923 resultados para Implementation process
Resumo:
This article describes a case study involving information technology managers and their new programmer recruitment policy, but the primary interest is methodological. The processes of issue generation and selection and model conceptualization are described. Early use of “magnetic hexagons” allowed the generation of a range of issues, most of which would not have emerged if system dynamics elicitation techniques had been employed. With the selection of a specific issue, flow diagraming was used to conceptualize a model, computer implementation and scenario generation following naturally. Observations are made on the processes of system dynamics modeling, particularly on the need to employ general techniques of knowledge elicitation in the early stages of interventions. It is proposed that flexible approaches should be used to generate, select, and study the issues, since these reduce any biasing of the elicitation toward system dynamics problems and also allow the participants to take up the most appropriate problem- structuring approach.
Resumo:
The research reported here is a retrospective case study of the recent (2010) introduction of the Masters in Teaching and Learning (MTL) as a post-graduate level programme of professional development for teachers. It contributes to the debate and research over the past two decades about the impact of post-graduate professional development and appropriate ways of delivering it. The study is located within an extensive body of literature dealing with the importance of the teaching profession with regard to the success of schools and pupils and the impact of professional development on teaching quality and of teaching quality on attainment. A further relevant context is the ongoing tension between the teaching profession and academics on the one hand and government and political actors on the other, in respect of the approaches to professional development and to the control of educational processes. The research questions which inform the study deal with the perspectives of various participants – policy makers, programme directors, coaches and teachers studying for the MTL – on the extent to which the MTL is likely to have an ameliorative effect on teaching and pupil attainment, their experiences of the process of policy development and their experiences as course participants. The study adopts a case study approach which involves elite interviews with those responsible for the development and implementation of the MTL, questionnaires completed by MTL course participants and a comparison group taking a conventional MA and in depth interviews with participants and coaches. The results revealed tensions and difficulties associated with the development of the MTL including uneasy relationships between HE institutions and government agencies, ideas about ‘producer capture’, the relevance of the MBA model and concern over the role of coaches. However, while acknowledging various difficulties and some misconceived expectations they viewed its potential to meet its expressed aims positively, given time. Course participants were positive about their experience of the MTL and felt that it had contributed to many aspects of their professional development. Most saw it as a positive experience despite the variable quality of support from their schools, particularly in the form of the school-based coach the concept of which had been heralded as the bellwether of the MTL. It was striking that the responses of the MTL participants were very similar to those of teachers taking a conventional MA. A finding which would repay further investigation is that while the great majority of course participants felt that the MTL (and the MA) had contributed to their becoming more effective teachers they were much less confident that it had contributed to increased pupil attainment.
Resumo:
Motivation: DNA assembly programs classically perform an all-against-all comparison of reads to identify overlaps, followed by a multiple sequence alignment and generation of a consensus sequence. If the aim is to assemble a particular segment, instead of a whole genome or transcriptome, a target-specific assembly is a more sensible approach. GenSeed is a Perl program that implements a seed-driven recursive assembly consisting of cycles comprising a similarity search, read selection and assembly. The iterative process results in a progressive extension of the original seed sequence. GenSeed was tested and validated on many applications, including the reconstruction of nuclear genes or segments, full-length transcripts, and extrachromosomal genomes. The robustness of the method was confirmed through the use of a variety of DNA and protein seeds, including short sequences derived from SAGE and proteome projects.
Resumo:
The main objective for this degree project is to implement an Application Availability Monitoring (AAM) system named Softek EnView for Fujitsu Services. The aim of implementing the AAM system is to proactively identify end user performance problems, such as application and site performance, before the actual end users experience them. No matter how well applications and sites are designed and nomatter how well they meet business requirements, they are useless to the end users if the performance is slow and/or unreliable. It is important for the customers to find out whether the end user problems are caused by the network or application malfunction. The Softek EnView was comprised of the following EnView components: Robot, Monitor, Reporter, Collector and Repository. The implemented system, however, is designed to use only some of these EnView elements: Robot, Reporter and depository. Robots can be placed at any key user location and are dedicated to customers, which means that when the number of customers increases, at the sametime the amount of Robots will increase. To make the AAM system ideal for the company to use, it was integrated with Fujitsu Services’ centralised monitoring system, BMC PATROL Enterprise Manager (PEM). That was actually the reason for deciding to drop the EnView Monitor element. After the system was fully implemented, the AAM system was ready for production. Transactions were (and are) written and deployed on Robots to simulate typical end user actions. These transactions are configured to run with certain intervals, which are defined collectively with customers. While they are driven against customers’ applicationsautomatically, transactions collect availability data and response time data all the time. In case of a failure in transactions, the robot immediately quits the transactionand writes detailed information to a log file about what went wrong and which element failed while going through an application. Then an alert is generated by a BMC PATROL Agent based on this data and is sent to the BMC PEM. Fujitsu Services’ monitoring room receives the alert, reacts to it according to the incident management process in ITIL and by alerting system specialists on critical incidents to resolve problems. As a result of the data gathered by the Robots, weekly reports, which contain detailed statistics and trend analyses of ongoing quality of IT services, is provided for the Customers.
