794 resultados para Construction site management


Relevância:

30.00% 30.00%

Publicador:

Resumo:

A systematic technique for identifying the environments of construction projects is described. It provides a method for isolating the major variables surrounding construction projects, and is briefly applied to the industries of Britain and Jamaica to illustrate its application. From this, it is inferred that the environment of a Jamaican construction project in systems terms is broadly similar to the environment of a construction project in Britain.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

An overview of organization in the construction industry is identified from plans of work published in the UK. This provides a basis for identifying the essential steps through which any construction project must pass. It is shown that all construction projects pass through a set of stages of work, consisting of inception, feasibility, scheme design, detail design, contract formation, construction and commissioning. Although there may be changes to the sequence and importance of these stages, their identification helps in making judgements about organizational structure on construction projects.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The origins of the various procurement methods in construction are considered, followed by a discussion of the circumstances for which each procurement system is best suited. The likely future development sin management-based methods are discussed in the context of current research, showing that co-ordination of trade and specialist contractors , more flexible contracting, constructive conflict management and a potential polarization of views about project management in the industry are likely.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This paper is from a study on specialist and trade contracting in the construction industry. The research was commissioned by CIRIA and undertaken by the University of Reading in conjunction with Sir Alexander Gibb & Partners Ltd. The purpose of the work was to provide guidance for effective and equitable practice in the management of projects where much of the work is executed, and possibly designed, by specialist and trade contractors (STCs). As part of this study, a preliminary investigation into the nature and origins of specialist contracting was undertaken, in conjunction with a survey of the problems confronting STCs. This paper presents that phase of the project.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Although much literature on construction procurement is based on personal experiences, there is little data available to undertake realistic comparison between regions or from one year to another. A survey was undertaken in the UK to examine the feasibility of developing a replicable survey technique that will enable longitudinal studies and international comparisons. The survey showed that a majority felt traditional procurement methods were inappropriate. However, traditional general contracting is still the most common form of procurement. There was strong agreement that economic muscle compels weaker contracting parties to accept onerous contractual terms. There is no relationship between the size of a project and its procurement method, contrary to popular belief. The findings indicate that wider surveys would generate useful data about attitudes.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Research in construction management is diverse in content and in quality. There is much to be learned from more fundamental disciplines. Construction is a sub-set of human experience rather than a completely separate phenomenon. Therefore, it is likely that there are few problems in construction requiring the invention of a completely new theory. If construction researchers base their work only on that of other construction researchers, our academic community will become less relevant to the world at large. The theories that we develop or test must be of wider applicability to be of any real interest. In undertaking research, researchers learn a lot about themselves. Perhaps the only difference between research and education is that if we are learning about something which no-one else knows, then it is research, otherwise it is education. Self-awareness of this will help to reduce the chances of publishing work which only reveals a researcher’s own learning curve. Scientific method is not as simplistic as non-scientists claim and is the only real way of overcoming methodological weaknesses in our work. The reporting of research may convey the false impression that it is undertaken in the sequence in which it is written. Construction is not so unique and special as to require a completely different set of methods from other fields of enquiry. Until our research is reported in mainstream journals and conferences, there is little chance that we will influence the wider academic community and a concomitant danger that it will become irrelevant. The most useful insights will come from research which challenges the current orthodoxy rather than research which merely reports it.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The cost of tendering in the construction industry is widely suspected to be excessive, but there is little robust empirical evidence to demonstrate this. It also seems that innovative working practices may reduce the costs of undertaking construction projects and the consequent improvement in relationships should increase overall value for money. The aim of this proposed research project is to develop mechanisms for measuring the true costs of tendering based upon extensive in-house data collection undertaken in a range of different construction firms. The output from this research will enable all participants in the construction process to make better decisions about how to select members of the team and identify the price and scope of their obligations.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

