931 resultados para Life cycle thinking


Relevância:

80.00% 80.00%

Publicador:

Resumo:

The growing awareness of sustainability issues around the world has put extensive pressure on the construction industry to improve its sustainable practice. Sustainability principles need to be applied to not just during design and construction phase but the entire life cycle of a construction project. Compared to sustainability endeavours on earlier development phases, the pace to implement sustainability agenda during the operation and maintenance phase has not been as fast during past practices of facilities management (FM). Literature study suggests that sustainable practices in FM activities can bring substantial benefits such as reducing energy consumptions and waste, while increasing productivity, financial return and standing in the community. It also suggests several barriers which inhibit the implementation of sustainability in FM practices, including the lack of knowledge, discrepancy between capability and skills, and unwillingness of the FM personnel and organizations to adapt to new routines in order to implement sustainability in their business. The capabilities of FM personnel and organizations were regarded as the key enablers in managing sustainability knowledge. In a sustainable development context, capabilities are vital to the fostering of competency in an organization to innovate in a more sustainable way and support the agenda in an organization. Additionally, research which focused on people’s capabilities and skills is still lagging behind the efforts to develop guidelines, technical manuals and knowledge portals. Therefore, it is beneficial to explore the issues of capabilities in dealing with the implementation of sustainable practices in FM. This paper introduces a research project which is aimed at establishing a knowledge capabilities framework for promoting sustainability measures in FM practices. It will explore and highlight challenges to integrate sustainability as well as the personnel and organizational capabilities that are vital in dealing with knowledge issues in implementing sustainability agenda in FM practices. The expected outcome of this research has the potential to further sustainability endeavours in FM practices, while providing a useful source of knowledge to the FM personnel and organizations.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

The construction industry has been under pressure for many years to produce economical buildings which offer value for money, not only during the construction phase, but more importantly, during the full life of the building. Whole Life Cycle Costing (WLCC) is a relatively new concept for the construction industry especially on residential development and particularly for Malaysia. Discussing the speculation in using WLCC for the Malaysian residential constructions is the aim for this paper and it is one of the research questions on my research. This paper also wants to gather more speculation that may involve through others experienced. Basically, this paper is written to facilitate the current or future individual which will involve in residential property development sector with a new sensible approach to what at times seems impressively confusing especially in simplifying the operations and maintenance services and rehabilitation as well.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Twenty first century learners operate in organic, immersive environments. A pedagogy of student-centred learning is not a recipe for rooms. A contemporary learning environment is like a landscape that grows, morphs, and responds to the pressures of the context and micro-culture. There is no single adaptable solution, nor a suite of off-the-shelf answers; propositions must be customisable and infinitely variable. They must be indeterminate and changeable; based on the creation of learning places, not restrictive or constraining spaces. A sustainable solution will be un-fixed, responsive to the life cycle of the components and materials, able to be manipulated by the users; it will create and construct its own history. Learning occurs as formal education with situational knowledge structures, but also as informal learning, active learning, blended learning social learning, incidental learning, and unintended learning. These are not spatial concepts but socio-cultural patterns of discovery. Individual learning requirements must run free and need to be accommodated as the learner sees fit. The spatial solution must accommodate and enable a full array of learning situations. It is a system not an object. Three major components: 1. The determinate landscape: in-situ concrete 'plate' that is permanent. It predates the other components of the system and remains as a remnant/imprint/fossil after the other components of the system have been relocated. It is a functional learning landscape in its own right; enabling a variety of experiences and activities. 2. The indeterminate landscape: a kit of pre-fabricated 2-D panels assembled in a unique manner at each site to suit the client and context. Manufactured to the principles of design-for-disassembly. A symbiotic barnacle like system that attaches itself to the existing infrastructure through the determinate landscape which acts as a fast growth rhizome. A carapace of protective panels, infinitely variable to create enclosed, semi-enclosed, and open learning places. 3. The stations: pre-fabricated packages of highly-serviced space connected through the determinate landscape. Four main types of stations; wet-room learning centres, dry-room learning centres, ablutions, and low-impact building services. Entirely customised at the factory and delivered to site. The stations can be retro-fitted to suit a new context during relocation. Principles of design for disassembly: material principles • use recycled and recyclable materials • minimise the number of types of materials • no toxic materials • use lightweight materials • avoid secondary finishes • provide identification of material types component principles • minimise/standardise the number of types of components • use mechanical not chemical connections • design for use of common tools and equipment • provide easy access to all components • make component size to suite means of handling • provide built in means of handling • design to realistic tolerances • use a minimum number of connectors and a minimum number of types system principles • design for durability and repeated use • use prefabrication and mass production • provide spare components on site • sustain all assembly and material information

