877 resultados para multinational contractor
Resumo:
In my thesis I present the findings of a multiple-case study on the CSR approach of three multinational companies, applying Basu and Palazzo's (2008) CSR-character as a process model of sensemaking, Suchman's (1995) framework on legitimation strategies, and Habermas (1996) concept of deliberative democracy. The theoretical framework is based on the assumption of a postnational constellation (Habermas, 2001) which sends multinational companies onto a process of sensemaking (Weick, 1995) with regards to their responsibilities in a globalizing world. The major reason is that mainstream CSR-concepts are based on the assumption of a liberal market economy embedded in a nation state that do not fit the changing conditions for legitimation of corporate behavior in a globalizing world. For the purpose of this study, I primarily looked at two research questions: (i) How can the CSR approach of a multinational corporation be systematized empirically? (ii) What is the impact of the changing conditions in the postnational constellation on the CSR approach of the studied multinational corporations? For the analysis, I adopted a holistic approach (Patton, 1980), combining elements of a deductive and inductive theory building methodology (Eisenhardt, 1989b; Eisenhardt & Graebner, 2007; Glaser & Strauss, 1967; Van de Ven, 1992) and rigorous qualitative data analysis. Primary data was collected through 90 semi-structured interviews in two rounds with executives and managers in three multinational companies and their respective stakeholders. Raw data originating from interview tapes, field notes, and contact sheets was processed, stored, and managed using the software program QSR NVIVO 7. In the analysis, I applied qualitative methods to strengthen the interpretative part as well as quantitative methods to identify dominating dimensions and patterns. I found three different coping behaviors that provide insights into the corporate mindset. The results suggest that multinational corporations increasingly turn towards relational approaches of CSR to achieve moral legitimacy in formalized dialogical exchanges with their stakeholders since legitimacy can no longer be derived only from a national framework. I also looked at the degree to which they have reacted to the postnational constellation by the assumption of former state duties and the underlying reasoning. The findings indicate that CSR approaches become increasingly comprehensive through integrating political strategies that reflect the growing (self-) perception of multinational companies as political actors. Based on the results, I developed a model which relates the different dimensions of corporate responsibility to the discussion on deliberative democracy, global governance and social innovation to provide guidance for multinational companies in a postnational world. With my thesis, I contribute to management research by (i) delivering a comprehensive critique of the mainstream CSR-literature and (ii) filling the gap of thorough qualitative research on CSR in a globalizing world using the CSR-character as an empirical device, and (iii) to organizational studies by further advancing a deliberative view of the firm proposed by Scherer and Palazzo (2008).
Resumo:
Granular shoulders need to be maintained on a regular basis because edge ruts and potholes develop, posing a safety hazard to motorists. The successful mitigation of edge-rut issues for granular shoulders would increase safety and reduce the number of procedures currently required to maintain granular shoulders in Iowa. In addition, better performance of granular shoulders reduces the urgency to pave granular shoulders. Delaying or permanently avoiding paving shoulders where possible allows more flexibility in making investments in the road network. To stabilize shoulders and reduce the number of maintenance cycles necessary per season, one possible stabilizing agent—acidulated soybean oil soapstock—was investigated in this research. A pilot testing project was conducted for selected problematic shoulders in northern and northeastern Iowa. Soapstock was applied on granular shoulders and monitored during application and pre- and post-application. Application techniques were documented and the percentage of application success was calculated for each treated shoulder section. As a result of this research, it was concluded that soybean oil soapstock can be an effective stabilizer for granular shoulders under certain conditions. The researchers also developed draft specifications that could possibly be used to engage a contractor to perform the work using a maintenance-type construction contract. The documented application techniques from this project could be used as guidance for those who want to apply soapstock for stabilizing granular shoulders but might not be familiar with this technique.
Resumo:
The Electrical Examining Board is responsible for overseeing the licensing, permitting, inspection and continuing education requirements of the statewide electrician and electrical contractor program in Iowa. This issue review provides a summary of the program and a review of the current situation.
Resumo:
Background: This paper aimed to use the Delphi technique to develop a consensus framework for a multinational, workplace walking intervention. Methods: Ideas were gathered and ranked from eight recognized and emerging experts in the fields of physical activity and health, from universities in Australia, Canada, England, the Netherlands, Northern Ireland, and Spain. Members of the panel were asked to consider the key characteristics of a successful campus walking intervention. Consensus was reached by an inductive, content analytic approach, conducted through an anonymous, three-round, e-mail process. Results: The resulting framework consisted of three interlinking themes defined as “design, implementation, and evaluation.” Top-ranked subitems in these themes included the need to generate research capacity (design), to respond to group needs through different walking approaches (implementation), and to undertake physical activity assessment (evaluation). Themes were set within an underpinning domain, referred to as the “institution” and sites are currently engaging with subitems in this domain, to provide sustainable interventions that reflect the practicalities of local contexts and needs. Conclusions: Findings provide a unique framework for designing, implementing, and evaluating walking projects in universities and highlight the value of adopting the Delphi technique for planning international, multisite health initiatives.
