824 resultados para Interactional and collaborative process of knowledge construction
Resumo:
This paper presents a study on applying an integrated Global Position System (GPS) and Geographacial Information System (GIS) technology to the reduction of construction waste. During the study, a prototype study is developed from automatic data capture system such as the barcoding system for construction material and equipment (M&E) management onsite, whilst the integrated GPS and GIS technology is combined to the M&E system based on the Wide Area Network (WAN). Then, a case study is conducted to demonstrate the deployment of the system. Experimental results indicate that the proposed system can minimize the amount of onsite material wastage.
Resumo:
The artificial grammar (AG) learning literature (see, e.g., Mathews et al., 1989; Reber, 1967) has relied heavily on a single measure of implicitly acquired knowledge. Recent work comparing this measure (string classification) with a more indirect measure in which participants make liking ratings of novel stimuli (e.g., Manza & Bornstein, 1995; Newell & Bright, 2001) has shown that string classification (which we argue can be thought of as an explicit, rather than an implicit, measure of memory) gives rise to more explicit knowledge of the grammatical structure in learning strings and is more resilient to changes in surface features and processing between encoding and retrieval. We report data from two experiments that extend these findings. In Experiment 1, we showed that a divided attention manipulation (at retrieval) interfered with explicit retrieval of AG knowledge but did not interfere with implicit retrieval. In Experiment 2, we showed that forcing participants to respond within a very tight deadline resulted in the same asymmetric interference pattern between the tasks. In both experiments, we also showed that the type of information being retrieved influenced whether interference was observed. The results are discussed in terms of the relatively automatic nature of implicit retrieval and also with respect to the differences between analytic and nonanalytic processing (Whittlesea Price, 2001).
Resumo:
As the learning paradigm shifts to a more personalised learning process, users need dynamic feedback from their knowledge path. Learning Management Systems (LMS) offer customised feedback dependent on questions and the answers given. However these LMSs are not designed to generate personalised feedback for an individual learner, tutor and instructional designer. This paper presents an approach for generating constructive feedback for all stakeholders during a personalised learning process. The dynamic personalised feedback model generates feedback based on the learning objectives for the Learning Object. Feedback can be generated at Learning Object level and the Information Object level for both the individual learner and the group. The group feedback is meant for the tutors and instructional designer to improve the learning process.
Resumo:
A review of current risk pricing practices in the financial, insurance and construction sectors is conducted through a comprehensive literature review. The purpose was to inform a study on risk and price in the tendering processes of contractors: specifically, how contractors take account of risk when they are calculating their bids for construction work. The reference to mainstream literature was in view of construction management research as a field of application rather than a fundamental academic discipline. Analytical models are used for risk pricing in the financial sector. Certain mathematical laws and principles of insurance are used to price risk in the insurance sector. construction contractors and practitioners are described to traditionally price allowances for project risk using mechanisms such as intuition and experience. Project risk analysis models have proliferated in recent years. However, they are rarely used because of problems practitioners face when confronted with them. A discussion of practices across the three sectors shows that the construction industry does not approach risk according to the sophisticated mechanisms of the two other sectors. This is not a poor situation in itself. However, knowledge transfer from finance and insurance can help construction practitioners. But also, formal risk models for contractors should be informed by the commercial exigencies and unique characteristics of the construction sector.
Resumo:
Background: There is general agreement across all interested parties that a process of working together is the best way to determine which school or educational setting is right for an individual child with autism spectrum disorder. In the UK, families and local authorities both desire a constructive working relationship and see this as the best means by which to reach an agreement to determine where a child should be educated. It has been shown in published works 1 1. Batten and colleagues (Make schools make sense. Autism and education: the reality for families today; London: The National Autistic Society, 2006). View all notes that a constructive working relationship is not always achieved. Purpose: This small-scale study aims to explore the views of both parents and local authorities, focussing on how both parties perceive and experience the process of determining educational provision for children with autism spectrum disorders (ASD) within an English context. Sample, design and method: Parental opinion was gathered through the use of a questionnaire with closed and open responses. The questionnaire was distributed to two national charities, two local charities and 16 specialist schools, which offered the questionnaire to parents of children with ASD, resulting in an opportunity sample of 738 returned surveys. The views of local authority personnel from five local authorities were gathered through the use of semi-structured interviews. Data analyses included quantitative analysis of the closed response questionnaire items, and theme-based qualitative analysis of the open responses and interviews with local authority personnel. Results: In the majority of cases, parents in the survey obtained their first choice placement for their child. Despite this positive outcome, survey data indicated that parents found the process bureaucratic, stressful and time consuming. Parents tended to perceive alternative placement suggestions as financially motivated rather than in the best interests of the child. Interviews with local authority personnel showed an awareness of these concerns and the complex considerations involved in determining what is best for an individual child. Conclusions: This small-scale study highlights the need for more effective communication between parents of children with ASDs and local authority personnel at all stages of the process
Resumo:
Video:35 mins, 2006. The video shows a group of performers in a studio and seminar situation. Individually addressing the camera they offer personal views and experiences of their own art production in relation to the institution, while reflecting on their role as teachers. The performance scripts mainly originate from a series of real interviews with a diverse group of artist teachers, who emphasise the collaborative, performative and subversive nature of teaching. These views may seems symptomatic for contemporary art practices, but are ultimately antagonistic to the ongoing commodification of the system of art education.