Relevância:

80.00% 80.00%

Publicador:

Resumo:

There is a worldwide demand for an increasingly sustainable built environment. This has resulted in the need for a more accurate evaluation of the level of sustainability of construction projects. To do this it involves the development of better measurement and benchmarking methods. One approach is to use a theoretical model to assess construction projects in terms of their sustainable development value (SDV) and sustainable development ability (SDA) for implementation in the project life cycle, where SDA measures the contribution of a project to development sustainability and as a major criterion for assessing its feasibility. This paper develops an improved SDA prototype model that incorporates the effects of dynamical factors on project sustainability. This involves the introduction of two major factors concerning technological advancement and changes in people's perceptions. A case study is used to demonstrate the procedures involved in simulation and modeling, one outcome of which is to demonstrate the greater influence of technological advancement on project sustainability than changes in perception.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Railway bridges deteriorate with age. Factors such as environmental effects on different materials of a bridge, variation of loads, fatigue, etc will reduce the remaining life of bridges. Bridges are currently rated individually for maintenance and repair actions according to the structural conditions of their elements. Dealing with thousands of bridges and several factors that cause deterioration, makes the rating process extremely complicated. Current simplified but practical rating methods are not based on an accurate structural condition assessment system. On the other hand, the sophisticated but more accurate methods are only used for a single bridge or particular types of bridges. It is therefore necessary to develop a practical and accurate system which will be capable of rating a network of railway bridges. This paper introduces a new method for rating a network of bridges based on their current and future structural conditions. The method identifies typical bridges representing a group of railway bridges. The most crucial agents will be determined and categorized to criticality and vulnerability factors. Classification based on structural configuration, loading, and critical deterioration factors will be conducted. Finally a rating method for a network of railway bridges that takes into account the effects of damaged structural components due to variations in loading and environmental conditions on the integrity of the whole structure will be proposed. The outcome of this research is expected to significantly improve the rating methods for railway bridges by considering the unique characteristics of different factors and incorporating the correlation between them.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Compression ignition (CI) engine design is subject to many constraints which presents a multi-criteria optimisation problem that the engine researcher must solve. In particular, the modern CI engine must not only be efficient, but must also deliver low gaseous, particulate and life cycle greenhouse gas emissions so that its impact on urban air quality, human health, and global warming are minimised. Consequently, this study undertakes a multi-criteria analysis which seeks to identify alternative fuels, injection technologies and combustion strategies that could potentially satisfy these CI engine design constraints. Three datasets are analysed with the Preference Ranking Organization Method for Enrichment Evaluations and Geometrical Analysis for Interactive Aid (PROMETHEE-GAIA) algorithm to explore the impact of 1): an ethanol fumigation system, 2): alternative fuels (20 % biodiesel and synthetic diesel) and alternative injection technologies (mechanical direct injection and common rail injection), and 3): various biodiesel fuels made from 3 feedstocks (i.e. soy, tallow, and canola) tested at several blend percentages (20-100 %) on the resulting emissions and efficiency profile of the various test engines. The results show that moderate ethanol substitutions (~20 % by energy) at moderate load, high percentage soy blends (60-100 %), and alternative fuels (biodiesel and synthetic diesel) provide an efficiency and emissions profile that yields the most “preferred” solutions to this multi-criteria engine design problem. Further research is, however, required to reduce Reactive Oxygen Species (ROS) emissions with alternative fuels, and to deliver technologies that do not significantly reduce the median diameter of particle emissions.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