Resumo:
There is an urgent need to complete projects in high traffic urban areas in the shortest possible time. These road user benefits resulting from faster construction will minimize public inconvenience, safety hazards and a total cost to the public. The incentive - disincentive clause in the contract will encourage the contractor to expedite all phases in the contract. A copy of this special provision is part of this work plan and other details of construction are included in the plan and specification of Project F-65-4(34)--20-77.
Resumo:
Background: Vorapaxar is a new oral protease-activatedreceptor 1 (PAR-1) antagonist that inhibits thrombin-induced platelet activation. Methods: In this multinational, double-blind, randomized trial, we compared vorapaxar with placebo in 12,944 patients who had acute coronary syndromes without ST-segment elevation. The primary end point was a composite of death from cardiovascular causes, myocardial infarction, stroke, recurrent ischemia with rehospitalization, or urgent coronary revascularization. RESULTS: Follow-up in the trial was terminated early after a safety review. After a median follow-up of 502 days (interquartile range, 349 to 667), the primary end point occurred in 1031 of 6473 patients receiving vorapaxar versus 1102 of 6471 patients receiving placebo (KaplanMeier 2-year rate, 18.5% vs. 19.9%; hazard ratio, 0.92; 95% confidence interval [CI], 0.85 to 1.01; P = 0.07). A composite of death from cardiovascular causes, myocardial infarction, or stroke occurred in 822 patients in the vorapaxar group versus 910 in the placebo group (14.7% and 16.4%, respectively; hazard ratio, 0.89; 95% CI, 0.81 to 0.98; P = 0.02). Rates of moderate and severe bleeding were 7.2% in the vorapaxar group and 5.2% in the placebo group (hazard ratio, 1.35; 95% CI, 1.16 to 1.58; P<0.001). Intracranial hemorrhage rates were 1.1% and 0.2%, respectively (hazard ratio, 3.39; 95% CI, 1.78 to 6.45; P<0.001). Rates of nonhemorrhagic adverse events were similar in the two groups. Conclusions: In patients with acute coronary syndromes, the addition of vorapaxar to standard therapy did not significantly reduce the primary composite end point but significantly increased the risk of major bleeding, including intracranial hemorrhage. (Funded by Merck; TRACER ClinicalTrials.gov number, NCT00527943.)
Resumo:
For the past several year Kossuth County has had a scheduled maintenance program of bituminous seal coating. This program has been used to maintain the 467 miles of asphaltic concrete surfaced roads in Kossuth County. Since most of the experience that Kossuth County had in seal coating was with cutback asphalt, it was decided to include the use of emulsified asphalt in Kossuth County's 1980 seal coat program. Federal Demonstration Project Funds were requested from the Federal Highway Administration to study the use of emulsified asphalt and funding was granted under Demonstration Project No. 55,:Asphalt Emulsions for Highway Construction." Items studied were design and construction procedure cost of alternate material, energy consumption and environmental considerations. A construction contract was awarded to Everds Brothers, Inc. of Algona, Iowa, on July 1, 1980. There were four bidders on the 54.5 miles of seal coating that was let. A map showing the location of the seal coating projects is shown in Appendix A, and a copy of the contract is shown in Appendix B. The contractor started the project on July 11, 1980 and completed the project on August 1, 1980. Construction inspection and follow-up inspections of the project were conducted by personnel of the Kossuth County Engineer's Office and testing of the materials, friction testing and road rater testing were conducted by the Material's Department of the Iowa Department of Transportation.
Resumo:
In 1982 the Iowa DOT allowed a successful bidder the option of submitting materials and proportions using fly ash to produce a portland cement concrete (PCC) paving mixture to meet a specified compressive strength. The contractor, Irving F. Jensen, received approval for the use of a concrete mixture utilizing 500 lbs. of portland cement and 88 lbs. of fly ash as a replacement of 88 lbs. of portland cement. The PCC mixture was utilized on the Muscatine County US 61 relocation bypass paved as project F-61-4(32)--20-70. A Class "C" fly ash obtained from the Chillicothe electric generating plant approximately 100 miles away was used in the project. This use of fly ash in lieu of portland cement resulted in a cost savings of $64,500 and an energy savings of approximately 16 billion BTU. The compressive strength of this PCC mixture option was very comparable to concrete mixtures produced without the use of fly ash. The pavement has been performing very well. The substitution of fly ash for 15% of the cement has been allowed as a contractor's option since 1984. Due to the cost savings, it has been used in almost all Iowa PCC paving since that time.
