Twelve-Mile Lake is an 800-acre man-made lake in central Union County. The watershed has 13,964 land acres that are used by farmers for row crops and pasture. This lake is used as a water supply source for the City of Creston and the Southern Iowa Rural Water Association. In total approximately 40,000 people are affected by this project. Developed over 20 years ago, the lake and fishery was renovated and restocked and much of the shoreline was riprapped about six years ago. During its history, extensive watershed efforts have been ongoing. However, as farmland for cropland has become more valuable and demand has increased, hilly land once used for dairy farming, grazing, and CRP has been put into row crop production. Consequently, sediment loss has become an increasing issue for farmers, conservation professionals, and the Creston Waterworks Department, which owns the water treatment facility at the lake. In 2011, the Creston Water Board received a WIRB grant to implement a sedimentation structure at the north end of the main channel flowing into the lake. The WIRB funds were used for land acquisition, with the IDNR actually constructing the facility. This report depicts work performed as part of the WIRB project.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The Rathbun Land and Water Alliance and partners have undertaken a highly effective approach to water quality protection through the Rathbun Lake Special Project. This approach is achieving a significant reduction in the sediment and phosphorus that impair water quality in Rathbun Lake and its tributaries as a result of the targeted application of best management practices (BMPs) for priority land in the watershed. This application proposes to assist landowners to apply BMPs that will reduce sediment and phosphorus delivery from priority land in targeted sub-watersheds as part of the Rathbun Lake Special Project. Features of this project are: (1) use of geographic information system (GIS) analysis to identify priority land that requires BMPs; (2) assistance for landowners to apply BMPs for 4,000 acres that will reduce the annual delivery of sediment by 6,000 tons and phosphorus by 20,000 pounds; (3) evaluation of the benefits from BMP application using GIS analysis and water quality monitoring; and (4) watershed outreach activities that encourage landowners to apply BMPs for priority land to protect water quality.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The Buena Vista SWCD is submitting this WIRB request on behalf of both Buena Vista and Pocahontas SWCDs. The two SWCDs are working jointly on a project that includes three existing Mississippi River Basin Imitative (MRBI) project areas in the North Raccoon River Watershed. The total project area is 280,654 crop acres. The MRBI project involves installing conservation practices through the EQIP program. Funding from MRBI will support costs of practice design, layout and checkout, however, there is no funding to market and sell the program and practices to landowners and producers in the project area. Both soil and water districts are financially supporting work currently being done to encourage signup for the approved practices. To effectively implement the MRBI project it is imperative that marketing and promotion through group meetings and one-on­ one contacts is completed. Funding from WIRB will allow the existing employee to spend the needed time on these promotional activities in both Buena Vista and Pocahontas County. Through this WIRB request these two SWCDs districts plan to apply over $800,000 worth of conservation practices that is funded through the MRBI program. The return from this investment of WIRB dollars is large. This is an opportunity to support a large amount of conservation work in the North Raccoon River Watershed, which, is also an important water source for the city Des Moines and provides recreational activities from Des Moines up to BY and Pocahontas Counties.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The primary goal of the Hewitt Creek watershed council is to have Hewitt-Hickory Creek removed from the Iowa impaired waters (303d) list. Hewitt Creek watershed, a livestock dense 23,005 acre sub-watershed of the Maquoketa River Basin, is 91.2% agricultural and 7.5% woodland. Since 2005, sixty-seven percent of 84 watershed farm operations participated in an organized watershed improvement effort using a performance­ based watershed management approach, reducing annual sediment delivery to the stream by 4,000 tons. Watershed residents realize that water quality improvement efforts require a long-term commitment in order to meet their watershed improvement goals and seek funding for an additional five years to continue their successful watershed improvement project. Cooperators will be provided incentives for improved environmental performance, along with incentives and technical support to address feedlot runoff issues and sub-surface nitrate-nitrogen loss. The Phosphorus Index, Soil Conditioning Index and cornstalk nitrate test will be used by producers as measures of performance to refine nutrient and soil loss management and to determine effective alternatives to reduce nutrient and sediment delivery. Twenty-five livestock operations will improve feedlot runoff control systems and five sub-surface bioreactors will be installed to reduce nitrate delivery from priority tile-drained fields. The Hewitt Creek council will seek additional cost-share funding for high-cost feedlot runoff control structures, sediment control basins and stream bank stabilization projects.