The last 50 years have produced multiple changes in our understanding of the place of paid and unpaid work in women’s lives. A growing theoretical, research and practical literature attests to the attention being directed to the a broader understanding of women’s working lives. It is more than thirty years since the groundbreaking paper by Fitzgerald and Crites’ (1980) on the career psychology of women. Prior to that time women’s careers were seen as primarily home based or “in relation to” men’s careers. In 1975 Osipow had commented on the lack of usefulness of traditional theories of career behaviour for women in that several basic assumptions on which they were founded were not relevant. For example, traditional career theory is based on the assumption that an array of career choices is available to all individuals, who are in turn motivated to pursue their personal interests in making certain choices. A comment on the state of vocational psychology in relation to class made by Tyler in 1967 highlights the inadequacy of application to women: - "much of what we know about the stages through which an individual passes as he prepares to find his place in the world of work might appropriately be labelled the vocational development of white middle class males" (p. 62; original italics). Gilligan's (1979) classic article entitled "woman's place in man's life cycle" emphasised the restriction of many theories of psychology in understanding women's lives as they implicitly adopted male as norm and failed to account for the unique social and family situation of women and the related demands on them...

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Osteoporosis imposes a tremendous burden on Australia : 1.2 million Australians have osteoporosis and 6.3 million have Osteopenia. In the 2007-08 financial year, 82000 Australians suffered fragility fractures, of Which >17000 were hip fractures. In the 2000-01 financial year, direct costs were estimated at $1.9 billion per year and an additional $5.6 billion on indirect costs. Osteoporosis was designated a National Health Priority Area in 2002; however, implementation of national plans has not yet matched the rhetoric in terms of urgency. Building healthy bones throughout life, the Osteoporosis Australia strategy to prevent osteoporosis throughout the life cycle, presents an evidence-informed set of recommendations for consumers, health care professionals and policymakers. The strategy was adopted by consensus at the Osteoporosis Australia Summit in Sydney, 20 October 2011. Primary objectives throughout the life cycle are: to maximise peak bone mass during childhood and adolescence to prevent premature bone loss and improve or maintain muscle mass, strength and functional capacity in healthy adults to prevent and treat osteoporosis in order to minimise the risk of suffering fragility fractures, and reduce falls risk, in older people. The recommendations focus on three affordable and important interventions to ensure people have adequate calcium intake, vitamin D levels and appropriate, physical activity throughout their lives. Recommendations relevant to all stages of life include: daily dietary calcium intakes should be consistent with Australian and New Zealand guidelines serum levels of vitamin D in the general population should be above 50 nmol/L in winter or early spring for optimal bone health regular weight-bearing physical activity, Muscle strengthening exercises and challenging balance/ mobility activities should be conducted in a safe environment.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Sustainability needs to be embedded throughout the life-cycle of a construction project. From project conception, planning, design, construction stage, operation and maintenance to demolition, each phase of development should embrace principles of sustainability and the stakeholder involved should be empowered with the necessary skills. Past research explored the importance of ensuring sustainability measures during the occupancy phase based on considerations of Life-Cycle Cost Analysis and a project’s long-term detrimental impact on the environment. Facility managers are in a unique position to promote sustainability over longer periods of project engagement and can apply a high level of influence on the built assets through management and upgrades. There is growing interest among facility managers in incorporating sustainability measures into day-to-day practice. More, however, needs to be done. Previous studies have identified barriers such as the lack of sustainability knowledge and skills, poor access to information, and unwillingness to change among facility management (FM) practitioners and stakeholders. This inhibits proper implementation of sustainable practices in the FM sector. A number of key factors, such as knowledge discrepancy, time constraints, diversity of FM functions and a lack of incentives, require urgent remedy. The capability of FM professionals and stakeholders will be a key enabler in managing the sustainability agenda, as it is central to the improvement of competency and innovation in an organization. Compared to the attempts at developing sustainability guidelines and performance measurement, research efforts relating to people capabilities and skills are still lagging behind. This paper discusses the progress to date of a research project aimed at formulating a people capabilities framework for sustainable FM practices based on expert opinions and industry feedback. Through literature review, the paper explores the challenges of incorporating sustainability principles into general FM practices before focusing specifically on FM personnel capabilities that may impact on the implementation of a holistic sustainability agenda in real life practice. The results of an industry survey are used to propose an action framework to identify, promote and utilise people capabilities in order to promote sustainability integration in FM practices. The paper provides a useful information source for FM personnel and organizations to bridge the gap between extensive tools on sustainable design and construction assessment at the front end and the need to maintain focus throughout the project life-cycle.