Resumo:
In conventional construction practices, a longitudinal joint is sawed in a PCC (Portland Cement Concrete) pavement to control concrete shrinkage cracking between two lanes of traffic. Sawing a joint in hardened concrete is an expensive and time consuming operation. The longitudinal joint is not a working joint (in comparison to a transverse joint) as it is typically tied with a tie bar at 30 inch spacing. The open joint reservoir, left by the saw blade, typically is filled or sealed with a durable crack sealant to keep incompressibles and water from getting into the joint reservoir. An experimental joint forming knife has been developed. It is installed under the paving machine to form the longitudinal joint in the wet concrete as a part of the paving process. Through this research method, forming a very narrow longitudinal joint during the paving process, two conventional paving operations can be eliminated. Joint forming eliminates the need of the joint sawing operation in the hard concrete, and as the joint that is formed does not leave a wide-open reservoir, but only a hairline crack, it does not need the joint filling or sealing operation. Therefore, the two conventional longitudinal joint sawing and sealing operations are both being eliminated by this innovation. A laboratory scale prototype joint forming knife was built and tested, initially forming joints in small concrete beams. The results were positive so the method was proposed for field testing. Initial field tests were done in the construction season of 2001, limited to one paving contractor. A number of modifications were made to the knife throughout the field tests. About 3000 feet of longitudinal joint was formed in 2001. Additional testing was done in the 2002 construction season, working with the same contractor. About 150,000 feet of longitudinal joint was formed in 2002. Evaluations of the formed joints were done to determine longitudinal joint hairline crack development rate and appearance. Additional tests will be done in the next construction season to improve or perfect the longitudinal joint forming technique.
Resumo:
The Falling Weight Deflectometer (FWD) has become the "standard" for deflection testing of pavements. Iowa has used a Road Rater since 1976 to obtain deflection information. A correlation between the Road Rater and the FWD was needed if Iowa was going to continue with the Road Rater. Comparative deflection testing was done using a Road Rater Model 400 and a Pynatest 8000 FWD on 26 pavement sections. The SHRP contractor, Braun Intertec Pavement, Inc., provided the FWD testing. The r^2 for the linear correlations ranged from 0.90 to 0.99 for the different pavement types and sensor locations.
Resumo:
The members of the Iowa Concrete Paving Association, the National Concrete Pavement Technology Center Research Committee, and the Iowa Highway Research Board commissioned a study to examine alternative ways of developing transverse joints in portland cement concrete pavements. The present study investigated six separate variations of vertical metal strips placed above and below the dowels in conventional baskets. In addition, the study investigated existing patented assemblies and a new assembly developed in Spain and used in Australia. The metal assemblies were placed in a new pavement and allowed to stay in place for 30 days before the Iowa Department of Transportation staff terminated the test by directing the contractor to saw and seal the joints. This report describes the design, construction, testing, and conclusions of the project.
Resumo:
This report describes test results from a full-scale embankment pilot study conducted in Iowa. The intent of the pilot project was to field test and refine the proposed soil classification system and construction specifications developed in Phase II of this research and to evaluate the feasibility of implementing a contractor quality control (QC) and Iowa DOT quality assurance (QA) program for earthwork grading in the future. One of the primary questions for Phase III is “Was embankment quality improved?” The project involved a “quality conscious” contractor, well-qualified and experienced Iowa Department of Transportation field personnel, a good QC consultant technician, and some of our best soils in the state. If the answer to the above question is “yes” for this project, it would unquestionably be “yes” for other projects as well. The answer is yes, the quality was improved, even for this project, as evidenced by dynamic cone penetrometer test data and the amount of disking required to reduce the moisture content to within acceptable control limits (approximately 29% of soils by volume required disking). Perhaps as important is that we know what quality we have. Increased QC/QA field testing, however, increases construction costs, as expected. The quality management-earthwork program resulted in an additional $0.03 per cubic meter, or 1.6%, of the total construction costs. Disking added about $0.04 per cubic meter, or 1.7%, to the total project costs. In our opinion this is a nominal cost increase to improve quality. It is envisioned that future contractor innovations have the potential for negating this increase. The Phase III results show that the new soil classification system and the proposed field test methods worked well during the Iowa Department of Transportation soils design phase and during the construction phase. Recommendations are provided for future implementation of the results of this study by city, county, and state agencies.
