1000 resultados para Construction de sens
Resumo:
Discarded tires have become a major disposal problem in the U.S. Different techniques of recycling these discarded tires have been tried. The state of Iowa is currently evaluating the use of discarded tires ground into crumb rubber and blending it with asphalt to make asphalt rubber cement (ARC}. This was the sixth project this process has been used in. This project is located on US 169 from the east junction of IA 175 west and north to US 20. Only the binder course was placed this year with the surface course to be let at a later date. There are four test sections, two sections with conventional mixtures and two with ARC mixtures.
Resumo:
Discarded tires present major disposal and environmental problems. One method of recycling tires is to use finely ground rubber from tires in asphalt cement concrete (ACC). This process has been researched in Iowa since 1991. There are currently eight projects being researched. This project involved using crumb rubber modifier (CRM) in ACC using a dry process. This project is located on US 63 in Howard County. It involved 17 test sections. There were five test sections using 20 lb of CRM per ton, four test sections using 10 lb of CRM per ton and eight test sections using a conventional mix. Not only were different mixes used, but the overlay was also placed in various thicknesses ranging from 2 in. to 8 in. (5 cm to 20 cm). The project was completed in August 1994. The project construction went well with only minor problems. This report contains information about procedures and tests that were completed and those that will be completed. Evaluation on the project will continue for five years.
Resumo:
Corroded, deteriorated, misaligned, and distorted drainage pipes can cause a serious threat to a roadway. Normal practice is to remove and replace the damaged drainage structure. An alternative method of rehabilitating these structures is to slip line them with a polyethylene liner. Twelve drainage structures were slip lined with polyethylene liners during 1994 in Iowa. Two types of liners installed were "Culvert Renew" and "Snap-Tite". It was found that the liners could be easily installed by most highway, county, and city maintenance departments. The liners restore the flow and increase the service life of the original drainage structure. The liners were found to be cost competitive with the removal and replacement of the existing drainage structure. Slip lining has the largest economic benefit when the roadway is paved, the culvert is under a deep fill, or traffic volumes are high. The annular space between the original pipe and the liner was filled with flowable mortar. Care should be taken to properly brace and grout the annular space between the liner and the culvert.
Resumo:
In today's era of advanced methods, it is interesting that a centuries-old Roman road-building concept can be the most attractive alternative available. The need for a less expensive road base construction method is very apparent, especially to the county engineer faced with maintaining quality lower traffic volume farm-to-market roads. The revival of the Macadam stone base is one possible solution. Des Moines County believed a Macadam road had excellent possibilities for their particular needs. They proposed a research project designed to eliminate some of the unknown factors of Macadam stone base construction. It is the intent of this research project to develop standardized design procedures and serve as an aid for others in constructing a Macadam base roadway. The Iowa Department of Transportation has published special provisions for the construction of Macadam stone bases that were adopted as the guideline specifications for the research project.
Resumo:
The earliest overall comprehensive work on the use of fly ash in concrete was reported by Davis and Associates of the University of California in 1937. Since that time there have been numerous applications of the use and varying proportions of fly ash in portland cement concrete mixes. Fly ash is a pozzolanic powdery by-product of the coal combustion process which is recovered from flue gases and is generally associated with electric power generating plants. Environmental regulations enacted in recent years have required that fly ash be removed from the flue gases to maintain clean air standards. This has resulted in an increased volume of high quality fly ash that is considered a waste product or a by-product that can be utilized in products such as portland cement concrete. There are several sources of the high quality fly ash located in Iowa currently producing a combined total of 281,000 tons of material annually. Due to recent cement shortages and the rapidly increasing highway construction costs, the Iowa Department of Transportation has become interested in utilizing fly ash in portland cement concrete paving mixes. A preliminary review of the Iowa Department of Transportation Materials Laboratory study indicates that a substitution of fly ash for portland cement, within limits, is ·not detrimental to the overall concrete quality. Also the use of fly ash in concrete would reduce the cement consumption as well as provide a potential cost savings in areas where high quality fly ash is available without excessive transportation costs. The previously expressed concerns have shown the need for a research project to develop our knowledge of fly ash replacement in the Iowa Department of Transportation portland cement concrete paving mixes.
Resumo:
This construction report describes a project investigating macadam base construction of roads. The objectives of this project were to: 1. identify a cost effective asphalt emulsion bound macadam typical cross section; 2. obtain useful data comparing seven typical cross sections; 3. determine the effectiveness of engineering fabric placed under macadam roadbeds; and 4. evaluate the use of emulsions in surface seal coats.
Resumo:
This study explores the cognitive structures, understood as construct systems, of patients suffering from bulimia nervosa (BN). Previous studies investigated the construct systems of disordered eaters suggesting that they had a higher distance between their construction of the self and the «ideal self», and also more rigidity. In addition to these aspects, this study explored the presence of implicative dilemmas (ID). Thirty two women who met criteria for BN and were treated in a specialized center were compared to a non clinical group composed by 32 women matched by age. All participants were assessed using Repertory Grid Technique (RGT). In BN patients it was more common (71.9%) to find IDs than in controls (18.8%). They also showed higher polarization and higher self-ideal discrepancies (even more for those with a long history of BN). The measures provided by the RGT can be useful for the assessment of self-construction and cognitive conflicts in BN patients and to appreciate their role in this disorder. In addition, this technique could be helpful for clinicians to explore the patient"s constructs system, and specially to identify IDs that could be maintaining the symptoms or hindering change in order to focus on them to facilitate improvement.
