The construction industry has become a truly global network of interconnected stakeholders making demands which require the involvement of skilled workforces from all over the world. Construction Management Strategies sets the foundations for understanding and managing construction’s inherent complexity and uniqueness. It establishes clear definitions of commonly accepted terms like built environment, construction, civil engineering, etc. which are often given confusing and conflicting interpretations. It cuts through the plethora of overlapping role titles currently used in the construction sector that make it difficult to establish how projects are actually managed.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Individual-level constructs are seldom taken into consideration in construction management research relating to project performance. This is antithetical to the objectives of properly conceptualizing and contextualizing the research we do because many project performance outcomes, such as the extent of cooperation and level of communication or teamwork are influenced and moderated by individuals’ perceptions, values and behaviour. A brief review of the literature in organizational studies centred on culture, identity, empowerment and trust is offered. These constructs are then explored in relation to project performance issues and outcomes, and it is noted that they are predominantly studied at the project and industry levels. We argue that focusing these constructs at the individual unit of analysis has significant implications for project performance and therefore their effects need to be systematically accounted for in explanations of the success and failure of projects. Far from being prescriptive, the aim is to generate interest and awareness for more focused research at the individual level of analysis in order to add new insights and perspectives to critical performance questions in construction management. To this end, a research agenda is outlined, arguing that construction management research integrating individual-level constructs and broader, macro-contextual issues will help define and enhance the legitimacy of the field.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

How does the work of designers impact on the safety of operatives at the construction site? Safety research and policy emphasize the importance of designing for safe construction, yet the interface between design and construction is poorly understood: accidents have multiple causes making it hard to establish causal links between design choices and safety outcomes. An in-depth case study of a major station project examines how professionals on the construction site perceive and manage the safety challenges of a building design. Analyses reveal understandings that, on the project studied, design has an impact on safety because of: (1) the timing of design work, where the volume of late design changes increased the difficulty of planning safe procedures, e.g. for working at height, lifting heavy items, refurbishing and demolishing old buildings; and (2) inputs from design stakeholders with insufficient practical knowledge of construction and operation required unplanned work-arounds, e.g. to coordinate different sub-systems, provide maintenance access, and manage loads during construction. These findings suggest that safety suffers where projects are under-designed, and that alongside regulation, there is a need for robust management attention to the contractual structures, incentives, processes and tools that enable clients and designers to understand material practices of construction and operation.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This paper reports part of a qualitative study into evolving practice in the implementation of the Dispute Adjudication Board (DAB) construction dispute resolution technique, a variant of the Dispute Review Board (DRB) concept used in the US and Canada. Data was collected through a focus group interview of 20 highly experienced dispute resolution practitioners from engineering and the law. The group was assembled from members of FIDIC-NET with direct experience of project DABs. The part reported here concerns practice and procedure for establishing DABs. The main findings are that: constitution of the DABs is often delayed because of either project owners' ignorance of the DAB process or deterrence by the cost of the DABs; such owners also tend to insist on appointing DAB members from local engineers and lawyers without sufficient understanding of the DAB process; rates of remuneration of DAB members vary widely; the training provision for DAB membership and advocacy skills is inadequate; the process of selecting candidates for DAB membership and negotiating the tripartite agreement between each member and the contractual parties needs to be navigated with great care to avoid raising ethical problems. The research contribution is threefold. First, it highlights the importance of realistic fees for DAB members within a standard framework in achieving timely establishment of a board that works well as a team. Second, it illustrates the use of qualitative focus group interview to study the impact of new contract terms from multiple stakeholder perspectives. Finally, it identifies areas where further research is needed.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

he construction market around the world has witnessed the growing eminence of construction professional services (CPSs), such as urban planning, architecture, engineering, and consultancy, while the traditional contracting sector remains strong. Nowadays, it is not uncommon to see a design firm taking over the work of a traditional main contractor, or vice versa, of overseeing the delivery of a project. Although the two sectors of contracting and CPS share the same purpose of materializing the built environment, they are as different as they are interrelated. Much has been mentioned about the nexus between the two but little has been done to articulate it using empirical evidence. This study examined the nexus between contracting and CPS businesses by offering and testing lead-lag effects between the two sectors in the international market. A longitudinal panel data composed of 23 top international contractors and CPS firms was adopted. Surprisingly, results of the panel data analyses show that CPS business does not have a significant positive causal effect on contracting as a downstream business, and vice versa. CPS and contracting subsidiaries, although within the same company, do not necessarily form a consortium to undertake the same project; rather, they often collaborate with other CPS or contracting counterparts to undertake projects. This paper provides valuable insights into the sophisticated nexus between contracting and CPS in the international construction market. It will support business executives’ rational decision making for selecting proper contracting or CPS allies, or a proper mergers and acquisitions strategy in the international market. The paper also provides a fresh perspective through which researchers can better investigate the diversification strategies adopted by international contracting and CPS firms.