884 resultados para High-rise apartment buildings - Design and construction - China


Relevância:

100.00% 100.00%

Publicador:

Resumo:

This article presents a study examining how narrative structure and narrative complexity might influence the performance of second language learners. Forty learners of English in London and sixty learners in Teheran were asked to retell cartoon stories from picture prompts. Each performed two of four narrative tasks that had different degrees of narrative structure (loose or tight) and of storyline complexity (with or without background events). Results support the findings of previous research that tight task structure is connected to increased accuracy and that narratives involving background information give rise to more complex syntax. A comparison of the data from the London and Teheran cohorts showed that the learners in London used significantly more complex syntax and diverse vocabulary even though they did not differ from the Teheran learners in other performance dimensions.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This paper explores the mapping of the environmental assessment process onto design and construction processes. A comparative case study method is used to identify and account for variations in the ‘fit’ between these two processes. The analysis compares eight BREEAM projects (although relevant to LEED, GreenStar, etc.) and distinguishes project-level characteristics and dynamics. Drawing on insights from literature on sustainable construction and assessment methods, an analytic framework is developed to examine the effect of clusters of project and assessment level elements on different types of fit (tight, punctual and bolt-on). Key elements distinguishing between types include: prior working experience with project team members, individual commitment to sustainable construction, experience with sustainable construction, project continuity, project-level ownership of the assessment process, and the nature and continuity of assessor involvement. Professionals with ‘sustainable’ experience used BREEAM judiciously to support their designs (along with other frameworks), but less committed professionals tended to treat it purely as an assessment method. More attention needs to be paid to individual levels of engagement with, and understanding of, sustainability in general (rather than knowledge of technical solutions to individual credits), to ownership of the assessment process and to the potential effect of discontinuities at the project level on sustainable design.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

he construction market around the world has witnessed the growing eminence of construction professional services (CPSs), such as urban planning, architecture, engineering, and consultancy, while the traditional contracting sector remains strong. Nowadays, it is not uncommon to see a design firm taking over the work of a traditional main contractor, or vice versa, of overseeing the delivery of a project. Although the two sectors of contracting and CPS share the same purpose of materializing the built environment, they are as different as they are interrelated. Much has been mentioned about the nexus between the two but little has been done to articulate it using empirical evidence. This study examined the nexus between contracting and CPS businesses by offering and testing lead-lag effects between the two sectors in the international market. A longitudinal panel data composed of 23 top international contractors and CPS firms was adopted. Surprisingly, results of the panel data analyses show that CPS business does not have a significant positive causal effect on contracting as a downstream business, and vice versa. CPS and contracting subsidiaries, although within the same company, do not necessarily form a consortium to undertake the same project; rather, they often collaborate with other CPS or contracting counterparts to undertake projects. This paper provides valuable insights into the sophisticated nexus between contracting and CPS in the international construction market. It will support business executives’ rational decision making for selecting proper contracting or CPS allies, or a proper mergers and acquisitions strategy in the international market. The paper also provides a fresh perspective through which researchers can better investigate the diversification strategies adopted by international contracting and CPS firms.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Environmental building assessment tools have been developed to measure how well or poorly a building is performing, or likely to perform, against a declared set of criteria, or environmental considerations, in order to achieve sustainability principles. Knowledge of environmental building assessment tools is therefore important for successful design and construction of environmentally friendly buildings for countries. The purpose of the research is to investigate the knowledge and level of awareness of environmental building assessment tools among industry practitioners in Botswana. One hundred and seven paper-based questionnaires were delivered to industry practitioners, including architects, engineers, quantity surveyors, real estate developers and academics. Users were asked what they know about building assessment, whether they have used any building assessment tool in the past, and what they perceive as possible barriers to the implementation of environmental building assessment tools in Botswana. Sixty five were returned and statistical analysis, using IBM SPSS V19 software, was used for analysis. Almost 85 per cent of respondents indicate that they are extremely or moderately aware of environmental design. Furthermore, the results indicate that 32 per cent of respondents have gone through formal training, which suggests ‘reasonable knowledge’. This however does not correspond with the use of the tools on the ground as 69 per cent of practitioners report never to have used any environmental building assessment tool in any project. The study highlights the need to develop an assessment tool for Botswana to enhance knowledge and further improve the level of awareness of environmental issues relating to building design and construction.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Purpose – Construction projects usually suffer delays, and the causes of these delays and its cost overruns have been widely discussed, the weather being one of the most recurrent. The purpose of this paper is to analyze the influence of climate on standard construction work activities through a case study. Design/methodology/approach – By studying the extent at which some weather variables impede outdoor work from being effectively executed, new maps and tables for planning for delays are presented. In addition, a real case regarding the construction of several bridges in southern Chile is analyzed. Findings – Few studies have thoroughly addressed the influences of major climatic agents on the most common outdoor construction activities. The method detailed here provides a first approximation for construction planners to assess to what extent construction productivity will be influenced by the climate. Research limitations/implications – Although this study was performed in Chile, the simplified method proposed is entirely transferable to any other country, however, other weather or combinations of weather variables could be needed in other environments or countries. Practical implications – The implications will help reducing the negative social, economic and environmental outcomes that usually emerge from project delays. Originality/value – Climatic data were processed using extremely simple calculations to create a series of quantitative maps and tables that would be useful for any construction planner to decide the best moment of the year to start a project and, if possible, where to build it.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Throughout the industrial processes of sheet metal manufacturing and refining, shear cutting is widely used for its speed and cost advantages over competing cutting methods. Industrial shears may include some force measurement possibilities, but the force is most likely influenced by friction losses between shear tool and the point of measurement, and are in general not showing the actual force applied to the sheet. Well defined shears and accurate measurements of force and shear tool position are important for understanding the influence of shear parameters. Accurate experimental data are also necessary for calibration of numerical shear models. Here, a dedicated laboratory set-up with well defined geometry and movement in the shear, and high measurability in terms of force and geometry is designed, built and verified. Parameters important to the shear process are studied with perturbation analysis techniques and requirements on input parameter accuracy are formulated to meet experimental output demands. Input parameters in shearing are mostly geometric parameters, but also material properties and contact conditions. Based on the accuracy requirements, a symmetric experiment with internal balancing of forces is constructed to avoid guides and corresponding friction losses. Finally, the experimental procedure is validated through shearing of a medium grade steel. With the obtained experimental set-up performance, force changes as result of changes in studied input parameters are distinguishable down to a level of 1%.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