Resumo:
The Iowa Method for bridge deck overlays has been very successful in Iowa since its adoption in the 1970s. This method involves removal of deteriorated portions of a bridge deck followed by placement of a layer of dense (Type O) Portland Cement Concrete (PCC). The challenge encountered with this type of bridge deck overlay is that the PCC must be mixed on-site, brought to the placement area and placed with specialized equipment. This adds considerably to the cost and limits contractor selection, because not all contractors have the capability or equipment required. If it is possible for a ready-mix supplier to manufacture and deliver a dense PCC to the grade, then any competent bridge deck contractor would be able to complete the job. However, Type O concrete mixes are very stiff and generally cannot be transported and placed with ready-mix type trucks. This is where a “super-plasticizer” comes in to use. Addition of this admixture provides a substantial increase in the workability of the concrete – to the extent that it can be delivered to the site and placed on the deck directly out of a ready-mix truck. The objective of this research was to determine the feasibility of placing a deck overly of this type on county bridges within the limits of county budgets and workforce/contractor availability.
Resumo:
CONTEXT: Mortality among human immunodeficiency virus (HIV)-infected individuals has decreased dramatically in countries with good access to treatment and may now be close to mortality in the general uninfected population. OBJECTIVE: To evaluate changes in the mortality gap between HIV-infected individuals and the general uninfected population. DESIGN, SETTING, AND POPULATION: Mortality following HIV seroconversion in a large multinational collaboration of HIV seroconverter cohorts (CASCADE) was compared with expected mortality, calculated by applying general population death rates matched on demographic factors. A Poisson-based model adjusted for duration of infection was constructed to assess changes over calendar time in the excess mortality among HIV-infected individuals. Data pooled in September 2007 were analyzed in March 2008, covering years at risk 1981-2006. MAIN OUTCOME MEASURE: Excess mortality among HIV-infected individuals compared with that of the general uninfected population. RESULTS: Of 16,534 individuals with median duration of follow-up of 6.3 years (range, 1 day to 23.8 years), 2571 died, compared with 235 deaths expected in an equivalent general population cohort. The excess mortality rate (per 1000 person-years) decreased from 40.8 (95% confidence interval [CI], 38.5-43.0; 1275.9 excess deaths in 31,302 person-years) before the introduction of highly active antiretroviral therapy (pre-1996) to 6.1 (95% CI, 4.8-7.4; 89.6 excess deaths in 14,703 person-years) in 2004-2006 (adjusted excess hazard ratio, 0.05 [95% CI, 0.03-0.09] for 2004-2006 vs pre-1996). By 2004-2006, no excess mortality was observed in the first 5 years following HIV seroconversion among those infected sexually, though a cumulative excess probability of death remained over the longer term (4.8% [95% CI, 2.5%-8.6%] in the first 10 years among those aged 15-24 years). CONCLUSIONS: Mortality rates for HIV-infected persons have become much closer to general mortality rates since the introduction of highly active antiretroviral therapy. In industrialized countries, persons infected sexually with HIV now appear to experience mortality rates similar to those of the general population in the first 5 years following infection, though a mortality excess remains as duration of HIV infection lengthens.
Resumo:
Bridge construction projects are becoming increasingly complex as the demand for context-sensitive solutions, aesthetic designs, and accelerated bridge construction becomes more prevalent. In addition, the Iowa Department of Transportation (Iowa DOT) is entering a phase of design and construction of large border bridges, such as the I-80 (let 2008 for $56 million) and US 34 bridges over the Missouri River and I-74 over the Mississippi River. Compared to typical construction projects, these bridges generate more contractor Requests for Information (RFIs), Value Engineering (VE) proposals, Requests for Changes (RFCs), and shop drawings. Management of these submittals is a significant challenge for Resident Construction Engineers (RCEs) and other Iowa DOT staff. In addition, some submittals require cross-departmental and project consultant reviews. Commercially available software exists for managing submittals and project collaboration teams; in-house solutions may also be possible. Implementation is intended to speed construction submittal review time, reduce incidence of delay claims, and free up Iowa DOT staff from project management administrative tasks. Researchers from Iowa State University working with the Iowa DOT conducted a multi-pronged approach to indentify a web-based collaboration solution for Iowa DOT bridge projects. An investigation was launched to determine the functional needs of the Iowa DOT. Commercially available software programs were also evaluated to find what functionality is currently available. A Request for Proposals (RFP) was written to select a commercial web-based collaboration solution for pilot testing. In the second phase of research, a solution will be selected and implemented on two pilot projects. Lessons learned from these pilot projects will assist the Iowa DOT in developing and implementing a long-term solution to improve the management of Iowa DOT bridge projects.