748 resultados para Construction industry - Economic aspects - China
Resumo:
Purpose: Recent knowledge management (KM) literature suggests that KM activities are influenced by the elements of the internal business environment (BE) of organisations. This paper attempts to provide some unique insights into the contextual input of the KM process through empirically identifying the major factors (i.e. “forces”) within the internal BE of construction organisations operating in Hong Kong, and investigating their impact on the intensity of KM activities. Design/methodology/approach: A questionnaire survey was administered to a sample of construction contractors operating in Hong Kong to elicit opinions on the internal BE and intensity of KM activities as executed by targeted organisations. A total of 149 usable responses were received from 99 organisations representing about 38 percent of the research population. In parallel, to the survey, a total of 15 semi-structured interviews were undertaken to provide more insights into the phenomenon under investigation. Findings: Supported by the empirical and qualitative evidence, this study established that firstly, both organisational and technical environments have the capacity to either positively or negatively impact the intensity of KM activities, and both environments serve as stimuli in increasing each other's dynamism; secondly, certain types of KM activities are stronger “energy receivers” and easily to be “powered up” by manipulating factors representing these two environments. Then, through interactions between KM activities, the intensity of the whole strategic KM cycle will be increased thus helping to strengthen organisational competitive advantage.
Resumo:
Purpose – The purpose of this paper is to provide a new type of entry mode decision-making model for construction enterprises involved in international business. Design/methodology/approach – A hybrid method combining analytic hierarchy process (AHP) with preference ranking organization method for enrichment evaluations (PROMETHEE) is used to aid entry mode decisions. The AHP is used to decompose the entry mode problem into several dimensions and determine the weight of each criterion. In addition, PROMETHEE method is used to rank candidate entry modes and carry out sensitivity analyses. Findings – The proposed decision-making method is demonstrated to be a suitable approach to resolve the entry mode selection decision problem. Practical implications – The research provides practitioners with a more systematic decision framework and a more precise decision method. Originality/value – The paper sheds light on the further development of entry strategies for international construction markets. It not only introduces a new decision-making model for entry mode decision making, but also provides a conceptual framework with five determinants for a construction company entry mode selection based on the unique properties of the construction industry.
Resumo:
In the absence of a benchmarking mechanism specifically designed for local requirements and characteristics, a carbon dioxide footprint assessment and labelling scheme for construction materials is urgently needed to promote carbon dioxide reduction in the construction industry. This paper reports on a recent interview survey of 18 senior industry practitioners in Hong Kong to elicit their knowledge and opinions concerning the potential of such a carbon dioxide labelling scheme. The results of this research indicate the following. A well-designed carbon dioxide label could stimulate demand for low carbon dioxide construction materials. The assessment of carbon dioxide emissions should be extended to different stages of material lifecycles. The benchmarks for low carbon dioxide construction materials should be based on international standards but without sacrificing local integrity. Administration and monitoring of the carbon dioxide labelling scheme could be entrusted to an impartial and independent certification body. The implementation of any carbon dioxide labelling schemes should be on a voluntary basis. Cost, functionality, quality and durability are unlikely to be replaced by environmental considerations in the absence of any compelling incentives or penalties. There are difficulties in developing and operating a suitable scheme, particularly in view of the large data demands involved, reluctance in using low carbon dioxide materials and limited environmental awareness.
Resumo:
Knowledge Management (KM) is a process that focuses on knowledge-related activities to facilitate knowledge creation, capture, transformation and use, with the ultimate aim of leveraging organisations’ intellectual capital to achieve organisational objectives. Organisational culture and climate have been identified as major catalysts to knowledge creation and sharing, and hence are considered important dimensions of KM research. The fragmented and hierarchical nature of the construction industry illustrates its difficulties to operate in a co-ordinated and homogeneous way when dealing with knowledge-related issues such as research and development, training and innovation. The culture and climate of organisations operating within the construction industry are profoundly shaped by the long-established characteristics of the industry, whilst also being influenced by the changes within the sector. Meanwhile, the special project-based structure of construction organisations constitutes additional challenges in facing knowledge production. The study this paper reports on addresses the impact of organisational culture and climate on the intensity of KM activities within construction organisations, with specific focus on the managerial activities that help to manage these challenges and to facilitate KM. A series of semi-structured interviews were undertaken to investigate the KM activities of the contractors operating in Hong Kong. The analysis on the qualitative data revealed that leadership on KM, innovation management, communication management and IT development were key factors that impact positively on the KM activities within the organisations under investigation.
