924 resultados para Sound Duration
Resumo:
OBJECTIVES We sought to analyze the time course of atrial fibrillation (AF) episodes before and after circular plus linear left atrial ablation and the percentage of patients with complete freedom from AF after ablation by using serial seven-day electrocardiograms (ECGs). BACKGROUND The curative treatment of AF targets the pathophysiological corner stones of AF (i.e., the initiating triggers and/or the perpetuation of AF). The pathophysiological complexity of both may not result in an "all-or-nothing" response but may modify number and duration of AF episodes. METHODS In patients with highly symptomatic AF, circular plus linear ablation lesions were placed around the left and right pulmonary veins, between the two circles, and from the left circle to the mitral annulus using the electroanatomic mapping system. Repetitive continuous 7-day ECGs administered before and after catheter ablation were used for rhythm follow-up. RESULTS In 100 patients with paroxysmal (n = 80) and persistent (n = 20) AF, relative duration of time spent in AF significantly decreased over time (35 +/- 37% before ablation, 26 +/- 41% directly after ablation, and 10 +/- 22% after 12 months). Freedom from AF stepwise increased in patients with paroxysmal AF and after 12 months measured at 88% or 74% depending on whether 24-h ECG or 7-day ECG was used. Complete pulmonary vein isolation was demonstrated in <20% of the circular lesions. CONCLUSIONS The results obtained in patients with AF treated with circular plus linear left atrial lesions strongly indicate that substrate modification is the main underlying pathophysiologic mechanism and that it results in a delayed cure instead of an immediate cure.
Resumo:
OBJECTIVE To compare speech understanding of the BAHA BP110 and BAHA Intenso sound processors. STUDY DESIGN Prospective experimental study. SETTING Tertiary referral center. PATIENTS Twenty experienced user of osseointegrated auditory implants with conductive or mixed hearing loss. INTERVENTIONS In a first session, half of the participants were fitted with an Intenso, the other half with a BP110. After 1 month of use, aided speech understanding in quiet and in noise was measured, and the other test processor was fitted. One month later, speech understanding with the second sound processor was assessed. MAIN OUTCOME MEASURES Speech understanding in quiet and in noise, with noise arriving either from the front, the rear, or the side of the user with the osseointegrated bone conductor. RESULTS Significant improvements were found for both processors for speech understanding in quiet (+9.6 to +34.8 percent points; p = 0.02 to 0.001) and in noise (+6.2 to +13.8 dB, p < 0.001). No significant differences were found between the 2 devices for speech in quiet. For noise from the rear, subjects were able to understand speech at signal-to-noise ratios which were lower (less favorable) by -5.1 dB (p < 0.001) when compared with the Intenso. CONCLUSION Speech understanding is substantially improved by both devices, with no significant differences between the sound processors in quiet. In noise, speech understanding is significantly better with the BP110 when compared to the Intenso for noise from the rear.
Resumo:
Objective: There is an ongoing debate concerning how outcome variables change during the course of psychotherapy. We compared the dose–effect model, which posits diminishing effects of additional sessions in later treatment phases, against a model that assumes a linear and steady treatment progress through termination. Method: Session-by-session outcome data of 6,375 outpatients were analyzed, and participants were categorized according to treatment length. Linear and log-linear (i.e., negatively accelerating) latent growth curve models (LGCMs) were estimated and compared for different treatment length categories. Results: When comparing the fit of the various models, the log-linear LGCMs assuming negatively accelerating treatment progress consistently outperformed the linear models irre- spective of treatment duration. The rate of change was found to be inversely related to the length of treatment. Conclusion: As proposed by the dose–effect model, the expected course of improvement in psychotherapy appears to follow a negatively accelerated pattern of change, irrespective of the duration of the treatment. However, our results also suggest that the rate of change is not constant across various treatment lengths. As proposed by the “good enough level” model, longer treatments are associated with less rapid rates of change.
