885 resultados para Projects in dispute


Relevância:

80.00% 80.00%

Publicador:

Resumo:

Requests all state departments and agencies to consider using Project Labor Agreements on large-scale construction projects to provide structure and stability, promote efficient, on-time completion and ensure the high standards and reasonable costs on the projects in order to move Iowa’s economy forward.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Special Points of Interest: • The Division of Soil Conservation celebrated its 70th anniversary July 1, 2009. The Iowa Soil Conservation: Laws were enacted in 1939 creating the state soil conservation agency and governing committee and providing for the creation of Iowa’s 100 soil and water conservation districts. • The Mines & Minerals Bureau, through the federal Abandoned Mine Land (AML) Program, worked with various watershed groups to again secure an additional $1 million dollars in funding for the construction on projects in Marion, Mahaska and Monroe Counties. • Iowa hosted the Mississippi River/Gulf of Mexico Hypoxia Task Force tour and meeting in September 2009.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

This report, entitled “Iowa Highway Research Board Research and Development Activities FY 2010” is submitted in compliance with Sections 301.35 and 312.3A, Code of Iowa, which direct the submission of a report of the Secondary Road Research Fund and the Street Research Fund, respectively. T is a report of the status of research and development projects in progress on June 20, 2010. It is also a report on projects completed during the fiscal year beginning July 1, 2009, and ending June 30, 2010. Detailed information on each of the research and development projects mentioned in this report is available from the Research and Technology Bureau, Highway Division, Iowa Department of Transportation. All approved reports are also online for viewing at www.iowadot.gov/operationsresearch/reports.aspx

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Partant de deux études de cas, le projet de Frente Ribeirinha à Porto (Portugal) et celui d'Euroméditerranée à Marseille, ce projet de thèse a pour objectif l'étude des modalités de valorisation du tissu bâti (patrimonialisation) par les acteurs institutionnels dans les projets de régénération urbaine. Suivant l'hypothèse de l'entrée dans un nouveau régime de patrimonialité, l'analyse doit expliciter les stratégies à l'oeuvre ainsi que la manière dont les autorités publiques influent sur les représentations de l'espace construit. Abordant la question des échelles d'intervention des projets de régénération urbaine à partir des deux études de cas, mais également de littératures sur des projets anglo-saxons, la thèse cherche à voir, au prisme de la construction patrimoniale, comment ces projets sont directement connectés à l'économie internationale et au phénomène de globalisation et s'ils prennent en compte l'échelle du quotidien et de la domesticité. Il s'agit de montrer les limites d'une valorisation du tissu bâti dans un objectif de retombées économiques (ville consommable) au détriment des valeurs d'usage et de signifiants du quotidien. D'où l'hypothèse de l'importance d'une prise en compte des représentations de valeurs aux différentes échelles (dimensions socio-culturelles du projet de régénération) pour un équilibre qualitatif dans la fabrication du territoire et des projets sur le long terme. La volonté est sensiblement la compréhension des nouvelles constructions patrimoniales ainsi que des pratiques de conception et de mise en oeuvre du projet urbain. - Based on two case studies, the Frente Ribeirinha project in Porto (Portugal) and Euroméditerranée in Marseille, this research project aims at studying the modes of enhancement of the built fabric by institutional actors in urban regeneration projects. Posing the idea of a new heritage regime, this analysis attempts to explain the different strategies at work and how public authorities influence the built space's representations. Looking at the different scales of intervention of regeneration projects in our two case studies, as well as Anglo-Saxon literature on projects, it seeks at seeing, through heritage processes, how these projects are directly connected to the international economy and the phenomenon of globalization. Also, it aims at investigating whether policies take into account the scale of everyday life and domesticity. It attempts to show the limit of a built fabric's valuation with economic benefits objectives (consumable city) rather than taking into account values and meanings of everyday life. Hence, the thesis suggests taking into account representations and values at different scales (socio-cultural dimensions of the regeneration project) for a qualitative balance in urban planning and urban projects' manufacturing. The aim is to broaden the understanding on heritage construction, on urban design practices and on implementation of urban projects.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

