912 resultados para Development Projects
Resumo:
The organizational design of research and development conditions theincentives of the researchers of the research project. In particular,the organizational form determines the allocation of effort of theresearcher between time spent on research and time spent lobbying management. Researchers prefer to spend their time on research. However,the researchers only get utility from performing research if theproject is approved for its full duration. Spending time lobbyingmanagement for the continuation of the researcher s project increasesthe probability that the management observes a favorable signal aboutthe project. Organizing a research joint venture increases theflexibility of the organizational form with respect to the continuationdecision. For low correlation between the signals of the partners aboutthe expected profitability of the project, we find that the organizationof a research joint venture reduces influence activity by the researchersand increases expected profits of the partners. For high correlationbetween the signals, internal research projects lower influence activityby the researchers. We try to relate the correlation of the partnerssignals to the characteristics of basic research versus more appliedresearch projects, and find that the model is consistent with theobservation that research joint ventures seem involved in more basicresearch projects compared to internal R&D departments, whichconcentrate on more applied research.
Resumo:
FY2007 was a productive year for the Iowa Grape and Wine Development Commission. Fourteen proposals were recommended for funding totaling over $390,000 in outlays. Included in the approved proposals were funds for the establishment and staffing of a Midwest Grape and Wine Institute at Iowa State University, a newly created viticulturist position at Des Moines Area Community College, funding for the first annual Mid-American Wine Competition, and marketing and promotion of four regional cooperative wine events and one wine trail. Commission funding supported a survey of commercial wine producers and grape growers and a new brochure on Iowa’s vineyards. A committee was formed to provide details for a Scholarship Program to aid vineyard and winery staff with the expenses of accredited coursework. Based on the survey conducted and from other governmental and industry sources, the Iowa grape and wine industry appears to continue to be very viable and growth continues at a strong pace. Wine produced in the state for 2007 was estimated at a market value in excess of $12.3 million. A tabulation of the budget revealed that just over $800,000 in wine gallonage tax appropriations have been received into the Grape and Wine Development Fund from 15 FY2003 through FY2007. Expenditures have totaled just over $607,000 during that same time. Just over 80% of expenditures have gone to “Technical” spending. Over time, funds invested in “Technical” programs will translate into an increasingly educated and institutionally-supported industry. Local, regional, and statewide events also appear to be increasing in popularity and the Commission plans to continue and increase support for these events. It is hoped the Scholarship Program will be up and running and funding will need to be appropriated for that project. The Commission also believes many projects and events will become more and more self sustaining as they develop and mature. As they continue to support Iowa’s grape and wine industry, the members of the Commission look forward to working with individuals, commercial enterprises, state and federal agencies, and industry-sponsored institutions in the upcoming year and in years to come.
Resumo:
This paper reports on the purpose, design, methodology and target audience of E-learning courses in forensic interpretation offered by the authors since 2010, including practical experiences made throughout the implementation period of this project. This initiative was motivated by the fact that reporting results of forensic examinations in a logically correct and scientifically rigorous way is a daily challenge for any forensic practitioner. Indeed, interpretation of raw data and communication of findings in both written and oral statements are topics where knowledge and applied skills are needed. Although most forensic scientists hold educational records in traditional sciences, only few actually followed full courses that focussed on interpretation issues. Such courses should include foundational principles and methodology - including elements of forensic statistics - for the evaluation of forensic data in a way that is tailored to meet the needs of the criminal justice system. In order to help bridge this gap, the authors' initiative seeks to offer educational opportunities that allow practitioners to acquire knowledge and competence in the current approaches to the evaluation and interpretation of forensic findings. These cover, among other aspects, probabilistic reasoning (including Bayesian networks and other methods of forensic statistics, tools and software), case pre-assessment, skills in the oral and written communication of uncertainty, and the development of independence and self-confidence to solve practical inference problems. E-learning was chosen as a general format because it helps to form a trans-institutional online-community of practitioners from varying forensic disciplines and workfield experience such as reporting officers, (chief) scientists, forensic coordinators, but also lawyers who all can interact directly from their personal workplaces without consideration of distances, travel expenses or time schedules. In the authors' experience, the proposed learning initiative supports participants in developing their expertise and skills in forensic interpretation, but also offers an opportunity for the associated institutions and the forensic community to reinforce the development of a harmonized view with regard to interpretation across forensic disciplines, laboratories and judicial systems.
