is much lower than for other types of instrumentation used for mineral analysis, it requires virtually no sample preparation, and it can perform multi-component analysis in a matter of minutes. Feasibility of the technique was based on the ability of PAS to identify and quantify sulfate species and major cement matrix components. Strengths and limitations of the technique are presented.
Resumo:
The aim of this communication is to describe the results of a pilot project for the assessment of the transversal competency "the capacity for learning and responsibility". This competency is centred on the capacity for the analysis, synthesis, overview, and practical application of newly acquired knowledge. It is proposed by the University of Barcelona in its undergraduate degree courses,through multidisciplinary teaching teams. The goal of the pilot project is to evaluate this competency.We worked with a group of students in a first-year Business Degree maths course, during the firstsemester of the 2012/2013 academic year. The development of the project was in two stages: (i)design of a specific task to share with the same students in the following semester when the subjectwould be economic history; and (ii) the elaboration of an evaluation rubric in which we defined thecontent, the aspects to evaluate, the evaluation criteria, and the marking scale. The attainment of theexpectations of quality on the specific task was scored following this rubric, which provided a singlebasis for the precise and fair assessment by the instructor and for the students' own self-evaluation.We conclude by describing the main findings of the experience. There particularly stood out the highscore in the students' self-evaluation given to one aspect of the competency – their capacity forlearning – in stark contrast to their instructor's quite negative evaluation. This means that we have towork both to improve teaching practice and to identify the optimal competency evaluationmethodology.
Resumo:
PURPOSE: To evaluate the technical quality and the diagnostic performance of a protocol with use of low volumes of contrast medium (25 mL) at 64-detector spiral computed tomography (CT) in the diagnosis and management of adult, nontraumatic subarachnoid hemorrhage (SAH). MATERIALS AND METHODS: This study was performed outside the United States and was approved by the institutional review board. Intracranial CT angiography was performed in 73 consecutive patients with nontraumatic SAH diagnosed at nonenhanced CT. Image quality was evaluated by two observers using two criteria: degree of arterial enhancement and venous contamination. The two independent readers evaluated diagnostic performance (lesion detection and correct therapeutic decision-making process) by using rotational angiographic findings as the standard of reference. Sensitivity, specificity, and positive and negative predictive values were calculated for patients who underwent CT angiography and three-dimensional rotational angiography. The intraclass correlation coefficient was calculated to assess interobserver concordance concerning aneurysm measurements and therapeutic management. RESULTS: All aneurysms were detected, either ruptured or unruptured. Arterial opacification was excellent in 62 cases (85%), and venous contamination was absent or minor in 61 cases (84%). In 95% of cases, CT angiographic findings allowed optimal therapeutic management. The intraclass correlation coefficient ranged between 0.93 and 0.95, indicating excellent interobserver agreement. CONCLUSION: With only 25 mL of iodinated contrast medium focused on the arterial phase, 64-detector CT angiography allowed satisfactory diagnostic and therapeutic management of nontraumatic SAH.
Resumo:
This report presents the results of a comparative laboratory study between well- and gap-graded aggregates used in asphalt concrete paving mixtures. A total of 424 batches of asphalt concrete mixtures and 3,960 Marshall and Hveem specimens were examined. There is strong evidence from this investigation that, with proper-combinations of aggregates and asphalts, both continuous- and gap-graded aggregates can produce mixtures of high density and of qualities meeting current design criteria. There is also reason to believe that the unqualified acceptance of some supposedly desirable, constant, mathematical relationship between adjacent particle sizes of the form such as Fuller's curve p = 100(d/D)^n is not justified. It is recommended that the aggregate grading limits be relaxed or eliminated and that the acceptance or rejection of an aggregate for use in asphalt pavement be based on individual mixture evaluation. Furthermore, because of the potential attractiveness of gap-graded asphalt concrete in cost, quality, and skid and wear resistance, selected gap-graded mixtures are recommended for further tests both in the laboratory and in the field, especially in regard to ease of compaction and skid and wear resistance.