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Background WSUD implementation in the Gold Coast City Council area commenced more than a decade ago. As a result, Council is expected to be in possession of WSUD assets valued at over tens of million dollars. The Gold Coast City Council is responsible for the maintenance and long-term management of these WSUD assets. Any shortcoming in implementation of best WSUD practices can potentially result in substantial liabilities and ineffective expenditure for the Council in addition to reduced efficiencies and outcomes. This highlights the importance of periodic auditing of WSUD implementation. Project scope The overall study entailed the following tasks: * A state-of-the-art literature review of the conceptual hydraulic and water quality treatment principles, current state of knowledge in relation to industry standards, best practice and identification of knowledge gaps in relation to maintenance and management practices and potential barriers to the implementation of WSUD. * Council stakeholder interviews to understand current practical issues in relation to the implementation of WSUD and the process of WSUD application from development application approval to asset management. * Field auditing of selected WSUD systems for condition assessment and identification of possible strengths and weaknesses in implementation. * Review of the Land Development Guidelines in order to identify any gaps and to propose recommendations for improvement. Conclusions Given below is a consolidated summary of the findings of the study undertaken. State-of-the-art literature review Though the conceptual framework for WSUD implementation is well established, the underlying theoretical knowledge underpinning the treatment processes and maintenance regimes and life cycle costing are still not well understood. Essentially, these are the recurring themes in the literature, namely, the inadequate understanding of treatment processes and lack of guidance to ensure specificity of maintenance regimes and life cycle costing of WSUDs. The fundamental barriers to successful WSUD implementation are: * Lack of knowledge transfer – This essentially relates to the lack of appropriate dissemination of research outcomes and the common absence of protocols for knowledge transfer within the same organisation. * Cultural barriers – These relate to social and institutional factors, including institutional inertia and the lack of clear understanding of the benefits. * Fragmented responsibilities – This results from poor administrative integration within local councils in relation to WSUDs. * Technical barriers – These relate to lack of knowledge on operational and maintenance practices which is compounded by model limitations and the lack of long-term quantitative performance evaluation data. * Lack of engineering standards – Despite the availability of numerous guidelines which are non-enforceable and can sometimes be confusing, there is a need for stringent engineering standards. The knowledge gaps in relation to WSUDs are only closing very slowly. Some of the common knowledge gaps identified in recent publications have been recognised almost a decade ago. The key knowledge gaps identified in the published literature are: * lack of knowledge on operational and maintenance practices; * lack of reliable methodology for identifying life cycle issues including costs; * lack of technical knowledge on system performance; * lack of guidance on retrofitting in existing developments. Based on the review of barriers to WSUD implementation and current knowledge gaps, the following were identified as core areas for further investigation: * performance evaluation of WSUD devices to enhance model development and to assess their viability in the context of environmental, economic and social drivers; establishing realistic life cycle costs to strengthen maintenance and asset management practices; * development of guidelines specific to retrofitting in view of the unique challenges posed by existing urban precincts together with guidance to ensure site specificity; establishment of a process for knowledge translation for enhancing currently available best practice guidelines; * identification of drivers and overcoming of barriers in the areas of institutional fragmentation, knowledge gaps and awareness of WSUD practices. GCCC stakeholder interviews Fourteen staff members involved in WSUD systems management in the Gold Coast City Council, representing four Directorates were interviewed using a standard questionnaire. The primary issues identified by the stakeholders were: * standardisation of WSUD terminology; * clear protocols for safeguarding devices during the construction phase; * engagement of all council stakeholders in the WSUD process from the initial phase; * limitations in the Land Development Guidelines; * ensuring public safety through design; * system siting to avoid conflicts with environmental and public use of open space; * provision of adequate access for maintenance; * integration of social and ecosystem issues to ensure long-term viability of systems in relation to both, vandalism and visual recreation; * lack of performance monitoring and inadequacy of the maintenance budget; * lack of technical training for staff involved in WSUD design approvals and maintenance; incentives for developers for acting responsibly in stormwater management. Field auditing of WSUD systems A representative cross section of WSUD systems in the Gold Coast were audited in the field. The following strengths and weaknesses in WSUD implementation were noted: * The implementation of WSUD systems in the field is not consistent. * The concerns raised by the stakeholders during the interviews in relation to WSUD implementation was validated from the observations from the field auditing, particularly in relation to the following: * safeguarding of devices during the construction phase * public safety * accessibility for maintenance * lack of performance monitoring by Council to assess system performance * inadequate maintenance of existing systems to suit site specific requirements. * A treatment train approach is not being consistently adopted. * Most of the systems audited have satisfactorily catered for public safety. Accessibility for maintenance has been satisfactorily catered for in most of the systems that were audited. * Systems are being commissioned prior to construction activities being substantially completed. * The hydraulic design of most systems appears to be satisfactory. * The design intent of the systems is not always clear. Review of Land Development Guidelines The Land Development Guidelines (TDG) was extensively reviewed and the following primary issues