981 resultados para Nuclear Power plants


Relevância:

80.00% 80.00%

Publicador:

Resumo:

Currently, power systems (PS) already accommodate a substantial penetration of distributed generation (DG) and operate in competitive environments. In the future, as the result of the liberalisation and political regulations, PS will have to deal with large-scale integration of DG and other distributed energy resources (DER), such as storage and provide market agents to ensure a flexible and secure operation. This cannot be done with the traditional PS operational tools used today like the quite restricted information systems Supervisory Control and Data Acquisition (SCADA) [1]. The trend to use the local generation in the active operation of the power system requires new solutions for data management system. The relevant standards have been developed separately in the last few years so there is a need to unify them in order to receive a common and interoperable solution. For the distribution operation the CIM models described in the IEC 61968/70 are especially relevant. In Europe dispersed and renewable energy resources (D&RER) are mostly operated without remote control mechanisms and feed the maximal amount of available power into the grid. To improve the network operation performance the idea of virtual power plants (VPP) will become a reality. In the future power generation of D&RER will be scheduled with a high accuracy. In order to realize VPP decentralized energy management, communication facilities are needed that have standardized interfaces and protocols. IEC 61850 is suitable to serve as a general standard for all communication tasks in power systems [2]. The paper deals with international activities and experiences in the implementation of a new data management and communication concept in the distribution system. The difficulties in the coordination of the inconsistent developed in parallel communication and data management standards - are first addressed in the paper. The upcoming unification work taking into account the growing role of D&RER in the PS is shown. It is possible to overcome the lag in current practical experiences using new tools for creating and maintenance the CIM data and simulation of the IEC 61850 protocol – the prototype of which is presented in the paper –. The origin and the accuracy of the data requirements depend on the data use (e.g. operation or planning) so some remarks concerning the definition of the digital interface incorporated in the merging unit idea from the power utility point of view are presented in the paper too. To summarize some required future work has been identified.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Trabalho Final de Mestrado para obtenção do grau de Mestre em Engenharia Mecânica

Relevância:

80.00% 80.00%

Publicador:

Resumo:

A noção de Economia relativa ao Hidrogénio no vocabulário dos líderes políticos e empresariais tem vindo a mudar sobretudo pela preocupação da poluição global, segurança energética e mudanças climáticas, para além do crescente domínio técnico dos cientistas e engenheiros. O interesse neste composto, que é o elemento mais simples e abundante no universo, está a crescer, devido aos avanços tecnológicos das células de combustível – as potenciais sucessoras das baterias dos aparelhos portáteis eletrónicos, centrais elétricas e motores de combustão interna. Existem métodos já bem desenvolvidos para produzir o hidrogénio. Contudo, destacase a eletrólise da água, não só por ser um método simples mas porque pode utilizar recursos energéticos renováveis, tais como, o vento ou os painéis fotovoltaicos, e aumentar a sua eficiência. Os desafios para melhorar a utilização deste método consistem em reduzir o consumo, a manutenção e os custos energéticos e aumentar a confiança, a durabilidade e a segurança. Mais ainda, consistem em rentabilizar o subproduto oxigénio pois é um gás industrial e medicinal muito importante. Neste trabalho, estudou-se a viabilidade económica da instalação de uma unidade de produção de hidrogénio e oxigénio puros por eletrólise da água, utilizando como fonte energética a energia solar, na empresa Gasoxmed – Gases Medicinais S.A., pretendendo num futuro próximo, comercializar o hidrogénio como fonte de energia, e por outro lado, aproveitar o subproduto oxigénio para utilização industrial. Projetou-se assim uma unidade utilizando um eletrolisador da marca Proton, modelo C30, com capacidade de produção gasosa de 3 kg/h (30 m3/h) de hidrogénio e 20 kg/h (15 m3/h) de oxigénio. Os gases produzidos são comprimidos num compressor da marca RIX a 200 bares para posterior armazenamento em cilindros pressurizados. Dimensionou-se ainda um sistema de miniprodução fotovoltaico com potência 250 kW para alimentar eletricamente a instalação. A realização do projeto na nova área de produção necessitará de 1.713.963€, os quais serão adquiridos por empréstimo bancário. Definiram-se todos os custos fixos associados ao projeto que perfazem um total de 62.554€/mês para os primeiros 5 anos (duração do crédito bancário) findo o qual diminuirão para 21.204€/mês. Da comercialização do hidrogénio, do oxigénio industrial e da eletricidade produzida no sistema de miniprodução de 250 kW, prevê-se um lucro mensal de 117.925€, perfazendo assim um total líquido mensal positivo de 55.371€ durante os primeiros 5 anos e a partir daí de 96.721€/mês, resultando uma amortização do investimento inicial no final do 3º ano.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Dissertação de Mestrado, Geologia do Ambiente e Sociedade, 15 de Fevereiro de 2016, Universidade dos Açores.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