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Mixture materials, mix design, and pavement construction are not isolated steps in the concrete paving process. Each affects the other in ways that determine overall pavement quality and long-term performance. However, equipment and procedures commonly used to test concrete materials and concrete pavements have not changed in decades, leaving gaps in our ability to understand and control the factors that determine concrete durability. The concrete paving community needs tests that will adequately characterize the materials, predict interactions, and monitor the properties of the concrete. The overall objectives of this study are (1) to evaluate conventional and new methods for testing concrete and concrete materials to prevent material and construction problems that could lead to premature concrete pavement distress and (2) to examine and refine a suite of tests that can accurately evaluate concrete pavement properties. The project included three phases. In Phase I, the research team contacted each of 16 participating states to gather information about concrete and concrete material tests. A preliminary suite of tests to ensure long-term pavement performance was developed. The tests were selected to provide useful and easy-to-interpret results that can be performed reasonably and routinely in terms of time, expertise, training, and cost. The tests examine concrete pavement properties in five focal areas critical to the long life and durability of concrete pavements: (1) workability, (2) strength development, (3) air system, (4) permeability, and (5) shrinkage. The tests were relevant at three stages in the concrete paving process: mix design, preconstruction verification, and construction quality control. In Phase II, the research team conducted field testing in each participating state to evaluate the preliminary suite of tests and demonstrate the testing technologies and procedures using local materials. A Mobile Concrete Research Lab was designed and equipped to facilitate the demonstrations. This report documents the results of the 16 state projects. Phase III refined and finalized lab and field tests based on state project test data. The results of the overall project are detailed herein. The final suite of tests is detailed in the accompanying testing guide.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The Federal Highway Administration published the final rule updating 23 CFR 630 Subpart J in September 2004. The revised rule requires agencies using federal funding to address both safety and mobility in planning and construction of roadway improvements. The Iowa Department of Transportation (Iowa DOT) requested the assistance of the Center for Transportation and Research in developing guidance for a policy and procedures to comply with the final rule. This report describes an in-depth examination of current Iowa DOT project development processes for all types of improvements, including maintenance, as well as a detailed characterization of work zone impact considerations throughout project completion. To comply with both the letter and perceived intent of the final rule on safety and mobility, the report features a suggested work zone policy statement and suggested revisions in the Iowa DOT project development processes, including a definition of the key element: significant projects.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Williamson Pond is a 26-acre publicly owned lake located about 2 miles east of the town of Williamson, in Lucas County. It has a watershed area of 1,499 acres. It has been managed since 1976 by the Lucas County Conservation Board (while still under state ownership) for fishing, boating, hunting, picnicking and other passive uses. Designated uses are Class AI, primary contact, and Class B (LW) aquatic life. Williamson Pond is on the 2004 EPA 303(d) List of Impaired Waters. A Total Maximum Daily Load (TMDL) for turbidity and nutrients at Williamson Pond was prepared by IDNR in 2005 and approved by EPA in 2006. The TMDL set reduction targets for both suspended sediment and phosphorus. The Williamson Pond Watershed Management Plan has provided the local work group and partners with information to develop and implement strategies to improve and protect water quality. These strategies are based on a three phase approach that will ultimately lead the removal of Williamson Pond from the Impaired Waters List. The goals identified in this proposal (Phase I) will reduce sediment and phosphorus delivery by 453 tons and 589 pounds annually. The Lucas County SWCD has and will continue to provide leadership on the Williamson Pond Project and has secured the partnerships necessary to address water quality problems and hired a part-time project coordinator to manage, implement, and oversee all activities pertaining to this proposal.