Resumo:
BACKGROUND: Even though Swedish national guidelines for stroke care (SNGSC) have been accessible for nearly a decade access to stroke rehabilitation in out-patient health care vary considerably. In order to aid future interventions studies for implementation of SNGSC, this study assessed the feasibility and acceptability of study procedures including analysis of the context in out-patient health care settings. METHODS: The feasibility and acceptability of recruitment, observations and interviews with managers, staff and patients were assessed, as well as the feasibility of surveying health care records. RESULTS: To identify patients from the the hospitals was feasible but not from out-patient care where a need to relieve clinical staff of the recruitment process was identified. Assessing adherence to guidelines and standardized evaluations of patient outcomes through health care records was found to be feasible and suitable assessment tools to evaluate patient outcome were identified. Interviews were found to be a feasible and acceptable tool to survey the context of the health care setting. CONCLUSION: In this feasibility study a variety of qualitative and quantitative data collection procedures and measures were tested. The results indicate what can be used as a set of feasible and acceptable data collection procedures and suitable measures for studying implementation of stroke guidelines in an out-patient health care context.
Resumo:
Background: The gap between what is known and what is practiced results in health service users not benefitting from advances in healthcare, and in unnecessary costs. A supportive context is considered a key element for successful implementation of evidence-based practices (EBP). There were no tools available for the systematic mapping of aspects of organizational context influencing the implementation of EBPs in low- and middle-income countries (LMICs). Thus, this project aimed to develop and psychometrically validate a tool for this purpose. Methods: The development of the Context Assessment for Community Health (COACH) tool was premised on the context dimension in the Promoting Action on Research Implementation in Health Services framework, and is a derivative product of the Alberta Context Tool. Its development was undertaken in Bangladesh, Vietnam, Uganda, South Africa and Nicaragua in six phases: (1) defining dimensions and draft tool development, (2) content validity amongst in-country expert panels, (3) content validity amongst international experts, (4) response process validity, (5) translation and (6) evaluation of psychometric properties amongst 690 health workers in the five countries. Results: The tool was validated for use amongst physicians, nurse/midwives and community health workers. The six phases of development resulted in a good fit between the theoretical dimensions of the COACH tool and its psychometric properties. The tool has 49 items measuring eight aspects of context: Resources, Community engagement, Commitment to work, Informal payment, Leadership, Work culture, Monitoring services for action and Sources of knowledge. Conclusions: Aspects of organizational context that were identified as influencing the implementation of EBPs in high-income settings were also found to be relevant in LMICs. However, there were additional aspects of context of relevance in LMICs specifically Resources, Community engagement, Commitment to work and Informal payment. Use of the COACH tool will allow for systematic description of the local healthcare context prior implementing healthcare interventions to allow for tailoring implementation strategies or as part of the evaluation of implementing healthcare interventions and thus allow for deeper insights into the process of implementing EBPs in LMICs.
Resumo:
BACKGROUND: Annually, 2.8 million neonatal deaths occur worldwide, despite the fact that three-quarters of them could be prevented if available evidence-based interventions were used. Facilitation of community groups has been recognized as a promising method to translate knowledge into practice. In northern Vietnam, the Neonatal Health - Knowledge Into Practice trial evaluated facilitation of community groups (2008-2011) and succeeded in reducing the neonatal mortality rate (adjusted odds ratio, 0.51; 95 % confidence interval 0.30-0.89). The aim of this paper is to report on the process (implementation and mechanism of impact) of this intervention. METHODS: Process data were excerpted from diary information from meetings with facilitators and intervention groups, and from supervisor records of monthly meetings with facilitators. Data were analyzed using descriptive statistics. An evaluation including attributes and skills of facilitators (e.g., group management, communication, and commitment) was performed at the end of the intervention using a six-item instrument. Odds ratios were analyzed, adjusted for cluster randomization using general linear mixed models. RESULTS: To ensure eight active facilitators over 3 years, 11 Women's Union representatives were recruited and trained. Of the 44 intervention groups, composed of health staff and commune stakeholders, 43 completed their activities until the end of the study. In total, 95 % (n = 1508) of the intended monthly meetings with an intervention group and a facilitator were conducted. The overall attendance of intervention group members was 86 %. The groups identified 32 unique problems and implemented 39 unique actions. The identified problems targeted health issues concerning both women and neonates. Actions implemented were mainly communication activities. Communes supported by a group with a facilitator who was rated high on attributes and skills (n = 27) had lower odds of neonatal mortality (odds ratio, 0.37; 95 % confidence interval, 0.19-0.73) than control communes (n = 46). CONCLUSIONS: This evaluation identified several factors that might have influenced the outcomes of the trial: continuity of intervention groups' work, adequate attributes and skills of facilitators, and targeting problems along a continuum of care. Such factors are important to consider in scaling-up efforts.