This paper is on the maximization of total profit in a day-ahead market for a price-taker producer needing a short-term scheduling for wind power plants coordination with concentrated solar power plants, having thermal energy storage systems. The optimization approach proposed for the maximization of profit is a mixed-integer linear programming problem. The approach considers not only transmission grid constraints, but also technical operating constraints on both wind and concentrated solar power plants. Then, an improved short-term scheduling coordination is provided due to the more accurate modelling presented in this paper. Computer simulation results based on data for the Iberian wind and concentrated solar power plants illustrate the coordination benefits and show the effectiveness of the approach.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Dissertação apresentada na Faculdade de Ciências e Tecnologia da Universidade Nova de Lisboa para obtenção do grau de Mestre em Engenharia do Ambiente, Perfil Gestão e Sistemas Ambientais

Relevância:

80.00% 80.00%

Publicador:

Resumo:

This paper is on the maximization of total profit in a day-ahead market for a price-taker producer needing a short-term scheduling for wind power plants coordination with concentrated solar power plants, having thermal energy storage systems. The optimization approach proposed for the maximization of profit is a mixed-integer linear programming problem. The approach considers not only transmission grid constraints, but also technical operating constraints on both wind and concentrated solar power plants. Then, an improved short-term scheduling coordination is provided due to the more accurate modelling presented in this paper. Computer simulation results based on data for the Iberian wind and concentrated solar power plants illustrate the coordination benefits and show the effectiveness of the approach.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Dissertação para obtenção do grau de Mestre em Engenharia Electrotécnica Ramo Energia

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Naturally occurring radioactive materials (NORM) under certain conditions can reach hazardous radiological levels contributing to an additional exposure dose to ionizing radiation. Most environmental concerns are associated with uranium mining and milling sites, but the same concerns should be addressed to natural near surface occurrences of uranium as well as man-made sources such as technologically enhanced naturally occurring radioactive materials (TENORM) resulting from phosphates industry, ceramic industry and energy production activities, in particular from coal-fired power plants which is one of the major sources of increased exposure to man from enhanced naturally occurring materials. This work describes the methodology developed to assess the environmental radiation by in situ gamma spectrometry in the vicinity of a Portuguese coal fired power plant. The current investigation is part of a research project that is undergoing in the vicinity of Sines Coal-Fired Power Plant (south of Portugal) until the end of 2013.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

The electricity demand in Brazil has been growing. Some studies estimate that through 2035 the energy consumption (the power consumption) should increase 78%. Two distinct actions are necessary to meet this growth: the construction of new generating plants and to reduce electrical losses in the country. As the construction of power plants have a high price, coupled with the growth of (current) environmental concern, electric utilities are investing in reducing losses, both technical and non-technical. In this context, this paper aims to present an overview of nontechnical losses in Brazil and to raise a discussion on the reasons that contribute to energy fraud.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Enterprise and Work Innovation Studies,6,IET, pp.9-51

Relevância:

80.00% 80.00%

Publicador:

Resumo:

A sustentabilidade do sistema energético é crucial para o desenvolvimento económico e social das sociedades presentes e futuras. Para garantir o bom funcionamento dos sistemas de energia actua-se, tipicamente, sobre a produção e sobre as redes de transporte e de distribuição. No entanto, a integração crescente de produção distribuída, principalmente nas redes de distribuição de média e de baixa tensão, a liberalização dos mercados energéticos, o desenvolvimento de mecanismos de armazenamento de energia, o desenvolvimento de sistemas automatizados de controlo de cargas e os avanços tecnológicos das infra-estruturas de comunicação impõem o desenvolvimento de novos métodos de gestão e controlo dos sistemas de energia. O contributo deste trabalho é o desenvolvimento de uma metodologia de gestão de recursos energéticos num contexto de SmartGrids, considerando uma entidade designada por VPP que gere um conjunto de instalações (unidades produtoras, consumidores e unidades de armazenamento) e, em alguns casos, tem ao seu cuidado a gestão de uma parte da rede eléctrica. Os métodos desenvolvidos contemplam a penetração intensiva de produção distribuída, o aparecimento de programas de Demand Response e o desenvolvimento de novos sistemas de armazenamento. São ainda propostos níveis de controlo e de tomada de decisão hierarquizados e geridos por entidades que actuem num ambiente de cooperação mas também de concorrência entre si. A metodologia proposta foi desenvolvida recorrendo a técnicas determinísticas, nomeadamente, à programação não linear inteira mista, tendo sido consideradas três funções objectivo distintas (custos mínimos, emissões mínimas e cortes de carga mínimos), originando, posteriormente, uma função objectivo global, o que permitiu determinar os óptimos de Pareto. São ainda determinados os valores dos custos marginais locais em cada barramento e consideradas as incertezas dos dados de entrada, nomeadamente, produção e consumo. Assim, o VPP tem ao seu dispor um conjunto de soluções que lhe permitirão tomar decisões mais fundamentadas e de acordo com o seu perfil de actuação. São apresentados dois casos de estudo. O primeiro utiliza uma rede de distribuição de 32 barramentos publicada por Baran & Wu. O segundo caso de estudo utiliza uma rede de distribuição de 114 barramentos adaptada da rede de 123 barramentos do IEEE.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Os combustíveis fósseis, como o carvão, o petróleo e o gás, constituem fontes de energia que em breve se esgotarão e que são demasiado caras para serem desperdiçadas pelas centrais elétricas na produção de electricidade. Para além desse facto, existem outros argumentos (sobretudo económicos) que inviabilizam a utilização destas fontes de energia em algumas regiões, abrindo caminho a fontes de energia alternativas (e.g. solar, eólica, biomassa, mini-hídricas, geotérmicas, etc) e preferencialmente com contornos locais. No caso particular de Moçambique, tem-se verificado um interesse crescente por parte do governo e de várias ONGs na promoção do uso de energias alternativas para as zonas onde a energia convencional não chega e não chegará, devido aos custos muito elevados que esse processo acarretaria. Esta dissertação apresenta um estudo aprofundado do dimensionamento dum sistema híbrido de geração de energia elétrica envolvendo gerador FV e grupo eletrogéneo de emergência para a Escola Rural da Nangade, situada no Distrito de Nangade, na Província do Cabo Delgado. São também descritos os diversos componentes e as tecnologias associadas a um sistema deste género, com a inclusão de sistemas inteligentes de controlo de energia com a utilização de inversores bidireccionais (inversores de bateria e carregadores) para sistemas isolados. Os resultados são apresentados de forma a facilitar a aplicação e montagem deste tipo de sistemas in loco. Espera-se que esta dissertação possa servir de base no futuro próximo, para a implementação deste tipo de sistemas para permitir a melhoria da qualidade de ensino através de melhores infraestruturas, democratizando desta forma o acesso à educação para as crianças das zonas rurais das várias províncias de Moçambique. Como as energias renováveis são parte integrante do Sistema Elétrico Nacional, apresenta-se resumidamente, no anexo 17, o “Plano de Desenvolvimento na Área de Energia de Moçambique”.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Os aproveitamentos geotérmicos têm vindo a aumentar significativamente em todo o mundo, sendo os Estados Unidos da América, o maior produtor desta energia proveniente do interior da Terra, com cerca de 3.187 MW de capacidade instalada. Portugal tem capacidade instalada total de 29 MW, no entanto no que se refere ao aproveitamento de “alta entalpia”, isto é, o aproveitamento geotérmico para produção elétrica, apenas se encontra no arquipélago dos Açores, na ilha de S. Miguel, onde estão instaladas e em funcionamento duas centrais geotérmicas com a potência total de 23 MW, com produção de energia de 185 GWh. Em Portugal Continental, não se consegue produzir energia elétrica devido às temperaturas existentes, restringindo esta utilização apenas ao aproveitamento de baixa entalpia (máximo de 76 ºC). Este aproveitamento normalmente é feito em cascata, segundo, predominando o aquecimento de águas sanitárias, climatização, e para termas, usando águas termominerais. Para a exploração deste recurso renovável, é necessário conhecer a hidrogeologia do país, e relacioná-la com a fracturação, e acidentes tectónicos. Portugal Continental, está divido em quatros partes distintas a nível hidrogeológico, o Maciço Antigo, a Orla Ocidental, a Bacia Tejo-Sado e a Orla Meridional. Qualquer aproveitamento geotérmico em Portugal terá de atender a estas características, potenciando também, novas explorações geotérmicas orientadas para as pessoas, respeitando os valores sociais, culturais e ambientais. Neste contexto, existem alguns complexos geotérmicos em funcionamento, outros abandonados, e muitos outros em estudo para uma breve aplicação. Um exemplo de sucesso no aproveitamento do calor geotérmico, é o complexo de Chaves, que foi evoluindo desde 1985, até aos dias de hoje, continuando em exploração e em expansão para um melhor servir da população local. A existência de dois furos, e brevemente dum terceiro, servem para o abastecimento duma piscina, dum hotel, das termas, e da balneoterapia. Devido à riqueza a nível das temperaturas, dos caudais, e ao nível das necessidades energéticas existentes, este complexo apresenta um tempo de retorno de investimento de cerca de 7 anos, o que é geralmente considerado para investimentos para fins públicos, como é o caso. No âmbito das investigações agora realizadas, foi constatado que estes projetos suportam a cobertura de alguma incerteza hidrogeológica, dada a importante procura existente.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