Resumo:
In response to the mandate on Load and Resistance Factor Design (LRFD) implementations by the Federal Highway Administration (FHWA) on all new bridge projects initiated after October 1, 2007, the Iowa Highway Research Board (IHRB) sponsored these research projects to develop regional LRFD recommendations. The LRFD development was performed using the Iowa Department of Transportation (DOT) Pile Load Test database (PILOT). To increase the data points for LRFD development, develop LRFD recommendations for dynamic methods, and validate the results of LRFD calibration, 10 full-scale field tests on the most commonly used steel H-piles (e.g., HP 10 x 42) were conducted throughout Iowa. Detailed in situ soil investigations were carried out, push-in pressure cells were installed, and laboratory soil tests were performed. Pile responses during driving, at the end of driving (EOD), and at re-strikes were monitored using the Pile Driving Analyzer (PDA), following with the CAse Pile Wave Analysis Program (CAPWAP) analysis. The hammer blow counts were recorded for Wave Equation Analysis Program (WEAP) and dynamic formulas. Static load tests (SLTs) were performed and the pile capacities were determined based on the Davisson’s criteria. The extensive experimental research studies generated important data for analytical and computational investigations. The SLT measured load displacements were compared with the simulated results obtained using a model of the TZPILE program and using the modified borehole shear test method. Two analytical pile setup quantification methods, in terms of soil properties, were developed and validated. A new calibration procedure was developed to incorporate pile setup into LRFD.
Resumo:
The Rebuild Iowa Office (RIO) continues to coordinate the state‘s recovery effort from the storms, tornadoes and floods of 2008. Much has been accomplished since the Office‘s last quarterly report was issued in July 2010. State funding has been disbursed to help Iowans with unmet needs and housing. Local governments and entities are utilizing millions of federal dollars so thousands of disaster-impacted homeowners can be offered a buyout. More infrastructure projects are under construction and new neighborhoods are being built with mitigation efforts in mind. However, as Iowa continues to celebrate many successes along the road to recovery, it must also address the numerous challenges that are encountered along the path. Recovering from the state‘s largest disaster must be looked at as a marathon, not a sprint. Over the past three months, the RIO has especially remained focused on helping small business owners impacted by the 2008 disasters. Many disaster-affected businesses have reopened their doors, however their debt load continues to be overwhelming and many still struggle with the timeliness of the disbursement of funds. This report describes how programs and recent modifications are working to assist recovering businesses. This report contains updates on housing progress while outlining the complexities behind certain programs and the bottlenecks communities are facing due to strict federal guidelines for implementation. This following pages also describe how Iowa is implementing Smart Planning principles, publicizing flood awareness through outreach efforts and preparing a blueprint for the state to follow when future disasters occur. As always, the RIO recognizes and thanks the countless leaders and front-line workers from local, regional, state and federal government, businesses, non-profit organizations and private citizens that have provided input, support and leadership. Their dedication to Iowa‘s disaster recovery has made the plans and projects on the following pages possible.
