868 resultados para infrastructure charges
Resumo:
Following transcription and splicing, each mRNA of a mammalian cell passes into the cytoplasm where its fate is in the hands of a complex network of ribonucleoproteins (mRNPs). The success or failure of a gene to be expressed depends on the performance of this mRNP infrastructure. The entry, gating, processing, and transit of each mRNA through an mRNP network helps determine the composition of a cell's proteome. The machinery that regulates storage, turnover, and translational activation of mRNAs is not well understood, in part, because of the heterogeneous nature of mRNPs. Recently, subsets of cellular mRNAs clustered as members of mRNP complexes have been identified by using antibodies reactive with RNA-binding proteins, including ELAV/Hu, eIF-4E, and poly(A)-binding proteins. Cytoplasmic ELAV/Hu proteins are involved in the stability and translation of early response gene (ERG) transcripts and are expressed predominately in neurons. mRNAs recovered from ELAV/Hu mRNP complexes were found to have similar sequence elements, suggesting a common structural linkage among them. This approach opens the possibility of identifying transcripts physically clustered in vivo that may have similar fates or functions. Moreover, the proteins encoded by physically organized mRNAs may participate in the same biological process or structural outcome, not unlike operons and their polycistronic mRNAs do in prokaryotic organisms. Our goal is to understand the organization and flow of genetic information on an integrative systems level by analyzing the collective properties of proteins and mRNAs associated with mRNPs in vivo.
Resumo:
A scanning force microscope was converted to an electrostatic force microscope by charging the usually neutral cantilever with phospholipids. The electrostatic force microscope was used to study surface electrostatic charges of samples in aqueous solutions. Lysozymes, DEAE-Sephadex beads, 3-propyltriethoxysilane-treated glass and mica were imaged in water or phosphate buffer with electrostatic force microscopy. The adhesion force measured when a charged probe and oppositely charged specimen interacted was up to 500 times greater than when a bare probe was used. This dramatic increase in measured adhesion force can be attributed to the energy required to break the salt bridges formed between the charged probe and the specimen. The use of phospholipids to functionalize the cantilever tip allows the incorporation of other biomolecules and ligands that can be used as biologically specific tips (e.g., receptors, drugs) for the study of intermolecular interactions.
Resumo:
Handwritten account book kept while Storer was a student at Harvard College. The well-organized volume is arranged by expense type and then date and was updated periodically, usually quarterly. The information offers a glimpse at the expenses of a Harvard student and provides information about the larger community that supported student life. The precise entries indicate the lifelong habits of Storer as a careful and methodical financial manager that would prove so valuable when he served as Harvard's treasurer more than thirty years later. Storer documents accounts with the steward, butler, sweeper, glazier, barber, and lists these individuals by name. The volume also includes notes on expenses for boarding, transportation, wood, and pocket expenses. While most entries do not list specific purchases, Storer provides details on the cost of a Harvard Commencement in 1747 (including the cost of a diploma, money to the President, hiring a house, a boat, a woman, and "2 Negroes"), and a specific accounting of the different food purchased for the event; Storer also lists expenses for an 1748 "supper for the graduates."
Resumo:
Two pages with calculations and notes relating to the differences between the Estate Book and the account rendered by the Judge of Probate.
Resumo:
Being able to transport electricity seamlessly across borders is essential for achieving three major European Union energy policy goals: (1) enabling competition between national energy companies, (2) cost-effective roll-out of renewables,and (3) security of supply. However, neither the market design nor the framework for infrastructure investment proposed by the European Commission is adequate for enabling free flows of electricity within the EU.