Resumo:
This report presents the results of a comparative laboratory study between well- and gap-graded aggregates used in asphalt concrete paving mixtures. A total of 424 batches of asphalt concrete mixtures and 3,960 Marshall and Hveem specimens were examined. There is strong evidence from this investigation that, with proper combinations of aggregates and asphalts, both continuous- and gap-graded aggregates can produce mixtures of high density and of qualities meeting current design criteria. There is also reason to believe that the unqualified acceptance of some supposedly desirable, constant, mathematical relationship between adjacent particle sizes of the form such as Fuller's curve p = 100 (d/D)n is not justified. It is recommended that. the aggregate grading limits be relaxed or eliminated and that the acceptance or rejection of an aggregate for use in asphalt pavement be based on individual mixture evaluation. Furthermore, because of the potential attractiveness of gap-graded asphalt concrete in cost, quality, and skid and wear resistance, selected gap-graded mixtures are recommended for further tests both in the laboratory and in the field, especially in regard to ease of compaction and skid and wear resistance.
Resumo:
With inflation, there is no longer a completely adequate budget for highway construction and maintenance. Restricted budgets have generated development and implementation of pavement management programs. A need for management guidelines generated National Cooperative Highway Research Program Synthesis of Highway Practice 84, "Evaluation Criteria and Priority Setting for State Highway Programs". Traffic volumes and present conditions are two major factors in determining the priority of a proposed highway improvement. The Iowa DOT, Highway Division, Office of Materials has been conducting pavement condition inventory surveys on a three-year frequency since 1969 as input for pavement management. Development of substantial wheel rutting on paved roadways results in a potential hazard to highway safety. During periods of rain, these water-filled ruts may cause hydroplaning and loss of vehicle control. It is, therefore, imparitive that Iowa roadways be continually monitored for rut depths and further that this data be used in a pavement management program to determine priorities for rehabilitation or resurfacing.
Resumo:
The present prospective study, with a five-year follow-up, presents an extensive psychiatric and educational assessment of an adolescent population (N = 30) in the age range 14-20, suffering from several psychiatric disorders, though apt to follow a normal academic program. The residential settings where the study took place provide both psychiatric and schooling facilities. In this environment, what is the effectiveness of long-term hospitalization? Are there any criteria for predicting results? After discharge, could social adjustments difficulties be prevented? Assessment instruments are described and the results of one preliminary study are presented. The actual data seems to confirm the impact of the special treatment facilities combining schooling and psychiatric settings on the long term outcome of adolescents.
Resumo:
The purpose of this investigation was to evaluate the Compensatory Wetland Mitigation Program at the Iowa Department of Transportation (DOT) in terms of regulatory compliance. Specific objectives included: 1) Determining if study sites meet the definition of a jurisdictional wetland. 2) Determining the degree of compliance with requirements specified in Clean Water Act Section 404 permits. A total of 24 study sites, in four age classes were randomly selected from over 80 sites currently managed by the Iowa DOT. Wetland boundaries were delineated in the field and mitigation compliance was determined by comparing the delineated wetland acreage at each study site to the total wetland acreage requirements specified in individual CWA Section 404 permits. Of the 24 sites evaluated in this study, 58 percent meet or exceed Section 404 permit requirements. Net gain ranged from 0.19 acre to 27.2 acres. Net loss ranged from 0.2 acre to 14.6 acres. The Denver Bypass 1 site was the worst performer, with zero acres of wetland present on the site and the Akron Wetland Mitigation Site was the best performer with slightly more than 27 acres over the permit requirement. Five of the 10 under-performing sites are more than five years post construction, two are five years post construction, one is three years post construction and the remaining two are one year post construction. Of the sites that meet or exceed permit requirements, approximately 93 percent are five years or less post construction and approximately 43 percent are only one year old. Only one of the 14 successful sites is more than five years old. Using Section 404 permit acreage requirements as the criteria for measuring success, 58 percent of the wetland mitigation sites investigated as part of this study are successful. Using net gain/loss as the measure of success, the Compensatory Wetland Mitigation Program has been successful in creating/restoring nearly 44 acres of wetland over what was required by permits.