Resumo:
For well over 100 years, the Working Stress Design (WSD) approach has been the traditional basis for geotechnical design with regard to settlements or failure conditions. However, considerable effort has been put forth over the past couple of decades in relation to the adoption of the Load and Resistance Factor Design (LRFD) approach into geotechnical design. With the goal of producing engineered designs with consistent levels of reliability, the Federal Highway Administration (FHWA) issued a policy memorandum on June 28, 2000, requiring all new bridges initiated after October 1, 2007, to be designed according to the LRFD approach. Likewise, regionally calibrated LRFD resistance factors were permitted by the American Association of State Highway and Transportation Officials (AASHTO) to improve the economy of bridge foundation elements. Thus, projects TR-573, TR-583 and TR-584 were undertaken by a research team at Iowa State University’s Bridge Engineering Center with the goal of developing resistance factors for pile design using available pile static load test data. To accomplish this goal, the available data were first analyzed for reliability and then placed in a newly designed relational database management system termed PIle LOad Tests (PILOT), to which this first volume of the final report for project TR-573 is dedicated. PILOT is an amalgamated, electronic source of information consisting of both static and dynamic data for pile load tests conducted in the State of Iowa. The database, which includes historical data on pile load tests dating back to 1966, is intended for use in the establishment of LRFD resistance factors for design and construction control of driven pile foundations in Iowa. Although a considerable amount of geotechnical and pile load test data is available in literature as well as in various State Department of Transportation files, PILOT is one of the first regional databases to be exclusively used in the development of LRFD resistance factors for the design and construction control of driven pile foundations. Currently providing an electronically organized assimilation of geotechnical and pile load test data for 274 piles of various types (e.g., steel H-shaped, timber, pipe, Monotube, and concrete), PILOT (http://srg.cce.iastate.edu/lrfd/) is on par with such familiar national databases used in the calibration of LRFD resistance factors for pile foundations as the FHWA’s Deep Foundation Load Test Database. By narrowing geographical boundaries while maintaining a high number of pile load tests, PILOT exemplifies a model for effective regional LRFD calibration procedures.
Resumo:
In response to the mandate on Load and Resistance Factor Design (LRFD) implementations by the Federal Highway Administration (FHWA) on all new bridge projects initiated after October 1, 2007, the Iowa Highway Research Board (IHRB) sponsored these research projects to develop regional LRFD recommendations. The LRFD development was performed using the Iowa Department of Transportation (DOT) Pile Load Test database (PILOT). To increase the data points for LRFD development, develop LRFD recommendations for dynamic methods, and validate the results ofLRFD calibration, 10 full-scale field tests on the most commonly used steel H-piles (e.g., HP 10 x 42) were conducted throughout Iowa. Detailed in situ soil investigations were carried out, push-in pressure cells were installed, and laboratory soil tests were performed. Pile responses during driving, at the end of driving (EOD), and at re-strikes were monitored using the Pile Driving Analyzer (PDA), following with the CAse Pile Wave Analysis Program (CAPWAP) analysis. The hammer blow counts were recorded for Wave Equation Analysis Program (WEAP) and dynamic formulas. Static load tests (SLTs) were performed and the pile capacities were determined based on the Davisson’s criteria. The extensive experimental research studies generated important data for analytical and computational investigations. The SLT measured loaddisplacements were compared with the simulated results obtained using a model of the TZPILE program and using the modified borehole shear test method. Two analytical pile setup quantification methods, in terms of soil properties, were developed and validated. A new calibration procedure was developed to incorporate pile setup into LRFD.
Resumo:
PURPOSE: To select and propose a set of knowledge, attitudes, and skills essential for the care of adolescents; to encourage the development of adolescent health multidisciplinary networks; and to set up training programs in as many European countries as possible. METHODS: The curriculum was developed by 16 physicians from 11 European countries with various professional specializations. In line with modern guidelines in medical education, it is a modular, flexible instrument which covers the main teaching areas in the field, such as basic skills (i.e. setting, rights and confidentiality, gender and cultural issues) as well as specific themes (i.e. sexual and reproductive health, eating disorders, chronic conditions). It consists of 17 thematic modules, each containing detailed objectives, learning approaches, examples, and evaluation methods. RESULT: Two international one-week summer schools were used to assess the feasibility and appropriateness of the curriculum. The overall evaluation was good, with most of the items surpassing three on a four-point Likert scale. However, it pointed to several aspects (process and content) which will need to be refined in the future, such as an increase in interactive sessions (role playing), and a better mix of clinical and public health issues.