O constante crescimento dos produtores em regime especial aliado à descentralização dos pontos injetores na rede, tem permitido uma redução da importação de energia mas também tem acarretado maiores problemas para a gestão da rede. Estes problemas estão relacionados com o facto da produção estar dependente das condições climatéricas, como é o caso dos produtores eólicos, hídricos e solares. A previsão da energia produzida em função da previsão das condições climatéricas tem sido alvo de atenção por parte da comunidade empresarial do setor, pelo facto de existir modelos razoáveis para a previsão das condições climatéricas a curto prazo, e até a longo prazo. Este trabalho trata, em concreto, do problema da previsão de produção em centrais mini-hídricas, apresentando duas propostas para essa previsão. Em ambas as propostas efetua-se inicialmente a previsão do caudal que chega à central, sendo esta depois convertida em potência que é injetada na rede. Para a previsão do caudal utilizaram-se dois métodos estatísticos: o método Holt-Winters e os modelos ARMAX. Os dois modelos de previsão propostos consideram um horizonte temporal de uma semana, com discretização horária, para uma central no norte de Portugal, designadamente a central de Penide. O trabalho também contempla um pequeno estudo da bibliografia existente tanto para a previsão da produção como de afluências de centrais hidroelétricas. Aborda, ainda, conceitos relacionados com as mini-hídricas e apresenta uma caraterização do parque de centrais mini-hídricas em Portugal.