967 resultados para Chandler, Zachariah, 1813-1879.
Resumo:
In this letter from Levi Colburn to Loammi Baldwin, Colburn details the cost estimates in dollars for the roof, floors, windows, and labor of University Hall.
Resumo:
Kirkland informs Baldwin that has ideas about the construction of University Hall, and requests to meet with Baldwin. Kirkland states that he does "not see the occasion for losing ten thousand dollars from modesty."
Resumo:
In this letter, Lowell approves of Baldwin's contracting with Walton & Moore for the construction of University Hall.
Resumo:
This is a contract signed between Loammi Baldwin, acting on behalf of the President and Fellows of Harvard College, and Josiah Moore, Esquire; John Walton, Housewright; Thomas Mason, Housewright; Samuel Mason, Housewright; and Joseph Holmes, Housewright, for the construction of University Hall. The agreement was witnessed by William Jenison and Josiah Nottage.
Resumo:
Contains one sewn volume of work orders for the construction of University Hall in the hand of Loammi Baldwin between May 1813 and May 1814. The volume contains 46 completed work orders for supplies and services for "building the new Dining Halls and Chapel in Cambridge" payable to Hon. John Davis, Harvard treasurer. Completed work orders are noted with the name of the payee, amount paid, and the supplies or services fulfilled. Work orders 47 through 60 in the volume are unused.
Resumo:
Latin inscription carved into the cornerstone of University Hall laid into place by President John Kirkland on July 1, 1813.
Resumo:
Lowell recounts meeting Mr. Nelson, a bidder for the stucco and plastering work for University Hall. Lowell recommends that a decision should be made on the work within a week.
Resumo:
Bemis, responding to an advertisement from Lowell and Baldwin requesting bids for building materials, outlines his proposal for using Chelmsford granite for the construction of University Hall. Bemis lists 12 stipulations in his proposal including costs per bricks, techniques for constructing the upper storeys, and labor costs.
Resumo:
This estimate submitted by Metcalf and Hunter includes their projected costs for completing the outside of University Hall with face stone. Also includes itemized estimates for rough stone work on the cellar and brick laying.
Resumo:
Moore and Walton's projected cost for finishing University Hall is $5,386.61. This includes finishing the roof, laying the floors, and installing the gutters and windows.
Resumo:
Detailed drawing of stairways to be built in University Hall. Includes dimensions for height, length, and width of stairs.
Resumo:
This drawing includes the intricate stonework designed by Charles Bulfinch for University Hall. Each stone is numbered or lettered to indicate the exact stones needed for the project.
Resumo:
This drawing includes the dimensions for the north and south stairs as well as for the spaces surrounding the staircases. Dimensions are also given for the windows and doors.
Resumo:
Folio-sized account book in brown paper cover containing accounting records kept by Pearson related to the estate of his daughter Mary Pearson.
Resumo:
Three receipts, dated November 6, 1813, November 30, 1813, and February 15, 1814, for purchases made by Pearson of silver items crafted by Ebenezer Moulton. The receipts were laid into the back of the account book. A photograph of a ladle made by Ebenezer Moulton and listed in one of the receipts is available in the control file for this collection.