Resumo:
This report describes a new approach to the problem of scheduling highway construction type projects. The technique can accurately model linear activities and identify the controlling activity path on a linear schedule. Current scheduling practices are unable to accomplish these two tasks with any accuracy for linear activities, leaving planners and manager suspicious of the information they provide. Basic linear scheduling is not a new technique, and many attempts have been made to apply it to various types of work in the past. However, the technique has never been widely used because of the lack of an analytical approach to activity relationships and development of an analytical approach to determining controlling activities. The Linear Scheduling Model (LSM) developed in this report, completes the linear scheduling technique by adding to linear scheduling all of the analytical capabilities, including computer applications, present in CPM scheduling today. The LSM has tremendous potential, and will likely have a significant impact on the way linear construction is scheduled in the future.
Resumo:
An asphalt concrete (ACC) overlay is most often the rehabilitative effort used to maintain the serviceability of either an ACC or PCC pavement. The major problem in durability of this ACC overlay comes from reflective cracking. These cracks usually open, allowing water to enter the unsealed crack and strip the ACC in the overlay. The stripping of the ACC allows accelerated deterioration at the crack. Two engineering fabrics were evaluated in this project in order to determine their effectiveness in reducing reflective cracking. These two materials are: PavePrep, Contech Construction Products, Inc., and Pro-Guard, Phillips Fiber Corporation. A 4.2 km (2.6 mi) roadway in Audubon County was selected for the research project. The roadway was divided into eight test sections. Four of the test sections are conventional resurfacing. The other four sections are split between the two engineering fabrics (two Pro-Guard and two PavePrep). A 75 mm (3 in.) thick overlay was placed over the entire project.
Resumo:
This report describes the development of performance measures for the Iowa DOT Construction Offices. The offices are responsible for administering all transportation construction projects for the Iowa DOT. In conjunction with a steering team composed of representatives of the Construction Offices, the research team developed a list of eight key processes and a set of measures for each. Two kinds of data were gathered: baseline data and benchmark data. Baseline data is used to characterize current performance. Benchmark data is gathered to find organizations that have excellent performance records for one or more key functions. This report discusses the methodology used and the results obtained. The data obtained represents the first set of data points. Subsequent years will establish trends for each of the measures, showing improvement or lack of it.
Resumo:
This report describes the continuation of the development of performance measures for the Iowa Department of Transportation (DOT) Offices of Construction. Those offices are responsible for administering transportation construction projects for the Iowa DOT. Researchers worked closely with the Benchmark Steering Team which was formed during Phase I of this project and is composed of representatives of the Offices of Construction. The research team conducted a second survey of Offices of Construction personnel, interviewed numerous members of the Offices and continued to work to improve the eight key processes identified during Phase I of this research. The eight key processes include Inspection of Work, Resolution of Technical Issues, Documentation of Work Progress and Pay Quantities, Employee Training and Development, Continuous Feedback for Improved Contract Documents, Provide Safe Traffic Control, External/Public Communication, and Providing Pre-Letting Information. Three to four measurements were specified for each key process. Many of these measurements required opinion surveys of employees, contractors, and others. During Phase II, researchers concentrated on conducting surveys, interviewing respondents to improve future surveys, and facilitating Benchmark Steering Team monthly meetings. Much effort was placed on using the information collected during the first year's research to improve the effectiveness and efficiency of the Offices of Construction. The results from Process Improvement Teams that studied Traffic Control and Resolution of Technical Issues were used to improve operations.
Resumo:
The use of deicing salts in this part of the country is a necessity to remove ice from our bridges. The use of these salts has always been a problem since the chloride-ions penetrate the concrete and reach the steel and cause corrosion which eventually cause deterioration of both the steel and concrete. One method used to try to prevent this from happening was to apply a waterproof membrane to the concrete after it was placed. This method did help, but was not cost effective as the longevity of the membrane system was of relatively short duration. For this reason, this research project was initiated. After the original deck was placed a second layer of concrete about 1 1/2" thick was placed on top. Biennial evaluation of the decks included testing for delaminations and steel corrosion. Cores were also obtained for a chloride analysis. Testing and observations showed the two-layer bridge deck to be effective in preventing corrosion. Since the time this project was initiated, epoxy steel has been introduced and is a cost effective way to protect the steel from corrosion.
Resumo:
The road paving cost continues to increase and the backlog of projects waiting for funding is growing. Finding a more cost-effective way to use the available money to pave roads will result in more miles of road being paved with the same amount of money. This project is in Cass County on G35 between US 71 and Norway-Center. It consists of a thin layer of asphalt over a base designed to achieve stability while having some permeability. This project was paved in 1996. An asphalt cement concrete pavement was chosen for the project based on cost, convenience, and historic portland cement concrete problems in Cass County. The new pavement gives quicker access time to farms and residences.