were noted in relation to WSUD implementation: * the LDG appears to have been prepared primarily to provide guidance to developers. It is not clear to what extent the guidelines are applicable to Council staff involved in WSUD maintenance and management; * Section 13 is very voluminous and appears to be a compilation of a series of individual documents resulting in difficulties in locating specific information, a lack of integration and duplication of information; * the LDG has been developed with a primary focus on new urban precinct development and the retrofitting of systems in existing developments has not been specifically discussed; * WSUDs are discussed in two different sections in the LDG and it is not clear which section takes precedence as there are inconsistencies between the two sections; there is inconsistent terminology being used; * there is a need for consolidation of information provided in different sections in the LDG; * there are inconsistencies in the design criteria provided; * there is a need for regular updating of the LDG to ensure that the information provided encompasses the state-of-the-art; * there is limited guidance provided for the preparation of maintenance plans and life cycle costing to assist developers in asset handover and to assist Council staff in assessment. * Based on these observations, eleven recommendations have been provided which are discussed below. Additionally, the stakeholder provided the following specific comments during the interviews in relation to the LDG: * lack of flexibility to cover the different stages of the life cycle of the systems; * no differentiation in projects undertaken by developers and Council; * inadequate information with regards to safety issues such as maximum standing water depth, fencing and safety barriers and public access; * lack of detailed design criteria in relation to Crime Prevention through Environmental Design, safety, amenity, environment, surrounding uses and impacts on surroundings; * inadequate information regarding maintenance requirements specific to the assessment and compliance phases; * recommendations for plantings are based primarily on landscape requirements rather than pollutant uptake capability. Recommendations With regards to the Land Development Guidelines, the following specific recommendations are provided: 1. the relevant sections and their extent of applicability to Council should be clearly identified; 2. integration of the different subsections within Section 13 and re-formatting the document for easy reference; 3. the maintenance guidelines provided in Section 13 should be translated to a maintenance manual for guidance of Council staff; 4. should consider extending the Guidelines to specifically encompass retrofitting of WSUD systems to existing urban precincts; 5. Section 3 needs to be revised to be made consistent with Section 13, to ensure priority for WSUD practices in urban precincts and to move away from conventional stormwater drainage design such as kerb and channelling; 6. it would also be good to specify as to which Section takes predominance in relation to stormwater drainage. It is expected that Section 13 would take predominance over the other sections in the LDG; 7. terminology needs to be made consistent to avoid confusion among developers and Council staff. Water Sensitive Urban Design is the term commonly used in Australia for stormwater quality treatment, rather than Stormwater Quality Improvement Devices. This once again underlines the need for ensuring consistency between Section 3 and Section 13; 8. it would also be good if there is a glossary of commonly used terms in relation to WSUD for use by all stakeholders and which should also be reflected in the LDG; 9. consolidation of all WSUD information into one section should be considered together with appropriate indicators in other LDG Sections regarding the availability of WSUD information. Ensuring consistency in the information provided is implied; 10. Section 13 should be updated at regular intervals to ensure the incorporation of the latest in research outcomes and incorporating criteria and guidance based on the state-of-the-art knowledge. The updating could be undertaken, say, in five year cycles. This would help to overcome the current lack of knowledge transfer; 11. the Council should consider commissioning specialised studies to extend the current knowledge base in relation to WSUD maintenance and life cycle costing. Additionally, Recommendation 10 is also applicable in this instance. The following additional recommendations are made based on the state-of-the-art literature review, stakeholder interviews and field auditing of WSUD systems: 1. Performance monitoring of existing systems to assess improvements to water quality, identify modifications and enhancements to improve performance; 2. Appropriate and monitored maintenance during different phases of development of built assets over time is needed to investigate the most appropriate time/phase of development to commission the final WSUD asset. 3. Undertake focussed investigations in the areas of WSUD maintenance and asset management in order to establish more realistic life cycle costs of systems and maintenance schedules; 4. the engagement of all relevant Council stakeholders from the initial stage of concept planning through to asset handover, and ongoing monitoring. This close engagement of internal stakeholders will assist in building a greater understanding of responsibilities and contribute to overcoming constraints imposed by fragmented responsibilities; 5. the undertaking of a public education program to inform the community of the benefits and ecosystem functions of WSUD systems; 6. technical training to impart state-of-the-art knowledge to staff involved in the approval of designs and maintenance and management of WSUD projects; 7. during the construction phase, it is important to ensure that appropriate measures to safeguard WSUD devices are implemented; 8. risks associated with potential public access to open water zones should be minimised with the application of appropriate safety measures; 9. system siting should ensure that potential conflicts are avoided with respect to public and ecosystem needs; 10. integration of social and ecosystem issues to ensure long-term viability of systems; provide incentives to developers who are proactive and responsible in the area of stormwater management.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