Resumo:
If conducted poorly and without support from all employee levels, performance management programs at institutions may devolve into annual evaluations that represent a staff burden rather than an ongoing career development opportunity. This brief analyzes the key components of successful performance evaluation systems for non-academic staff, incorporating insights from employers outside of the higher education sector as well. It examines the importance of midyear check-in meetings; employee goal-setting; simplified rating scales on evaluation forms; and core staff competencies that reflect institutional priorities. It also describes how institutions communicate modifications to the evaluation system and offers recommendations for the implementation of process change.
Resumo:
Generalized hyper competitiveness in the world markets has determined the need to offer better products to potential and actual clients in order to mark an advantagefrom other competitors. To ensure the production of an adequate product, enterprises need to work on the efficiency and efficacy of their business processes (BPs) by means of the construction of Interactive Information Systems (IISs, including Interactive Multimedia Documents) so that they are processed more fluidly and correctly.The construction of the correct IIS is a major task that can only be successful if the needs from every intervenient are taken into account. Their requirements must bedefined with precision, extensively analyzed and consequently the system must be accurately designed in order to minimize implementation problems so that the IIS isproduced on schedule and with the fewer mistakes as possible. The main contribution of this thesis is the proposal of Goals, a software (engineering) construction process which aims at defining the tasks to be carried out in order to develop software. This process defines the stakeholders, the artifacts, and the techniques that should be applied to achieve correctness of the IIS. Complementarily, this process suggests two methodologies to be applied in the initial phases of the lifecycle of the Software Engineering process: Process Use Cases for the phase of requirements, and; MultiGoals for the phases of analysis and design. Process Use Cases is a UML-based (Unified Modeling Language), goal-driven and use case oriented methodology for the definition of functional requirements. It uses an information oriented strategy in order to identify BPs while constructing the enterprise’s information structure, and finalizes with the identification of use cases within the design of these BPs. This approach provides a useful tool for both activities of Business Process Management and Software Engineering. MultiGoals is a UML-based, use case-driven and architectural centric methodology for the analysis and design of IISs with support for Multimedia. It proposes the analysis of user tasks as the basis of the design of the: (i) user interface; (ii) the system behaviour that is modeled by means of patterns which can combine Multimedia and standard information, and; (iii) the database and media contents. This thesis makes the theoretic presentation of these approaches accompanied with examples from a real project which provide the necessary support for the understanding of the used techniques.
Resumo:
This thesis describes all process of the development of music visualization, starting with the implementation, followed by realization and then evaluation. The main goal is to have to knowledge of how the audience live performance experience can be enhanced through music visualization. With music visualization is possible to give a better understanding about the music feelings constructing an intensive atmosphere in the live music performance, which enhances the connection between the live music and the audience through visuals. These visuals have to be related to the live music, furthermore has to quickly respond to live music changes and introduce novelty into the visuals. The mapping between music and visuals is the focus of this project, in order to improve the relationship between the live performance and the spectators. The implementation of music visualization is based on the translation of music into graphic visualizations, therefore at the beginning the project was based on the existent works. Later on, it was decided to introduce new ways of conveying music into visuals. Several attempts were made in order to discover the most efficient mapping between music and visualization so people can fully connect with the performance. Throughout this project, those attempts resulted in several music visualizations created for four live music performances, afterwards it was produced an online survey to evaluate those live performances with music visualization. In the end, all conclusions are presented based on the results of the online survey, and also is explained which music elements should be depicted in the visuals, plus how those visuals should respond to the selected music elements.