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Construction professional service (CPS) firms sell expertise and provide innovative solutions for projects founded on their knowledge, experience, and technical competences. Large CPS firms seeking to grow will often seek new opportunities in their domestic market and overseas by organic or inorganic growth through mergers, alliances, and acquisitions. Growth can also come from increasing market penetration through vertical, horizontal, and lateral diversification. Such growth, hopefully, leads to economies of scope and scale in the long term, but it can also lead to diseconomies, when the added cost of integration and the increased complexity of diversification no longer create tangible and intangible benefits. The aim of this research is to investigate the key influences impacting on the growth in scope and scale for large CPS firms. Qualitative data from the interviews were underpinned by secondary data from CPS firms’ annual reports and analysts’ findings. The findings showed five key influences on the scope and scale of a CPS firm: the importance of growth as a driver; the influence of the ownership of the firm on the decision for growth in scope and scale; the optimization of resources and capabilities; the need to serve changing clients’ needs; and the importance of localization. The research provides valuable insights into the growth strategies of international CPS firms. A major finding of the research is the influence of ownership on CPS firms’ growth strategies which has not been highlighted in previous research.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

There is a renewed interest in immersive visualization to navigate digital data-sets associated with large building and infrastructure projects. Following work with a fully immersive visualization facility at the University, this paper details the development of a complementary mobile visualization environment. It articulates progress on the requirements for this facility; the overall design of hardware and software; and the laboratory testing and planning for user pilots in construction applications. Like our fixed facility, this new light-weight mobile solution enables a group of users to navigate a 3D model at a 1:1 scale and to work collaboratively with structured asset information. However it offers greater flexibility as two users can assemble and start using it at a new location within an hour. The solution has been developed and tested in a laboratory and will be piloted in engineering design review and stakeholder engagement applications on a major construction project.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The UK government is mandating the use of building information modelling (BIM) in large public projects by 2016. As a result, engineering firms are faced with challenges related to embedding new technologies and associated working practices for the digital delivery of major infrastructure projects. Diffusion of innovations theory is used to investigate how digital innovations diffuse across complex firms. A contextualist approach is employed through an in-depth case study of a large, international engineering project-based firm. The analysis of the empirical data, which was collected over a four-year period of close interaction with the firm, reveals parallel paths of diffusion occurring across the firm, where both the innovation and the firm context were continually changing. The diffusion process is traced over three phases: centralization of technology management, standardization of digital working practices, and globalization of digital resources. The findings describe the diffusion of a digital innovation as multiple and partial within a complex social system during times of change and organizational uncertainty, thereby contributing to diffusion of innovations studies in construction by showing a range of activities and dynamics of a non-linear diffusion process.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

From a construction innovation systems perspective, firms acquire knowledge from suppliers, clients, universities and institutional environment. Building information modelling (BIM) involves these firms using new process standards. To understand the implications on interactive learning using BIM process standards, a case study is conducted with the UK operations of a multinational construction firm. Data is drawn from: a) two workshops involving the firm and a wider industry group, b) observations of practice in the BIM core team and in three ongoing projects, c) 12 semi-structured interviews; and d) secondary publications. The firm uses a set of BIM process standards (IFC, PAS 1192, Uniclass, COBie) in its construction activities. It is also involved in a pilot to implement the COBie standard, supported by technical and management standards for BIM, such as Uniclass and PAS1192. Analyses suggest that such BIM process standards unconsciously shapes the firm's internal and external interactive learning processes. Internally standards allow engineers to learn from each through visualising 3D information and talking around designs with operatives to address problems during construction. Externally, the firm participates in trial and pilot projects involving other construction firms, government agencies, universities and suppliers to learn about the standard and access knowledge to solve its specific design problems. Through its BIM manager, the firm provides feedback to standards developers and information technology suppliers. The research contributes by articulating how BIM process standards unconsciously change interactive learning processes in construction practice. Further research could investigate these findings in the wider UK construction innovation system.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This paper proposes a methodology to achieve integrated planning and projects for secondary distribution circuits. The planning model is formulated as a mixed integer nonlinear programming problem (MINLP). In order to resolve this problem, a tabu search (TS) algorithm is used, with a neighborhood structure developed to explore the physical characteristics of specific geographies included in the planning and expansion of secondary networks, thus obtaining effective solutions as well as low operating costs and investments. The project stage of secondary circuits consists of calculating the mechanical efforts to determine the support structures of the primary and secondary distribution systems and determining the types of structures that should be used in the system according to topological and electrical parameters of the network and, therefore, accurately assessing the costs involved in the construction and/or reform of secondary systems. A constructive heuristic based on information of the electrical and topological conditions between the medium voltage and low voltage systems is used to connect the primary systems and secondary circuits. The results obtained from planning and design simulations of a real secondary system of electric energy distribution are presented.