The decentralisation reform in Indonesia has mandated the Central Government to transfer some functions and responsibilities to local governments including the transfer of human resources, assets and budgets. Local governments became giant asset holders almost overnight and most were ill prepared to handle these transformations. Assets were transferred without analysing local government need, ability or capability to manage the assets and no local government was provided with an asset management framework. Therefore, the aim of this research is to develop a Public Asset Management Framework for provincial governments in Indonesia, especially for infrastructure and real property assets. This framework will enable provincial governments to develop integrated asset management procedures throughout asset‘s lifecycle. Achieving the research aim means answering the following three research questions; 1) How do provincial governments in Indonesia currently manage their public assets? 2) What factors influence the provincial governments in managing these public assets? 3) How is a Public Asset Management Framework developed that is specific for the Indonesian provincial governments‘ situation? This research applied case studies approach after a literature review; document retrieval, interviews and observations were collated. Data was collected in June 2009 (preliminary data collection) and January to July 2010 in the major eastern Indonesian provinces. Once the public asset management framework was developed, a focus group was used to verify the framework. Results are threefold and indicate that Indonesian provincial governments need to improve the effectiveness and efficiency of current practice of public asset management in order to improve public service quality. The second result shows that the 5 major concerns that influence the local government public asset management processes are asset identification and inventory systems, public asset holding, asset guidance and legal arrangements, asset management efficiency and effectiveness, and, human resources and their organisational arrangements. The framework was then applied to assets already transferred to local governments and so included a system of asset identification and a needs analysis to classify the importance of these assets to local governments, their functions and responsibilities in delivering public services. Assets that support local government functions and responsibilities will then be managed using suitable asset lifecycle processes. Those categorised as surplus assets should be disposed. Additionally functions and responsibilities that do not need an asset solution should be performed directly by local governments. These processes must be measured using performance measurement indicators. All these stages should be guided and regulated with sufficient laws and regulations. Constant improvements to the quality and quantity of human resources hold an important role in successful public asset management processes. This research focuses on developing countries, and contributes toward the knowledge of a Public Asset Management Framework at local government level, particularly Indonesia. The framework provides local governments a foundation to improve their effectiveness and efficiency in managing public assets, which could lead to improved public service quality. This framework will ensure that the best decisions are made throughout asset decision ownership and provide a better asset life cycle process, leading to selection of the most appropriate asset, improve its acquisition and delivery process, optimise asset performance, and provide an appropriate disposal program.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Climate change is expected to increase earth’s temperatures and consequently result in more frequent extreme weather events such as cyclones, storms, droughts and floods and rising global sea levels. This phenomenon will affect all assets. This paper discusses the impact of climate change and its consequences on public buildings. Public building management encompasses the building life cycle from planning, procurement, operation, repair and maintenance and building disposal. This paper recommends climate change adaptation strategies to be integrated into public building management. The roles and responsibilities of asset managers and users are discussed within the framework of planning and implementation of public building management and the integration of climate change adaptation strategies. A key point is that climate change can induce premature obsolescence of public buildings and services, which will increase the maintenance and refurbishment costs. This in turn will affect the life cycle cost of the building. Furthermore, a business continuity plan is essential for public building management in the context of disasters. The paper also highlights the significant role that the occupants of public buildings can play in the development and implementation of climate change adaptation strategies.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