Resumo:
The overarching goal of this project is to better match funding strategies to industry needs to maximise the benefits of R&D to Australia’s infrastructure and building industry. Project partners are: Queensland Department of Public Works; Queensland Transport and Main Roads; Western Australian Department of Treasury and Finance; John Holland; Queensland University of Technology; Swinburne University of Technology; and VTT Technical Research Centre of Finland (Prof Göran Roos). This project has been endorsed by the Australian Built Environment Industry Innovation Council (BEIIC) with Council member Prof Catherin Bull serving on this project’s Steering Committee. This project seeks to: (i) maximise the value of R&D investment in this sector through improved understanding of future industry research needs; and (ii) address the perceived problem of a disproportionately low R&D investment in this sector, relative to the size and national importance of the sector. This research will develop new theory built on open innovation, dynamic capabilities and absorptive capacity theories in the context of strategic foresighting and roadmapping activities. Four project phases have been designed to address this research: 1: Audit and analysis of R&D investment in the Australian built environment since 1990 - access publically available data relating to R&D investments across Australia from public and private organisations to understand past trends. 2: Examine diffusion mechanisms of research and innovation and its impact on public and private organisations – investigate specific R&D investments to determine the process of realising research support, direction-setting, project engagement, impacts and pathways to adoption. 3: Develop a strategic roadmap for the future of this critical Australian industry - assess the likely future landscapes that R&D investment will both respond to and anticipate. 4: Develop policy to maximise the value of R&D investments to public and private organisations – through translating project learnings into policy guidelines.
Resumo:
Several methods of estimating the costs or price of construction projects are now available for use in the construction industry. It is difficult due to the conservative approach of estimators and quantity surveyors, and the fact that the industry is undergoing one of its deepest recessions this century, to implement any changes in these processes. Several methods have been tried and tested and probably discarded forever, whereas other methods are still in their infancy. There is also a movement towards greater use of the computer, whichever method seems to be adopted. An important consideration with any method of estimating is the accuracy by which costs can be calculated. Any improvement in this consideration will be welcomed by a11 parties, because existing methods are poor when measured by this criteria. Estimating, particularly by contractors, has always carried some mystic, and many of the processes discussed both in the classroom and in practice are little more than fallacy when properly investigated. What makes an estimator or quantity surveyor good at forecasting the right price? To what extent does human behaviour influence or have a part to play? These and some of the other aspects of effective estimating are now examined in more detail.
Resumo:
Reports of immoral marketing practices i n the construction industry attract political, media and public but not much academic interest. This paper adopts a behavioural perspective and proposes a model for applying marketing ethics concepts and methods in the study of collusion in the construction contract market. An extensive multidisciplinary review of existing literature identified a lack of adequate conceptualisation of the mechanisms and decision making factors of collusive tendering. The process of developing the model is detailed in this paper. The objectives and methodology of the research project that tested the model are also outlined. The paper concludes with a brief note on the contributions and application of the proposed model.
Resumo:
The acquisition and management of knowledge is the dominant source of organisational com-petitive advantage. As innovation processes in the management and procurement of construc-tion activities are becoming increasingly interactive, knowledge management (KM) has been widely recognised by construction organisations as an essential tool to be employed when dealing with growing complexity and cost of projects as well as increasing client demands. KM requires deliberate efforts by an organisation to maximise its performance through the acquisition, dissemination and leveraging of the organisation’s intellectual assets. The Hong Kong (HK) construction market has been described as one of the most open and globally competitive. This paper reports on KM practices within the HK construction industry, and through the analysis of a self-administered questionnaire survey, reveals managers’ opinions of the formal and informal KM practices that could be used to manage the flow of knowledge, and identifies the level of implementation within their organisations. The differences between managers’ perception and the actual state of implementation – as reported by the same man-agers – are statistically examined. The analysis leads to better understanding of how HK con-struction professionals currently manage organisational knowledge, and what areas for poten-tial improvement exist.