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The number of dams, which need rehabilitation, is growing, not only in countries that have a long tradition in dam building and operation but,also in those regions where the infrastructure is still in full development. Though rehabilitation projects generally deal with problems that are common in dam engineering practice there are some peculiarities which are a characteristic of such projects and which must be duly taken into account to avoid unsuccess and/or unnecessary costs. Regular safety inspection is essential to forestall the development of structural, hydrological and operational unsafety. if need of major repair or overall rehabilitation of a dam becomes apparent design oft he rehabilitation project must be preceded by a comprehensive checkup of the structure and appurtenant works, as well as by an evaluation of its hydrological safety inclusive of all relevant environmental aspects. The availability of complete records on the clam's structural behaviour and on meteorological and hydrological data, as well as the knowledge of the materials properties of the existing structure are important for the successful design of a rehabilitation project. To this end the installation of monitoring devices in the existing structure may be necessary to generate representative data. While the criteria to be used in structural design should correspond to current standards, the definition of hydrological design criteria depends on considerations that vary widely from region to region or even from one country to another. Some basic hydrological safety requirements, however, are recommended for general acceptance. Dam rehabilitation projects demand very careful and detailed construction planning because of their dependence on river flow conditions, operational restrictions and, often, on procedures or limitations imposed to avoid harm to the environment. of utmost importance is the timely availability of the financial funds required to complete the project, in order to avoid delays which could result in structural or operational unsafety. Since every dam sooner or later will have to undergo major repair or updating of safety, rehabilitation may evolve to a speciality of dam engineering.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The need for the representation of both semantics and common sense and its organization in a lexical database or knowledge base has motivated the development of large projects, such as Wordnets, CYC and Mikrokosmos. Besides the generic bases, another approach is the construction of ontologies for specific domains. Among the advantages of such approach there is the possibility of a greater and more detailed coverage of a specific domain and its terminology. Domain ontologies are important resources in several tasks related to the language processing, especially in those related to information retrieval and extraction in textual bases. Information retrieval or even question and answer systems can benefit from the domain knowledge represented in an ontology. Besides embracing the terminology of the field, the ontology makes the relationships among the terms explicit. Copyright 2007 ACM.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This article analyzes the construction of the African perspective in the General History of Africa project (GHA), focusing on the period between 1965 and 1979. With the participation of over two hundred international experts under the auspices of Unesco, this was one of the greatest intellectual projects of the twentieth century. Based on primary sources, this analysis emphasizes the internal conflicts involved in the construction of the African perspective as a hegemonic line of thought in the GHA. Two critical moments of the project were found in the investigation: the controversial years (1972-78), and the pragmatic years (1978-82). As a result of these disputes, theoretical and methodological parameters were constructed, in addition to eight volumes of material published in the 1980s, and recently republished in Brazil.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The challenges posed by global climate change are motivating the investigation of strategies that can reduce the life cycle greenhouse gas (GHG) emissions of products and processes. While new construction materials and technologies have received significant attention, there has been limited emphasis on understanding how construction processes can be best managed to reduce GHG emissions. Unexpected disruptive events tend to adversely impact construction costs and delay project completion. They also tend to increase project GHG emissions. The objective of this paper is to investigate ways in which project GHG emissions can be reduced by appropriate management of disruptive events. First, an empirical analysis of construction data from a specific highway construction project is used to illustrate the impact of unexpected schedule delays in increasing project GHG emissions. Next, a simulation based methodology is described to assess the effectiveness of alternative project management strategies in reducing GHG emissions. The contribution of this paper is that it explicitly considers projects emissions, in addition to cost and project duration, in developing project management strategies. Practical application of the method discussed in this paper will help construction firms reduce their project emissions through strategic project management, and without significant investment in new technology. In effect, this paper lays the foundation for best practices in construction management that will optimize project cost and duration, while minimizing GHG emissions.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This paper is presented in CIB: Management and Innovation Sustainable Built Environment 2011, as the study and analysis of the residential model of a rural area from the Iberian Peninsula, specifically applied to the case of the province of Cáceres, in the autonomous region of Extremadura, in Spain. To this end, from a database made up of building projects whose real costs are known, it is intended to establish the links of the different parameters studied through the corresponding functions of statistical analysis. One of the main objectives of this process is constituted by the possibility of establishing those design variables of higher economic importance, so as to keep an economic control of these parameters, generally geometrical and typological, from the very start of the project. And, in general, a higher optimization of resources in the construction of dwellings in the rural environment from their design is intended.