In developing techniques for monitoring the costs associated with different procurement routes, the central task is disentangling the various project costs incurred by organizations taking part in construction projects. While all firms are familiar with the need to analyse their own costs, it is unusual to apply the same kind of analysis to projects. The purpose of this research is to examine the claims that new ways of working such as strategic alliancing and partnering bring positive business benefits. This requires that costs associated with marketing, estimating, pricing, negotiation of terms, monitoring of performance and enforcement of contract are collected for a cross-section of projects under differing arrangements, and from those in the supply chain from clients to consultants, contractors, sub-contractors and suppliers. Collaboration with industrial partners forms the basis for developing a research instrument, based on time sheets, which will be relevant for all those taking part in the work. The signs are that costs associated with tendering are highly variable, 1-15%, depending upon what precisely is taken into account. The research to date reveals that there are mechanisms for measuring the costs of transactions and these will generate useful data for subsequent analysis.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Recent developments in contracting practice in the UK have built upon recommendations contained in highprofile reports, such as those by Latham and Egan. However, the New Engineering Contract (NEC), endorsed by Latham, is based upon principles of contract drafting that seem open to question. Any contract operates in the context of its legislative environment and current working practices. This report identifies eight contentious hypotheses in the literature on construction contracts and tests their validity in a sample survey that attracted 190 responses. The survey shows, among other things, that while partnership is a positive and useful idea, authoritative contract management is considered more effective and that “win-win” contracts, while desirable, are basically impractical. Further, precision and fairness in contracts are not easy to achieve simultaneously. While participants should know what is in their contracts, they should not routinely resort to legal action; and standard-form contracts should not seek to be universally applicable. Fundamental changes to drafting policy should be undertaken within the context of current legal contract doctrine and with a sensitivity to the way that contracts are used in contemporary practice. Attitudes to construction contracting may seem to be changing on the surface, but detailed analysis of what lies behind apparent agreement on new ways of working reveals that attitudes are changing much more slowly than they appear to be.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Throughout the developed world, professional services play an increasingly important part in an economy, with many countries showing a substantial positive trade balance for services. Yet, there has been relatively little research on construction services (CS) and, in particular, how well professional service companies (PSFs) perform in the international arena. The method for collecting services export information differs to the way in which goods and products exports data are gathered because of the intangible nature of services. Organisational growth of companies aims to share risks across different regions and sectors, however, the rapidly changing business environment challenges companies with the increasing foreign ownership and changes in procurement. The complexity of today’s international construction services organisations raises two questions: how the organisations can successfully manage growth and what are their motives for international trade. The research focuses on top UK consulting engineering companies to understand their organisational strategy, their export strategy, and drivers for overseas activities. The data will feed a model of professional services exports, which can help to inform the way services export data could be collected to better reflect the industry’s performance.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Generally poor productivity, delays, low profitability and exceeded budgets are Common problems in modern construction management, however it seems that a basic obstacle lies far deeper in the understanding of a firm's fundamental mission, its existence. The main objective of this paper therefore is to examine the operational living of a construction firm and by doing that to reveal the key problem or the solution for a construction firm - its organization. A firm as a social system in which interactions between its constitutive components (employees) are surordinated to its maintenance (keeping a system alive) is an autopoietic social system. Two domains of external perturbations are uncovered to which a construction firm has to adapt (market driven and project driven perturbations). Constructed conceptual model of an autopoietic organization is based upon two necessary and sufficient operational domains that a firm has to create in order to become an autopoietic, adaptive social system. The first one is a domain of interactions between employees and other operationally external systems, which is representing an idea-generating domain of interactions. The second is employee's autonomous operational domain, which embodies employee's autonomy and individuality and represents a necessary condition for the establishment of an idea-generating domain. Finally, it is recognized that interactions within these four domains keep a construction firm alive.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Commitment of employees is relatively low in construction. This problem is exasperated by companies inability to attract, motivate, and retain talent that is then often channelled into other more attractive industrial sectors where the prospects, conditions and rewards are perceived to be much higher. The purpose of this study is thus primarily to develop a generic model to maximise employees' engagement, improve their motivation and increase the retention levels. To achieve this aim, the investigation looks into how perceived employment obligations and expectations impact commitment and through that organisational performance. The study is based on the postulations of Luhmann's theory of social systems with communication viewed as a constitutive element of a social system. Consequently expectations of a particular party in an employment relationship are represented in a communicative space requiring the other party's understanding in order to align expectations of both sides in the relationship. Explicitly, alignment of by an employee perceived manager's expectations determines his/ her commitment to fulfil obligations towards the manager. The result of this first stage of research is a conceptual model developed following the substantial supporting evidence in the literature and it forms the framework for mitigation of low commitment, motivation and retention of employees. The model particularly focuses on factors affecting employees' perceived expectations like reneging, incongruence and the process of communication. In the future the model will be validated using empirical data from a combination of observational and enquiry-based research. Once completed, the model will provide a framework for informing Human Resource Management policies with the aim to improve commitment of employees, increase the levels of retention and consequently improve the performance of construction organisations.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Plant communities of set-aside agricultural land in a European project were managed in order to enhance plant succession towards weed-resistant, mid-successional grassland. Here, we ask if the management of a plant community affects the earthworm community. Field experiments were established in four countries, the Netherlands, Sweden, the UK, and the Czech Republic. High (15 plant species) and low diversity (four plant species) seed mixtures were sown as management practice, with natural colonization as control treatment in a randomized block design. The response of the earthworrns to the management was studied after three summers since establishment of the sites. Samples were also taken from plots with continued agricultural practices included in the experimental design and from a site with a late successional plant community representing the target plant community. The numbers and biomass of individuals were higher in the set-aside plots than in the agricultural treatment in two countries out of four. The numbers of individuals at one site (The Netherlands) was higher in the naturally colonized plots than in the sowing treatments, otherwise there were no differences between the treatments. Species diversity was lower in the agricultural plots in one country. The species composition had changed from the initial community of the agricultural field, but was still different from a late successional target community. The worm biomass was positively related to legume biomass in Sweden and to grass biomass in the UK. (C) 2005 Elsevier SAS. All rights reserved.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The field site network (FSN) plays a central role in conducting joint research within all Assessing Large-scale Risks for biodiversity with tested Methods (ALARM) modules and provides a mechanism for integrating research on different topics in ALARM on the same site for measuring multiple impacts on biodiversity. The network covers most European climates and biogeographic regions, from Mediterranean through central European and boreal to subarctic. The project links databases with the European-wide field site network FSN, including geographic information system (GIS)-based information to characterise the test location for ALARM researchers for joint on-site research. Maps are provided in a standardised way and merged with other site-specific information. The application of GIS for these field sites and the information management promotes the use of the FSN for research and to disseminate the results. We conclude that ALARM FSN sites together with other research sites in Europe jointly could be used as a future backbone for research proposals