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The Dry Run Creek Watershed received a biological impairment in 2002 after sampling conducted by the Department of Natural Resources revealed a lack in the diversity and abundance of aquatic life along a 2.8 mile reach of stream along the Southwest Branch. Among the primary stressors identified were hydrologic change, increased stormsewer inputs, lack of available habitat, and sedimentation. Goals put forth by the Watershed Management Plan and the preliminary Total Maximum Daily Load (TMDL) study center around the reduction in storm sewer inputs. The goal set forth by the TMDL is the reduction of connected impervious surface (CIS) to 10% in each of the creek’s subwatersheds as a surrogate for other stressors. Grant funding is being sought for the construction of two bioretention cells and a green roof to treat the first flush of runoff from a new 400 unit student housing structure and connected parking surfaces totaling 5.16 acres. In addition, a monitoring program will continue to be coordinated through a partnership with the Department of Natural Resources IOWATER program and locally led volunteer efforts which will allow us to track the progress of the watershed. Funding for administration, outreach, and assessment will be provided through existing 319 grants. Implementation of these practices will occur in phases over the course of a two year period.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The Duck Creek watershed has been the target study area of multiple reports by multiple agencies including a 2009 DNR Watershed Master Planning Grant, and the 2011 Duck and Blackhawk Creek Stream Assessment. The information obtained from these reports has lead the City of Davenport to take a micro-watershed approach to identifying the significant contributors to flooding and water quality issues that affect Duck Creek, its tributaries and the surrounding landscape, and devise solutions to mitigate these concerns. The construction of the proposed Littig Area Detention Basin comes as a recommendation from the Comprehensive Stormwater Management Plan for Pheasant, Goose, and Silver Creeks as prepared by James M. Montgomery, Consulting Engineers, Inc. in September 1991. At the time this report was prepared this basin was one of eight regional detention basins proposed in the upstream watersheds to alleviate flooding on tributaries to Duck Creek. The basin is designed and situated to detain runoff from approximately two hundred and twenty-seven (227) acres of previously developed moderate density residential area with intermixed light business and schools. This basin will reduce flow rates entering the receiving waters from the two, five and ten year storm events by an average of eighty-five percent (85%) and reduce flow rates from the twenty-five, fifty, and one hundred year events by a11 average of fifty percent (50%). With this flow rate reduction it is anticipated that streambank erosion in the immediate downstream receiving waters can be reduced or even stopped. The reduction in sediment leaving this upstream area will greatly enhance the water quality further downstream in Goose and Duck Creeks.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Lake Icaria is a 660 acre man-made lake in rural Adams County. Lake Icaria is a popular recreational attraction providing ample fishing, boating, and swimming opportunities. Constructed in 1977 for water supply, Lake lcaria continues to provide reliable drinking water to 1,900 households in Adams and Montgomery counties. No stranger to the water quality world, Lake Icaria was the primary lake in the 3Lakes Water Quality Project(1996-2004), an eight year water quality effort which came to be known as one oflowa's first great water quality successes. At time of construction the Lake Icaria watershed was primarily grass. A shift towards maximizing crop production in the 1980's brought about the end of dairy farms and a concern for sediment loss and how that would affect water quality. This change in land use set the stage for the first water quality project at Lake Icaria. Since the conclusion of the 3Lakes Water Quality Project in 2004land use in the watershed has made yet another monumental shift towards crop production. Nearly 2,000 acres ofland that was once in the conservation reserve program is now being planted to a crop. This change in land use has once again brought about serious concerns for the quality of water being provided by Lake Icaria.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Silver Creek is a warm water stream resource located in one of the most intensely cropped portions of Clayton County. The stream has been included on Iowa’s 303(d) list of impaired waters since 2002. Aquatic life, which should be present in Silver Creek, isn’t there. According to the Draft Total Maximum Daily Load (TMDL) for Silver Creek, the primary nonpoint pollution sources are soil erosion from agricultural land uses and direct deposition of ammonia by livestock with access to the stream. The Clayton Soil & Water Conservation District has begun efforts to remove Silver Creek from the impaired waters list. The District has promoted stream corridor and sinkhole protection, and the installation of buffer practices along Silver Creek and its tributaries. Conservation practices have been targeted to crop fields to reduce sediment delivery to the stream. A series of news articles, newsletters, and field days have been utilized to increase public understanding of water quality issues. Landowner interest has outweighed available cost share resources. Additional financial support will allow the project to build upon its early successes, to further address the identified impairments, and to respond to a long list of landowners that are interested in conservation work on their farms.