Resumo:
This document contains two related, but separate reports. The Juvenile Crime Prevention Community Grant Fund Outcomes Report is a summary of outcomes from services and activities funded through the Juvenile Crime Prevention Community Grant Fund in FY2001. The Juvenile Justice Youth Development Program Summary describes Iowa communities’ current prevention and sanction programs supported with funding from the Division of Criminal and Juvenile Justice Planning (CJJP) during FY2002. The material in Juvenile Crime Prevention Community Grant Fund Outcomes Report is presented in response to a legislative mandate to report specific prevention outcomes for the community Grant Fund. It includes a brief description of a Youth Development Results Framework established by the Iowa Collaboration for Youth Development. Outcomes are reported using this results framework, which was developed by a number of state agencies as a common tool for various state programs involving youth development related planning and funding processes. Included in this report is a description of outcomes from the prevention activities funded, all or in part, by the Community Grant Fund, as reported by local communities. The program summaries presented in the Juvenile Justice Youth Development Program Summary provide an overview of local efforts to implement their 2002 Juvenile Justice Youth Development plans and include prevention and sanction programs funded through the combined resources of the State Community Grant Fund and the Federal Title V Prevention, Juvenile Justice & Delinquency Prevention Act Formula Grant and Juvenile Accountability Incentive Block Grant programs. These combined funds are referred to in this document as the Juvenile Justice Youth Development (JJYD) funds. To administer the JJYD funds, including funds from the Community Grant Fund, CJJP partners with local officials to facilitate a community planning process that determines the communities’ priorities for the use of the funds. The local planning is coordinated by the Iowa’s Decategorization Boards (Decats). These local officials and/or their staff have been leaders in providing oversight or staff support to a variety of local planning initiatives (e.g. child welfare, Comprehensive Strategy Pilot Projects, Empowerment, other) and bring child welfare and community planning experience to the table for the creation of comprehensive community longterm planning efforts. The allocation of these combined funds and the technical assistance received by the Decats from CJJP is believed to have helped enhance both child welfare and juvenile justice efforts locally and has provided for the recognition and establishment of connections for joint child welfare/juvenile justice planning. The allocation and local planning approach has allowed funding from CJJP to be “blended” or “braided” with other local, state, and federal dollars that flow to communities as a result of their local planning responsibilities. The program descriptions provided in this document reflect services and activities supported with JJYD funds. In many cases, however, additional funding sources have been used to fully fund the programs. Most of the information in this document’s two reports was submitted to CJJP by the communities through an on- line planning and reporting process established jointly by the DHS and CJJP.
Resumo:
Highway Research Project HR-392 was undertaken to evaluate cold in-place asphalt recycled (CIR) projects in the State of Iowa. The research involved assessment of performance levels, investigation of factors that most influence pavement performance and economy, and development of guidelines for CIR project selection. The performance was evaluated in two ways: Pavement Condition Indices (PCI, U.S. Corps of Engineers) were calculated and overall ratings were given on ride and appearance. A regression analysis was extrapolated to predict the future service life of CIR roads. The results were that CIR roads within the State of Iowa, with less than 2000 annual average daily traffic (AADT), have an average predicted service life of fifteen to twenty-six years. Subgrade stability problems can prevent a CIR project from being successfully constructed. A series of Dynamic Cone Penetrometer (DCP) tests were conducted on a CIR project that experienced varying levels of subgrade failure during construction. Based on this case study, and supporting data, it was determined that the DCP test can be used to evaluate subgrades that have insufficient stability for recycling. Overall, CIR roads in Iowa are performing well. It appears that the development of transverse cracking has been retarded and little rutting has occurred. Contracting agencies must pay special attention to the subgrade conditions during project selection. Because of its performance, CIR is a recommended method to be considered for rehabilitating aged low volume (<2000 AADT) asphalt concrete roads in Iowa.
Resumo:
The Iowa Department of Transportation (IDOT) has been requiring Critical Path Method (CPM) schedules on some larger or more schedule sensitive projects. The Office of Construction's expectations for enhanced project control and improved communication of project objectives have not been fully met by the use of CPM. Recognizing that the current procedures might not be adequate for all projects, IDOT sponsored a research project to explore the state-of-the-art in transportation scheduling and identify opportunities for improvement. The first phase of this project identified a technique known as the Linear Scheduling Method (LSM) as an alternative to CPM on certain highway construction projects. LSM graphically displays the construction process with respect to the location and the time in which each activity occurs. The current phase of this project was implemented to allow the research team the opportunity to evaluate LSM on all small groups of diverse projects. Unlike the first phase of the project, the research team was closely involved in the project from early in the planning phase throughout the completion of the projects. The research strongly suggests that the linear scheduling technique has great potential as a project management tool for both contractors and IDOT personnel. However, before this technique can become a viable weapon in the project management arsenal, a software application needs to be developed. This application should bring to linear scheduling a degree of functionality as rich and as comprehensive as that found in microcomputer based CPM software on the market today. The research team recommends that the IDOT extend this research effort to include the development of a linear scheduling application.