Resumo:
This paper presents a case study of the participatory project in the Jombang glass bead craft industry. Economic instability has brought significant business challenges in the community. The involvement of outsiders to collaborate with craftspeople in order to support business innovation as well as strengthen the social capital in the community is essential. However, facilitating a rural community to formulate and implement bottom-up planning needs an integrated approach. In this paper, we explain a participatory project in the rural craftspeople community that resulted in a collective action. The project aimed at uniting and empowering rural craftspeople focusing on the unique skills and knowledge of participants. There are some aspects influencing the success of collective action: the ability to understand the local political situation; the role of facilitators to respect and support the unique potential of craftspeople; and the economic benefit of the program.
Resumo:
There is increasing concern about the impact of employees’ alcohol and other drug (AOD) consumption on workplace safety, particularly within the construction industry. No known study has scientifically evaluated the relationship between the use of drugs and alcohol and safety impacts in construction, and there has been only limited adoption of nationally coordinated strategies, supported by employers and employees to render it socially unacceptable to arrive at a construction workplace with impaired judgment from AODs. This research aims to scientifically evaluate the use of AODs within the Australian construction industry in order to reduce the potential resulting safety and performance impacts and engender a cultural change in the workforce. Using the Alcohol Use Disorders Identification Test (AUDIT), the study will adopt both quantitative and qualitative methods to evaluate the extent of general AOD use in the industry. Results indicate that a proportion of the construction sector may be at risk of hazardous alcohol consumption. A total of 286 respondents (58%) scored above the cut-off score for risky alcohol use with 43 respondents (15%) scoring in the significantly ‘at risk’ category. Other drug use was also identified as a major issue that must be addressed. Results support the need for evidence-based, preventative educational initiatives that are tailored specifically to the construction industry.
Resumo:
This paper reviews innovation activity in a key service industry – road and bridge construction. Based on a large-scale Australian survey and descriptive statistics, the paper finds that there is little difference in innovation levels between different types of industry participants and that innovation is difficult to implement. The survey gathered responses from suppliers, consultants, contracts and clients and compared results across these four industry sectors. The absorptive capacity and relationship capacities of respondents were also investigated. One in five respondents had poor absorptive capacity. Suppliers were found to the most effective learners and were the best adopters of ideas from outside their organisations and consultants were the least effective. Australian construction organisations have relatively good relationship skills because relationship-based contracts are common compared to other countries. Indeed, the survey found that nearly 60% of respondents had experience with such contracts, with clients having more experience than the other three sectors. The results have implications for the measurement of innovation in project-based industries, and the relative roles of clients and suppliers in driving innovation in the construction industry. Further research will examine the extent to which particular governance mechanisms within relationship contracts lead to improved innovation and project performance.
Resumo:
With unpredictable workloads and a need for a multitude of specialized skills, many main contractors rely heavily on subcontracting to reduce their risks (Bresnen et al., 1985; Beardsworth et al., 1988). This is especially the case In Hong Kong, where the average direct labour content accounts for only around 1% of the total contract sum (Lai, 1987). Extensive usage of subcontracting is also reported in many other countries, including the UK (Gray and Flanagan, 1989) and Japan (Bennett et al., 1987). In addition, and depending upon the scale and complexity of works, it is not uncommon for subcontractors to further sublet their works to lower tier(s) subcontractors. Richter and Mitchell (1982) argued that main contractors can obtain a higher profit margin by reducing their performance costs by subcontracting work to those who have the necessary resources to perform the work more efficiently and economically. Subcontracting is also used strategically to allow firms to employ a minimum work force under fluctuating demand (Usdiken and Sözen, 1985). Through subcontracting, the risks of main contractors are also reduced, as errors in estimating or additional costs caused by delays or extra labour requirements can be absorbed by the subcontractors involved (Woon and Ofori, 2000). Despite these benefits, the quality of work can suffer when incapable or inexperienced subcontractors are employed. Additional problems also exist in the form of bid shopping, unclear accountability, and high fragmentation (Palaneeswaran et al., 2002). A recent CIB TG 23 International Conference, October 2003, Hong Kong report produced by the Hong Kong Construction Industry Review Committee (CIRC) points to development of a framework to help distinguish between capable and incapable subcontractors (Tang, 2001). This paper describes research aims at identifying and prioritising criteria for use in such a framework.