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This is a crucial transition time for human genetics in general, and for HIV host genetics in particular. After years of equivocal results from candidate gene analyses, several genome-wide association studies have been published that looked at plasma viral load or disease progression. Results from other studies that used various large-scale approaches (siRNA screens, transcriptome or proteome analysis, comparative genomics) have also shed new light on retroviral pathogenesis. However, most of the inter-individual variability in response to HIV-1 infection remains to be explained: genome resequencing and systems biology approaches are now required to progress toward a better understanding of the complex interactions between HIV-1 and its human host.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Purpose: 1. To review Ct features suggestive of saprophytic aspergillosis (aspergilloma) and to correlate them with the final pathological results. 2. To illustrate the wide range of differential diagnosis. Methods and materials: The electronic database of our department from 1995 to 2007 revealed CT reports of 48 patients that had been considered very suggestive of aspergilloma. Two radiologists with 6 and 12 years experience in thoracic radiology jointly reviewed the corresponding CT features including ancillary findings and the underlying lung diseases and correlated them with the final pathological diagnosis. Results: Forty patients could be included in the study (12 women, mean age 52), while in 8 patients there was no adequate clinical follow-up. In 17 patients the diagnosis "mycetoma" due to aspergillus fumigatus infection was confirmed, either by surgery, biopsy or bronchoscopy. In 23 patients, differential diagnoses were found, such as cavitating bronchial carcinoma (n = 7), bacterial abscess (n = 3), typical (n = 2) and atypical (n = 2) tuberculosis, as well as inflammatory changes due to mucoviscidosis (n = 1), Wegener's disease (n = 1) or chronic obstructive pulmonary disease (n = 3). Fibromyxoide hamartoma, lung infarction and bronchomucocele were responsible for the typical CT feature in one patient each. Conclusion: 1. The typical CT feature suggesting mycetoma is softtissue proliferation within a pre-existing wall-thickened lung cavity, oten even considered "pathognomonic". However, this diagnosis was finally confirmed by surgery or laboratory findings in less than 50% of patients only. 2. Since differential diagnoses are very large, not only including cavitating lung cancer and tuberculosis, the individual underlying lung disease needs strongly being taken into account often giving the best clue for the correct diagnosis.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Little River Lake watershed is a 13,305 acre subwatershed of Little River. The 788 acre lake was listed as a 303d impaired water body in 2008 due to elevated turbidity and algae levels. The Decatur SWCD has prioritized water quality protection efforts within the Little River Lake watershed because 1) portions of this watershed has been identified as the primary contributor of sediment and nutrients to Little River Lake, which provides an essential source of drinking water for Decatur County and the Southern Iowa Rural Water Association; 2) the watershed provides exemplary education and project interpretation opportunities due to its proximity to Little River Lake Recreation Area, and 3) by using targeted and proven soil conservation practices to address water quality deficiencies the probability of successfully attenuating soil erosion and ameliorating water quality impairments is enhanced. The specific goals of this proposal are to: 1. reduce annual sediment, and phosphorous delivery to the lake by 11,280 tons and 14,664 lbs., respectively, via applications of conservation practices on targeted agricultural land; 2. delist the lake as an EPA 303d impaired water body via water quality enhancement; 3. obtain a “Full Support” status for the lake’s aquatic life and recreational use; 4. reduce potable water treatment costs (minimum 50% cost reduction) associated with high suspended solid levels; and 5. restore a viable sport-fish population, thereby bolstering tourism and the economy. To achieve timely project implementation the Decatur SWCD has cooperated with the IDNR Watershed Improvement Section, Fisheries Bureau, and IDALS-DSC to assess extant water quality and watershed conditions, coalesced a diverse team of committed partners and secured matching funding from multiple sources.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The Tuttle Lake Watershed is approximately 125,000 acres and Tuttle Lake itself is 2,270 acres; 5,609 acres of the watershed lies in Iowa territory within Emmet County. It is a sub-watershed of the larger East Fork Des Moines River Watershed, also referred to as Hydrologic Unit Code 07100003. For the purpose of this document, grant money is only being applied for the project implementation in the Iowa portion of the Tuttle Lake Watershed. Tuttle Lake was placed on the 2002 EPA 303(d) Impaired Waters List due to a “very large population of suspended algae and very high levels of inorganic turbidity.” In 2004, the Iowa Department of Natural Resources (IDNR) completed a Total Maximum Daily Load (TMDL) study on Tuttle Lake and found excess sediment and phosphorus levels being the primary pollutants causing the algae and turbidity impairment. Although two point sources were located in Minnesota, IDNR determined that the influx of nutrients is likely from agricultural runoff and re-suspension of lake sediment. The condition of Tuttle Lake is such that the reduction of sediment, nutrients [phosphorus and nitrogen] and pathogens is the primary objective. To achieve that objective, wetlands will be constructed in this first phase to reduce the delivery of nitrogen, phosphorus, and sediment to Tuttle Lake.