We model the trade-off between the balance and the strength of incentives implicit in the choice between hierarchical and matrix or- ganizational structures. We show that managerial biases determine which structure is optimal: hierarchical forms are preferred when biases are low, while matrix structures are preferred when biases are high. Moreover, the results show that there is always a level of bias for which matrix design can achieve the expected profit obtained by shareholders if they could directly control the firm. We also show that the main trade-off, i.e., hierarchical versus matrix structure is preserved under asymmetric levels of bias among managers and when low-level workers perceive activities with complementary efforts.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

We model the tradeoff between the balance and the strength of incentives implicit in the choice between hierarchical and matrix organizational structures. We show that managerial biases determine which structure is optimal: hierarchical forms are preferred when biases are low, while matrix structures are preferred when biases are high.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This work shows the design, simulation, and analysis of two optical interconnection networks for a Dataflow parallel computer architecture. To verify the optical interconnection network performance on the Dataflow architecture, we have analyzed the load balancing among the processors during the parallel programs executions. The load balancing is a very important parameter because it is directly associated to the dataflow parallelism degree. This article proves that optical interconnection networks designed with simple optical devices can provide efficiently the dataflow requirements of a high performance communication system.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

A 160 mm bore, 7 T split-pair magnet was constructed and tested aiming to mineral processing through HGMS (high gradient magnetic separation) or HCMS (helical channel magnetic separation.) This work describes the design and test results of the pair of coils operating under current in parallel mode. In the case of antiparallel current mode large repulsive force between coils is generated and a strong magnetic field gradient outside the magnet is created. A continuous magnetic separation system made with a helical channel magnetic separator for application in TiO2 processing is analysed.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Cold-formed steel shapes have been widely employed in steel construction, where they frequently offer a lower cost solution than do traditional laminated shapes. A classic application of cold-formed steel shapes is purlins in the roof panel of industrial buildings, connected to the roof panel by means of screws. The combined effect of these two elements has been the subject of investigations in some countries. Design criteria were included in the AISI Code in 1991 and 1996. This paper presents and discusses the results obtained from bending tests carried out on shapes commonly used in Brazil, i.e., the channel and the simple lipped channel, Tests were carried out on double shapes with 4.5 and 6.0 meter spans, which were subjected to concentrated loads and braced against each other on the supports and at intermediary points in three different load situations. The panel shape was also analyzed experimentally, simulating the action of wind by means of a vacuum box designed specifically for this purpose. The test results were then compared to those obtained through the theoretical analysis, enabling us to extract important information upon which to base proposed design criteria for the new Brazilian code.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The necessity of adapting the standardized fan models to conditions of higher temperature has emerged due to the growth of concerning referring to the consequences of the gas expelling after the Mont Blanc tunnel accident in Italy and France, where even though, with 100 fans in operation, 41 people died. However, since then, the defied solutions have pointed to aerodynamic disadvantages or have seemed nonappropriate in these conditions. The objective of this work is to present an alternative to the market standard fans considering a new technology in constructing blades. This new technology introduces the use of the stainless steel AISI 409 due to its good adaptation to temperatures higher than 400°C, particularly exposed to temperatures of gas exhaust from tunnels in fire