With the support of the Iowa Fly Ash Affiliates, research on reclaimed fly ash for use as a construction material has been ongoing since 1991. The material exhibits engineering properties similar to those of soft limestone or sandstone and a lightweight aggregate. It is unique in that it is rich in calcium, silica, and aluminum and exhibits pozzolanic properties (i.e. gains strength over time) when used untreated or when a calcium activator is added. Reclaimed Class C fly ashes have been successfully used as a base material on a variety of construction projects in southern and western Iowa. A pavement design guide has been developed with the support of the Iowa Fly Ash Affiliates. Soils in Iowa generally rate fair to poor as subgrade soils for paving projects. This is especially true in the southern quarter of the state and for many areas of eastern and western Iowa. Many of the soil types encountered for highway projects are unsuitable soils under the current Iowa DOT specifications. The bulk of the remaining soils are Class 10 soils. Select soils for use directly under the pavement are often difficult to find on a project, and in many instances are economically unavailable. This was the case for a 4.43-mile grading (STP-S- 90(22)-SE-90) and paving project in Wapello County. The project begins at the Alliant Utilities generating station in Chillicothe, Iowa, and runs west to the Monroe-Wapello county line. This road carries a significant amount of truck traffic hauling coal from the generating station to the Cargill corn processing plant in Eddyville, Iowa. The proposed 10-inch Portland Cement Concrete (PCC) pavement was for construction directly on a Class 10 soil subgrade, which is not a desirable condition if other alternatives are available. Wapello County Engineer Wendell Folkerts supported the use of reclaimed fly ash for a portion of the project. Construction of about three miles of the project was accomplished using 10 inches of reclaimed fly ash as a select fill beneath the PCC slab. The remaining mile was constructed according to the original design to be used as a control section for performance monitoring. The project was graded during the summers of 1998 and 1999. Paving was completed in the fall of 1999. This report presents the results of design considerations and laboratory and field testing results during construction. Recommendations for use of reclaimed fly ash as a select fill are also presented.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

The Highway Division of the Iowa DOT engages in research and development for two reasons: first, to find workable solutions to the many problems that require more than ordinary, routine investigation; and second, to identify and implement improved engineering and management practices. This report, entitled ―Iowa Highway Research Board Research and Development Activities FY2011‖ is submitted in compliance with Sections 310.36 and 312.3A, Code of Iowa, which direct the submission of a report of the Secondary Road Research Fund and the Street Research Fund, respectively. It is a report of the status of research and development projects in progress on June 30, 2011. It is also a report on projects completed during the fiscal year beginning July 1, 2010 and ending June 30, 2011. Detailed information on each of the research and development projects mentioned in this report is available from the Research and Technology Bureau, Highway Division, Iowa Department of Transportation. All approved reports are also online for viewing at: www.iowadot.gov/operationsresearch/reports.aspx.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Special Points of Interest: • The Division of Soil Conservation celebrated its 70th anniversary July 1, 2009. The Iowa Soil Conservation Laws were enacted in 1939 creating the state soil conservation agency and governing committee and providing for the creation of Iowa’s 100 soil and water conservation districts. • The Mines & Minerals Bureau, through the federal Abandoned Mine Land (AML) Program, worked with various watershed groups to again secure an additional $1 million dollars in funding for the construction on projects in Marion, Mahaska and Monroe Counties. • Iowa hosted the Mississippi River/Gulf of Mexico Hypoxia Task Force tour and meeting in September 2009.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Abstract: Demarcating: inhabitant-oriented urban development projects in Helsinki

Relevância:

80.00% 80.00%

Publicador:

Resumo:

This report, entitled ―Iowa Highway Research Board Research and Development Activities FY2012‖ is submitted in compliance with Sections 310.36 and 312.3A, Code of Iowa, which direct the submission of a report of the Secondary Road Research Fund and the Street Research Fund, respectively. It is a report of the status of research and development projects in progress on June 30, 2012. It is also a report on projects completed during the fiscal year beginning July 1, 2011 and ending June 30, 2012. Detailed information on each of the research and development projects mentioned in this report is available from the Office of Research and Analytics, Performance and Technology Division, Iowa Department of Transportation. All approved reports are also online for viewing at: www.iowadot.gov/operationsresearch/reports.aspx.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