Resumo:
Abstract Objectives: HIV 'treatment as prevention' (TasP) describes early treatment of HIV-infected patients intended to reduce viral load and transmission. Crucial assumptions for estimating TasP's effectiveness are the underlying estimates of transmission risk. We aimed to determine transmission risk during primary infection, and of the relation of HIV transmission risk to viral load. Design: A systematic review and meta-analysis. Methods: We searched PubMed and Embase databases for studies that established a relationship between viral load and transmission risk, or primary infection and transmission risk, in serodiscordant couples. We analysed assumptions about the relationship between viral load and transmission risk, and between duration of primary infection and transmission risk. Results: We found 36 eligible articles, based on six different study populations. Studies consistently found that larger viral loads lead to higher HIV transmission rates, but assumptions about the shape of this increase varied from exponential increase to saturation. The assumed duration of primary infection ranged from 1.5 to 12 months; for each additional month, the log10 transmission rate ratio between primary and asymptomatic infection decreased by 0.40. Conclusion: Assumptions and estimates of the relationship between viral load and transmission risk, and the relationship between primary infection and transmission risk, vary substantially and predictions of TasP's effectiveness should take this uncertainty into account.
Resumo:
Evidence suggests a strong relation between superior motor performance and the duration of the last fixation before movement initiation (called Quiet Eye, QE). Although this phenomenon proves to be quite robust, to date, only little is known about its functional role. Therefore, in two experiments, a novel paradigm is introduced, testing the QE as independent variable by experimentally manipulating the duration of the last fixation in a throwing task. In addition, this paradigm allowed for the manipulation of the predictability of the target position. Results of the first study revealed an increase in throwing accuracy as function of experimentally prolonged QE durations. Thus, the assumption that the QE does not surface as a mere by-product of superior performance could be confirmed. In the second study, this dependency was found only under high task-demand conditions in which the target position was not predictable. This finding confirms the hypothesis that it is the optimization of information processing which serves as the crucial mechanisms behind QE effects.
Resumo:
The Parry Sound domain is a granulite nappe-stack transported cratonward during reactivation of the ductile lower and middle crust in the late convergence of the Mesoproterozoic Grenville orogeny. Field observations suggest the following with respect to the ductile sheath: (1) Formation of a carapace of transposed amphibolite facies gneiss derived from and enveloping the western extremity of the Parry Sound domain and separating it from high-strain gneiss of adjacent allochthons. This ductile sheath formed dynamically around the moving granulite nappe through the development of systems of progressively linked shear zones. (2) Transposition initiated by hydration (amphibolization) of granulite facies gneiss by introduction of fluid along cracks accompanying pegmatite emplacement. Shear zones nucleated along pegmatite margins and subsequently linked and rotated. The source of the pegmatites was most likely subjacent migmatitic and pegmatite-rich units or units over which Parry Sound domain was transported. Comparison of gneisses of the ductile sheath with high-strain layered gneiss of adjacent allochthons show the mode of transposition of penetratively layered gneiss depended on whether or not the gneiss protoliths were amphibolite or granulite facies tectonites before initiation of transposition, resulting in, e.g., folding before shearing, no folding before shearing, respectively. Meter-scale truncation along high-strain gradients at the margins of both types of transposition-related shear zones observed within and marginal to Parry Sound domain mimic features at kilometer scales, implying that apparent truncation by transposition originating in a manner similar to the ductile sheath may be a common feature of deep crustal ductile reworking. Citation: Culshaw, N., C. Gerbi, and J. Marsh (2010), Softening the lower crust: Modes of syn-transport transposition around and adjacent to a deep crustal granulite nappe, Parry Sound domain, Grenville Province, Ontario, Canada, Tectonics, 29, TC5013, doi:10.1029/2009TC002537.
Resumo:
Microsoft Project is one of the most-widely used software packages for project management. For the scheduling of resource-constrained projects, the package applies a priority-based procedure using a specific schedule-generation scheme. This procedure performs relatively poorly when compared against other software packages or state-of-the-art methods for resource-constrained project scheduling. In Microsoft Project 2010, it is possible to work with schedules that are infeasible with respect to the precedence or the resource constraints. We propose a novel schedule-generation scheme that makes use of this possibility. Under this scheme, the project tasks are scheduled sequentially while taking into account all temporal and resource constraints that a user can define within Microsoft Project. The scheme can be implemented as a priority-rule based heuristic procedure. Our computational results for two real-world construction projects indicate that this procedure outperforms the built-in procedure of Microsoft Project