situation. Furthermore, it presents a very good resistance to corrosion and posterior welding and pressing, due to its alloyed elements. The innovation is centered in the process of a deep drawing of metallic shells and posterior welding, in order to keep the ideal aerodynamic superficies for the fan ideal performance. On the other hand, the finite element method, through the elasto-plastic software COSMOS permitted the verification of the thickness and structural stability of the blade in relation to the aerodynamic efforts established in the project. In addition, it is not advisable the fabrication of blades with variable localized thickness not even, non-uniform ones, due to the verified concentration of tensions and the difficulties observed in the forming. In this way, this study recommends the construction of blades with uniform variations of thickness. © 2007 Springer.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This paper presents the operational analysis of the single-phase integrated buck-boost inverter. This topology is able to convert the DC input voltage into AC voltage with a high static gain, low harmonic content and acceptable efficiency, all in one single-stage. Main functionality aspects are explained, design procedure, system modeling and control, and also component requirements are detailed. Main simulation results are included, and two prototypes were implemented and experimentally tested, where its results are compared with those corresponding to similar topologies available in literature. © 2012 IEEE.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Copepod assemblages from two cascade reservoirs were analyzed during two consecutive years. The upstream reservoir (Chavantes) is a storage system with a high water retention time (WRT of 400 days), and the downstream one (Salto Grande) is a run-of-river system with only 1. 5 days WRT. Copepod composition, richness, abundance, and diversity were correlated with the limnological variables and the hydrological and morphometric features. Standard methods were employed for zooplankton sampling and analysis (vertical 50-μm net hauls and counting under a stereomicroscope). Two hypotheses were postulated and confirmed through the data obtained: (1) compartmentalization is more pronounced in the storage reservoir and determines the differences in the copepod assemblage structure; and (2) the assemblages are more homogeneous in the run-of-river reservoir, where the abundance decreases because of the predominance of washout effects. For both reservoirs, the upstream zone is more distinctive. In addition, in the smaller reservoir the influence of the input from tributaries is stronger (turbid waters). Richness did not differ significantly among seasons, but abundance was higher in the run-of-river reservoir during summer. © 2012 Springer Science+Business Media Dordrecht.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This paper presents a study case in which a geosynthetic-reinforced soil (GRS) structure was used to rebuild a 12 m high slope after its failure. The failed slope is located between the parking lot of a private company and a public school. Due to surrounding structures restrictions, this project required a solution with rapidity in execution. In addition, as a requirement established by its owner, this structure should recover the original geometry of the slope. Besides the importance regarding surrounding constructions, an interesting aspect of this study case relies on the versatility of geosynthetic materials. A woven geotextile was used as reinforcement. Five other geosynthetic materials were used in this study case. Facing comprised a geocell filled with local soil cover and grass mats, resulting in a green facing. A geonet was used to hold the grass mats in place before grass roots development. Regarding the drainage system, geocomposite drains and geopipes were installed to drain subsurface water. A nonwoven geotextile was used as filter in drainage trenches, which were placed near the structure toe. Additionally to the GRS structure, the lower portion of the slope was reinforced with soil nailing technique. The face of the nailed soil portion was covered with sandbags and shotcrete. It emphasizes the flexibility of GRS structures regarding their application with other technical options in Geotechnical Engineering. The economic aspect of this study case also deserves attention. It did not require soil transportation and other design and construction steps, e.g. concrete structures design and construction.