The move towards technological ubiquity is allowing a more idiosyncratic and dynamic working environment to emerge that may result in the restructuring of information communication technologies, and changes in their use through different user groups' actions. Taking a ‘practice’ lens to human agency, we explore the evolving roles of, and relationships between these user groups and their appropriation of emergent technologies by drawing upon Lamb and Kling's social actor framework. To illustrate our argument, we draw upon a study of a UK Fire Brigade that has introduced a variety of technologies in an attempt to move towards embracing mobile and ubiquitous computing. Our analysis of the enactment of such technologies reveals that Bystanders, a group yet to be taken as the central unit of analysis in information systems research, or considered in practice, are emerging as important actors. The research implications of our work relate to the need to further consider Bystanders in deployments other than those that are mobile and ubiquitous. For practice, we suggest that Bystanders require consideration in the systems development life cycle, particularly in terms of design and education in processes of use.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

The representation of business process models has been a continuing research topic for many years now. However, many process model representations have not developed beyond minimally interactive 2D icon-based representations of directed graphs and networks, with little or no annotation for information overlays. In addition, very few of these representations have undergone a thorough analysis or design process with reference to psychological theories on data and process visualization. This dearth of visualization research, we believe, has led to problems with BPM uptake in some organizations, as the representations can be difficult for stakeholders to understand, and thus remains an open research question for the BPM community. In addition, business analysts and process modeling experts themselves need visual representations that are able to assist with key BPM life cycle tasks in the process of generating optimal solutions. With the rise of desktop computers and commodity mobile devices capable of supporting rich interactive 3D environments, we believe that much of the research performed in computer human interaction, virtual reality, games and interactive entertainment have much potential in areas of BPM; to engage, provide insight, and to promote collaboration amongst analysts and stakeholders alike. We believe this is a timely topic, with research emerging in a number of places around the globe, relevant to this workshop. This is the second TAProViz workshop being run at BPM. The intention this year is to consolidate on the results of last year's successful workshop by further developing this important topic, identifying the key research topics of interest to the BPM visualization community.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

For construction stakeholders to fully embrace sustainability, its long-term benefits and associated risks need to be identified through holistic approaches. Consensus among key stakeholders is very important to the improvement of the ecological performance of industrialized building systems (IBS), a building construction method gaining momentum in Malaysia. A questionnaire survey examines the relative significance of 16 potentially important sustainability factors for IBS applications. To present possible solutions,semi-structured interviews solicit views from experienced IBS practitioners, representing the professions involved. Three most critical factors agreed by key stakeholders are material consumption, waste generation and waste disposal. Using SWOT analysis, the positive and negative aspects of these factors are investigated, with action plans formulated for IBS design practitioners. The SWOT analysis based guidelines have the potential to become part of IBS design briefing documents against which sustainability solutions are contemplated, selected and implemented. Existing knowledge on ecological performance issues is extended by considering the unique characteristics of IBS and identifying not only the benefits, but also the potential risks and challenges of pursuing sustainability. This is largely missing in previous research efforts. Findings to date focus on providing much-needed assistance to IBS designers, who are at the forefront of decision-making with a significant level of project influence. Ongoing work will be directed towards other project development phases and consider the inherent linkage between design decisions and subsequent sustainability deliverables in the project life cycle.