Resumo:
This report describes the development of performance measures for the Iowa DOT Construction Offices. The offices are responsible for administering all transportation construction projects for the Iowa DOT. In conjunction with a steering team composed of representatives of the Construction Offices, the research team developed a list of eight key processes and a set of measures for each. Two kinds of data were gathered: baseline data and benchmark data. Baseline data is used to characterize current performance. Benchmark data is gathered to find organizations that have excellent performance records for one or more key functions. This report discusses the methodology used and the results obtained. The data obtained represents the first set of data points. Subsequent years will establish trends for each of the measures, showing improvement or lack of it.
Resumo:
Bridge deck cracking occasionally occurs during construction for any number of reasons. Improper design, concrete placement or deck curing can result in cracks. One contributing factor toward cracking may be dead load deflections induced during concrete placement. For both continuous and non-continuous bridges, specific placement sequences are required to minimize harmful deflections in previously placed sections. Set retarding admixtures are also used to keep previously placed concrete plastic until the pour is completed. The problem is--at what point does movement of the concrete cause permanent damage to the deck. The study evaluated the time to crack formation relationship for mixes with low and high dosages of set retarding admixtures currently approved for use in Iowa state and county projects.
Resumo:
Background: This paper aimed to use the Delphi technique to develop a consensus framework for a multinational, workplace walking intervention. Methods: Ideas were gathered and ranked from eight recognized and emerging experts in the fields of physical activity and health, from universities in Australia, Canada, England, the Netherlands, Northern Ireland, and Spain. Members of the panel were asked to consider the key characteristics of a successful campus walking intervention. Consensus was reached by an inductive, content analytic approach, conducted through an anonymous, three-round, e-mail process. Results: The resulting framework consisted of three interlinking themes defined as “design, implementation, and evaluation.” Top-ranked subitems in these themes included the need to generate research capacity (design), to respond to group needs through different walking approaches (implementation), and to undertake physical activity assessment (evaluation). Themes were set within an underpinning domain, referred to as the “institution” and sites are currently engaging with subitems in this domain, to provide sustainable interventions that reflect the practicalities of local contexts and needs. Conclusions: Findings provide a unique framework for designing, implementing, and evaluating walking projects in universities and highlight the value of adopting the Delphi technique for planning international, multisite health initiatives.
Resumo:
Sufficient evidence was not discovered in this brief search to alter the general opinion that the Serviceability (Present Serviceability Index-PSI) - Performance Concepts developed by the AASHO Road Test provides the optimum engineering basis for pavement management. Use of these concepts in Iowa has the additional advantage in that we have a reasonable quantity of historical data over a period of time on the change in pavement condition as measured by PSI's. Some additional benefits would be the ability to better assess our needs with respect to those being recommended to Congress by AASHTO Committees. These concepts have been the basis used for developing policies on dimensions and weight of vehicles and highway needs which the AASHTO Transport Committees have recommended to the United States House Committee on Ways and Means. The first recommendation based on these concepts was made in the mid 1960's. Iowa's participation in the evaluation for this recommendation was under the direction of our present Director of Transportation, Mr. Raymond Kassel. PSI Indexes had to be derived from subjective surface ratings at that time. The most recent recommendation to Congress was made in November of 1977. Based on the rationale expressed above, a pilot study of the major part of the rural interstate system was conducted. The Objective of the study was to measure pavement performance through the use of the Present Serviceability Index (PSI) - Pavement Performance concepts as developed by the AASHO Road Test and to explore the usefulness of this type of data as a pavement management tool. Projects in the vicinity of the major urban centers were not included in this study due to the extra time that would be required to isolate accurate traffic data in these areas. Projects consisting of asphalt surface courses on crushed stone base sections were not included.