High-fidelity 'proofreading' polymerases are often used in library construction for next-generation sequencing projects, in an effort to minimize errors in the resulting sequence data. The increased template fidelity of these polymerases can come at the cost of reduced template specificity, and library preparation methods based on the AFLP technique may be particularly susceptible. Here, we compare AFLP profiles generated with standard Taq and two versions of a high-fidelity polymerase. We find that Taq produces fewer and brighter peaks than high-fidelity polymerase, suggesting that Taq performs better at selectively amplifying templates that exactly match the primer sequences. Because the higher accuracy of proofreading polymerases remains important for sequencing applications, we suggest that it may be more effective to use alternative library preparation methods.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Incentive/disincentive clauses (I/D) are designed to award payments to contractors if they complete work ahead of schedule and to deduct payments if they exceed the completion time. A previously unanswered question is, “Did the costs of the actual work zone impacts that were avoided justify the incentives paid?” This report answers that question affirmatively based on an evaluation of 20 I/D projects in Missouri from 2008 to 2011. Road user costs (RUC) were used to quantify work zone impacts and included travel delays, vehicle operating costs, and crash costs. These were computed using work zone traffic conditions for partial-closure projects and detour volumes and routes for full-closure projects. Conditions during construction were compared to after construction. Crash costs were computed using Highway Safety Manual methodology. Safety Performance Functions produced annual crash frequencies that were translated into crash cost savings. In considering an average project, the percentage of RUC savings was around 13% of the total contract amount, or $444,389 of $3,464,620. The net RUC savings produced was around $7.2 million after subtracting the approximately $1.7 million paid in incentives. In other words, for every dollar paid in incentives, approximately 5.3 dollars of RUC savings resulted. I/D provisions were very successful in saving RUC for projects with full-closure, projects in urban areas, and emergency projects. Rural, non-emergency projects successfully saved RUC but not at the same level as other projects. The I/D contracts were also compared to all Missouri Department of Transportation contracts for the same time period. The results show that I/D projects had a higher on-time completion percentage and a higher number of bids per call than average projects. But I/D projects resulted in 4.52% higher deviation from programmed costs and possibly more changes made after the award. A survey of state transportation departments and contractors showed that both agreed to the same issues that affect the success of I/D contracts. Legal analysis suggests that liquidated damages is preferred to disincentives, since enforceability of disincentives may be an issue. Overall, in terms of work zone impact mitigation, I/D contracts are very effective at a relatively low cost.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

This report, entitled Iowa Highway Research and Development Activities FY2013 is submitted in compliance with Iowa Code sections 310.36 and 312.3A, which directs the submission of a report of the Secondary Road Research Fund and the Street Research Fund, respectively. It is a report of the status of research and development projects in progress on June 30, 2013. It is also a report on projects completed during the fiscal year beginning July 1, 2012 and ending June 30, 2013. Detailed information on each of the research and development projects mentioned in this report is available from the office of Research and Analytics, Performance and Technology Division, Iowa Department of Transportation. All approved reports are also online for viewing at: www.iowadot.gov/operationsresearch/reports.aspx.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Excessive speed on State and County highways is recognized as a serious problem by many Iowans. Speed increases both the risk and severity of accidents. Studies conducted by the FHWA and NHTSA have concluded that if average speeds were increased by five MPH, fatalities would increase by at least 2,200 annually. Along with the safety problems associated with excessive speed are important energy considerations. When the national speed limit was lowered to 55 MPH in 1974, a tremendous savings in fuel was realized. The estimated actual savings for automobiles amounted to 2.2 billion gallons, an average of 20.75 gallons for each of the 106 million automobiles registered in 1975. These benefits prompted the Federal-Aid Amendment of 1974 requiring annual State enforcement certification as a prerequisite for approval of Federal-aid highway projects. In 1978, the United States D.O.T. recommended to Congress significant changes in speed limit legislation designed to increase compliance with the national speed limit. The Highway Safety Act of 1978 provides for both withholding Federal-aid highway funds and awarding incentive grants based on speed compliance data submitted annually. The objective of this study was to develop and make operational, an automatic speed monitoring system which would have flexible capabilities of collecting accurate speed data on all road systems in Iowa. It was concluded that the Automatic Speed Monitoring Program in Iowa has been successful and needed data is being collected in the most economical manner possible.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

The concrete admixture Ipanex (Registered trademark) manufactured by IPA Systems Inc. was submitted to the Iowa Department of Transportation (Iowa DOT) New Products Committee on April 15, 1998. The New Products Committee requested that the Iowa DOT Materials Laboratory evaluate the durability, corrosion inhibiting and concrete permeability reduction effects of this admixture. This report is intended to present the results of testing in Iowa DOT materials laboratories, review a Pennsylvania State University report, as well as review the IPA Systems Inc. marketing literature. The objective is to provide the New Products Committee with a recommendation concerning approval of this product based on the information gathered. The portland cement concrete admixture Ipanex (Registered trademark) did not show any significant benefit in terms of improvement in areas of permeability, chloride resistance and strength in the testing performed at the Iowa DOT. The literature and reports reviewed did not provide enough credible evidence to refute this conclusion. Additionally, the benefits ascribed to this product can be more economically achieved using other currently available products such as slag and silica fume. The recommendation is that this product not be approved for use on State projects in Iowa.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Reflective cracking of asphalt resurfacing has been a concern for a long time. Years ago wire mesh was used to control widening cracks. More recently it has been fabrics or fiberglass. In 1986, part of the proposed fabric was deleted from projects in different parts of Iowa with various histories and designs. These projects were monitored in 1988, 1989, 1990 and 1992 with only the thin (3 inch) overlays on newly widened pavements showing a significantly greater percentage of cracks in the areas where the fabric was deleted.