935 resultados para Forecast combination


Relevância:

20.00% 20.00%

Publicador:

Resumo:

The incorporation of numerical weather predictions (NWP) into a flood forecasting system can increase forecast lead times from a few hours to a few days. A single NWP forecast from a single forecast centre, however, is insufficient as it involves considerable non-predictable uncertainties and lead to a high number of false alarms. The availability of global ensemble numerical weather prediction systems through the THORPEX Interactive Grand Global Ensemble' (TIGGE) offers a new opportunity for flood forecast. The Grid-Xinanjiang distributed hydrological model, which is based on the Xinanjiang model theory and the topographical information of each grid cell extracted from the Digital Elevation Model (DEM), is coupled with ensemble weather predictions based on the TIGGE database (CMC, CMA, ECWMF, UKMO, NCEP) for flood forecast. This paper presents a case study using the coupled flood forecasting model on the Xixian catchment (a drainage area of 8826 km2) located in Henan province, China. A probabilistic discharge is provided as the end product of flood forecast. Results show that the association of the Grid-Xinanjiang model and the TIGGE database gives a promising tool for an early warning of flood events several days ahead.

Relevância:

20.00% 20.00%

Publicador:

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Using annual observations on industrial production over the last three centuries, and on GDP over a 100-year period, we seek an historical perspective on the forecastability of these UK output measures. The series are dominated by strong upward trends, so we consider various specifications of this, including the local linear trend structural time-series model, which allows the level and slope of the trend to vary. Our results are not unduly sensitive to how the trend in the series is modelled: the average sizes of the forecast errors of all models, and the wide span of prediction intervals, attests to a great deal of uncertainty in the economic environment. It appears that, from an historical perspective, the postwar period has been relatively more forecastable.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

In this paper we introduce a new testing procedure for evaluating the rationality of fixed-event forecasts based on a pseudo-maximum likelihood estimator. The procedure is designed to be robust to departures in the normality assumption. A model is introduced to show that such departures are likely when forecasters experience a credibility loss when they make large changes to their forecasts. The test is illustrated using monthly fixed-event forecasts produced by four UK institutions. Use of the robust test leads to the conclusion that certain forecasts are rational while use of the Gaussian-based test implies that certain forecasts are irrational. The difference in the results is due to the nature of the underlying data. Copyright © 2001 John Wiley & Sons, Ltd.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

We analyse by simulation the impact of model-selection strategies (sometimes called pre-testing) on forecast performance in both constant-and non-constant-parameter processes. Restricted, unrestricted and selected models are compared when either of the first two might generate the data. We find little evidence that strategies such as general-to-specific induce significant over-fitting, or thereby cause forecast-failure rejection rates to greatly exceed nominal sizes. Parameter non-constancies put a premium on correct specification, but in general, model-selection effects appear to be relatively small, and progressive research is able to detect the mis-specifications.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

We consider methods of evaluating multivariate density forecasts. A recently proposed method is found to lack power when the correlation structure is mis-specified. Tests that have good power to detect mis-specifications of this sort are described. We also consider the properties of the tests in the presence of more general mis-specifications.

Relevância:

20.00% 20.00%

Publicador:

Relevância:

20.00% 20.00%

Publicador:

Resumo:

A number of studies have addressed the relationship between intra-personal uncertainty and inter-personal disagreement about the future values of economic variables such as output growth and inflation using the SPF. By making use of the SPF respondents' probability forecasts of declines in output, we are able to construct a quarterly series of output growth uncertainty to supplement the annual series that are often used in such analyses. We also consider the relationship between disagreement and uncertainty for probability forecasts of declines in output.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

We consider different methods for combining probability forecasts. In empirical exercises, the data generating process of the forecasts and the event being forecast is not known, and therefore the optimal form of combination will also be unknown. We consider the properties of various combination schemes for a number of plausible data generating processes, and indicate which types of combinations are likely to be useful. We also show that whether forecast encompassing is found to hold between two rival sets of forecasts or not may depend on the type of combination adopted. The relative performances of the different combination methods are illustrated, with an application to predicting recession probabilities using leading indicators.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Diabatic processes can alter Rossby wave structure; consequently errors arising from model processes propagate downstream. However, the chaotic spread of forecasts from initial condition uncertainty renders it difficult to trace back from root mean square forecast errors to model errors. Here diagnostics unaffected by phase errors are used, enabling investigation of systematic errors in Rossby waves in winter-season forecasts from three operational centers. Tropopause sharpness adjacent to ridges decreases with forecast lead time. It depends strongly on model resolution, even though models are examined on a common grid. Rossby wave amplitude reduces with lead time up to about five days, consistent with under-representation of diabatic modification and transport of air from the lower troposphere into upper-tropospheric ridges, and with too weak humidity gradients across the tropopause. However, amplitude also decreases when resolution is decreased. Further work is necessary to isolate the contribution from errors in the representation of diabatic processes.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Survey respondents who make point predictions and histogram forecasts of macro-variables reveal both how uncertain they believe the future to be, ex ante, as well as their ex post performance. Macroeconomic forecasters tend to be overconfident at horizons of a year or more, but overestimate (i.e., are underconfident regarding) the uncertainty surrounding their predictions at short horizons. Ex ante uncertainty remains at a high level compared to the ex post measure as the forecast horizon shortens. There is little evidence of a link between individuals’ ex post forecast accuracy and their ex ante subjective assessments.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Many studies evaluating model boundary-layer schemes focus either on near-surface parameters or on short-term observational campaigns. This reflects the observational datasets that are widely available for use in model evaluation. In this paper we show how surface and long-term Doppler lidar observations, combined in a way to match model representation of the boundary layer as closely as possible, can be used to evaluate the skill of boundary-layer forecasts. We use a 2-year observational dataset from a rural site in the UK to evaluate a climatology of boundary layer type forecast by the UK Met Office Unified Model. In addition, we demonstrate the use of a binary skill score (Symmetric Extremal Dependence Index) to investigate the dependence of forecast skill on season, horizontal resolution and forecast leadtime. A clear diurnal and seasonal cycle can be seen in the climatology of both the model and observations, with the main discrepancies being the model overpredicting cumulus capped and decoupled stratocumulus capped boundary-layers and underpredicting well mixed boundary-layers. Using the SEDI skill score the model is most skillful at predicting the surface stability. The skill of the model in predicting cumulus capped and stratocumulus capped stable boundary layer forecasts is low but greater than a 24 hr persistence forecast. In contrast, the prediction of decoupled boundary-layers and boundary-layers with multiple cloud layers is lower than persistence. This process based evaluation approach has the potential to be applied to other boundary-layer parameterisation schemes with similar decision structures.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Arctic sea ice thickness is thought to be an important predictor of Arctic sea ice extent. However, coupled seasonal forecast systems do not generally use sea ice thickness observations in their initialization and are therefore missing a potentially important source of additional skill. To investigate how large this source is, a set of ensemble potential predictability experiments with a global climate model, initialized with and without knowledge of the sea ice thickness initial state, have been run. These experiments show that accurate knowledge of the sea ice thickness field is crucially important for sea ice concentration and extent forecasts up to 8 months ahead, especially in summer. Perturbing sea ice thickness also has a significant impact on the forecast error in Arctic 2 m temperature a few months ahead. These results suggest that advancing capabilities to observe and assimilate sea ice thickness into coupled forecast systems could significantly increase skill.