Resumo:
It is well-known that the use of off-site manufacture (OSM) techniques can assist in timely completion of a construction project though the utilisation of such techniques may have other disadvantages. Currently, OSM uptake within the Australian construction industry is limited. To successfully incorporate OSM practices within a construction project, it is crucial to understand the impact of OSM adoption on the processes used during a construction project. This paper presents how a systematic process-oriented approach may be able to support OSM utilisation within a construction project. Process modelling, analysis and automation techniques which are well-known within the Business Process Management (BPM) discipline have been applied to develop a collection of construction process models that represent the end-to-end generic construction value chain. The construction value chain enables researchers to identify key activities, resources, data, and stakeholders involved in construction processes in each defined construction phase. The collection of construction process models is then used as a basis for identification of potential OSM intervention points in collaboration with domain experts from the Australian construction industry. This ensures that the resulting changes reflect the needs of various stakeholders within the construction industry and have relevance in practice. Based on the input from the domain experts, these process models are further refined and operational requirements are taken into account to develop a prototype process automation (workflow) system that can support and coordinate OSM-related process activities. The resulting workflow system also has the potential to integrate with other IT solutions used within the construction industry (e.g., BIM, Acconex). As such, the paper illustrates the role that process-oriented thinking can play in assisting OSM adoption within the industry.
Resumo:
Purpose Most barriers and enablers of sustainable projects are related to procurement. This study proposes a framework for evaluating green procurement practices throughout the lifecycle of road construction projects and demonstrates its application through an Australian case study. Design/methodology/approach The study is based on linking the phases of road construction with incentive mechanisms for proactively motivating behavioural change. A holistic view on utilised and potential incentives is attempted with a literature review and a state-of-practice review. The latter is based on interviews and 90 policy and procurement documents across five Australian states. Findings An evaluation framework with seven procurement stages is suggested to describe current state green procurement incentives throughout the delivery lifecycle of road construction projects. The Australian case study was found to provide useful data to identify gaps and strong points of the different states regarding their level of integration of sustainability and greenhouse gas emissions GHG) reduction elements in their procurement practices. This understanding was used to draw recommendations on future advancement of green procurement. Originality/value: Government entities across the globe can impact considerably the achievement of sustainability and GHG targets, by using their procurement practices and requirements to create incentives for contractors and suppliers to engage in more GHG conscious practices. The present study provides a systematic account of how green procurement practices can be underpinned using the Australian road construction industry as a case study, and distinguish between strong and weak links in the green procurement chain to draw recommendations for future initiatives.
Resumo:
The absorptive capacity of organisations is one of the key drivers of innovation performance in any industry. This research seeks to refine our understanding of the relationship between absorptive capacity and innovation performance, with a focus on characterising the absorptive capacity of the different participant groups within the Australian road industry supply chain. One of the largest and most comprehensive surveys ever undertaken of innovation in road construction was completed in 2011 by the Queensland University of Technology (QUT), based on the Australian road industry. The survey of over 200 construction industry participants covered four sectors, comprising suppliers (manufacturers and distributors), consultants (engineering consultants), contractors (head and subcontractors) and clients (state government road agencies). The survey measured the absorptive capacity and innovation activity exhibited by organisations within each of these participant groups, using the perceived importance of addressing innovation obstacles as a proxy for innovation activity. One of the key findings of the survey is about the impact of participant competency on product innovation activity. The survey found that the absorptive capacity of industry participants had a significant and positive relationship with innovation activity. Regarding the distribution of absorptive capacity, the results indicate that suppliers are more likely to have high levels of absorptive capacity than the other participant groups, with 32% of suppliers showing high absorptive capacity, ahead of contractors (18%), consultants (11%), and clients (7%). These results support the findings of previous studies in the literature and suggest the importance of policies to enhance organisational learning, particularly in relation to openness to new product ideas.