Resumo:
Nowadays, more than half of the computer development projects fail to meet the final users' expectations. One of the main causes is insufficient knowledge about the organization of the enterprise to be supported by the respective information system. The DEMO methodology (Design and Engineering Methodology for Organizations) has been proved as a well-defined method to specify, through models and diagrams, the essence of any organization at a high level of abstraction. However, this methodology is platform implementation independent, lacking the possibility of saving and propagating possible changes from the organization models to the implemented software, in a runtime environment. The Universal Enterprise Adaptive Object Model (UEAOM) is a conceptual schema being used as a basis for a wiki system, to allow the modeling of any organization, independent of its implementation, as well as the previously mentioned change propagation in a runtime environment. Based on DEMO and UEAOM, this project aims to develop efficient and standardized methods, to enable an automatic conversion of DEMO Ontological Models, based on UEAOM specification into BPMN (Business Process Model and Notation) models of processes, using clear semantics, without ambiguities, in order to facilitate the creation of processes, almost ready for being executed on workflow systems that support BPMN.
Resumo:
Organizations are Complex systems. A conceptual model of the enterprise is needed that is: coherent the distinguished aspect models constitute a logical and truly integral comprehensive all relevant issues are covered consistent the aspect models are free from contradictions or irregularities concise no superfluous matters are contained in it essential it shows only the essence of the enterprise, i.e., the model abstracts from all realization and implementation issues. The world is in great need for transparency about the operation of all the systems we daily work with, ranging from the domestic appliances to the big societal institutions. In this context the field of enterprise ontology has emerged with the aim to create models that help to understand the essence of the construction and operation of complete systems; more specifically, of enterprises. Enterprise ontology arises in the way to look through the distracting and confusing appearance of an enterprise right into its deep kernel. This, from the perspective of the system designer gives him the tools needed to design a successful system in a way that’s reflects the desires and needs of the workers of the enterprise. This project’s context is the use of DEMO (Design and Engineering Methodology for Organizations) for (re)designing or (re)engineering of an enterprise, namely a process of the construction department of a city hall, the lack of a well-founded theory about the construction and operation of this processes that was the motivation behind this work. The purpose of studying applying the DEMO theory and method was to optimize the process, automating it as much as possible, while reducing paper and time spent between tasks and provide a better service to the citizens.
Resumo:
An economic model including the labor resource and the process stage configuration is proposed to design g charts allowing for all the design parameters to be varied in an adaptive way. A random shift size is considered during the economic design selection. The results obtained for a benchmark of 64 process stage scenarios show that the activities configuration and some process operating parameters influence the selection of the best control chart strategy: to model the random shift size, its exact distribution can be approximately fitted by a discrete distribution obtained from a relatively small sample of historical data. However, an accurate estimation of the inspection costs associated to the SPC activities is far from being achieved. An illustrative example shows the implementation of the proposed economic model in a real industrial case. (C) 2011 Elsevier B.V. All rights reserved.
Resumo:
Linear mixed effects models have been widely used in analysis of data where responses are clustered around some random effects, so it is not reasonable to assume independence between observations in the same cluster. In most biological applications, it is assumed that the distributions of the random effects and of the residuals are Gaussian. This makes inferences vulnerable to the presence of outliers. Here, linear mixed effects models with normal/independent residual distributions for robust inferences are described. Specific distributions examined include univariate and multivariate versions of the Student-t, the slash and the contaminated normal. A Bayesian framework is adopted and Markov chain Monte Carlo is used to carry out the posterior analysis. The procedures are illustrated using birth weight data on rats in a texicological experiment. Results from the Gaussian and robust models are contrasted, and it is shown how the implementation can be used for outlier detection. The thick-tailed distributions provide an appealing robust alternative to the Gaussian process in linear mixed models, and they are easily implemented using data augmentation and MCMC techniques.
Resumo:
The design and implementation of an ERP system involves capturing the information necessary for implementing the system's structure and behavior that support enterprise management. This process should start on the enterprise modeling level and finish at the coding level, going down through different abstraction layers. For the case of Free/Open Source ERP, the lack of proper modeling methods and tools jeopardizes the advantages of source code availability. Moreover, the distributed, decentralized decision-making, and source-code driven development culture of open source communities, generally doesn't rely on methods for modeling the higher abstraction levels necessary for an ERP solution. The aim of this paper is to present a model driven development process for the open source ERP ERP5. The proposed process covers the different abstraction levels involved, taking into account well established standards and common practices, as well as new approaches, by supplying Enterprise, Requirements, Analysis, Design, and Implementation workflows. Copyright 2008 ACM.