807 resultados para American Wind Energy Association
Resumo:
The consumption of energy on the planet is currently based on fossil fuels. They are responsible for adverse effects on the environment. Renewables propose solutions for this scenario, but must face issues related to the capacity of the power supply. Wind energy offshore emerging as a promising alternative. The speed and stability are greater winds over oceans, but the variability of these may cause inconvenience to the generation of electric power fluctuations. To reduce this, a combination of wind farms geographically distributed was proposed. The greater the distance between them, the lower the correlation between the wind velocity, increasing the likelihood that together achieve more stable power system with less fluctuations in power generation. The efficient use of production capacity of the wind park however, depends on their distribution in marine environments. The objective of this research was to analyze the optimal allocation of wind farms offshore on the east coast of the U.S. by Modern Portfolio Theory. The Modern Portfolio Theory was used so that the process of building portfolios of wind energy offshore contemplate the particularity of intermittency of wind, through calculations of return and risk of the production of wind farms. The research was conducted with 25.934 observations of energy produced by wind farms 11 hypothetical offshore, from the installation of 01 simulated ocean turbine with a capacity of 5 MW. The data show hourly time resolution and covers the period between January 1, 1998 until December 31, 2002. Through the Matlab R software, six were calculated minimum variance portfolios, each for a period of time distinct. Given the inequality of the variability of wind over time, set up four strategies rebalancing to evaluate the performance of the related portfolios, which enabled us to identify the most beneficial to the stability of the wind energy production offshore. The results showed that the production of wind energy for 1998, 1999, 2000 and 2001 should be considered by the portfolio weights calculated for the same periods, respectively. Energy data for 2002 should use the weights derived from the portfolio calculated in the previous time period. Finally, the production of wind energy in the period 1998-2002 should also be weighted by 1/11. It follows therefore that the portfolios found failed to show reduced levels of variability when compared to the individual production of wind farms hypothetical offshore
Resumo:
The research and development of wind turbine blades are essential to keep pace with worldwide growth in the renewable energy sector. Although currently blades are typically produced using glass fiber reinforced composite materials, the tendency for larger size blades, particularly for offshore applications, has increased the interest on carbon fiber reinforced composites because of the potential for increased stiffness and weight reduction. In this study a model of blade designed for large generators (5 MW) was studied on a small scale. A numerical simulation was performed to determine the aerodynamic loading using a Computational Fluid Dynamics (CFD) software. Two blades were then designed and manufactured using epoxy matrix composites: one reinforced with glass fibers and the other with carbon fibers. For the structural calculations, maximum stress failure criterion was adopted. The blades were manufactured by Vacuum Assisted Resin Transfer Molding (VARTM), typical for this type of component. A weight comparison of the two blades was performed and the weight of the carbon fiber blade was approximately 45% of the weight of the fiberglass reinforced blade. Static bending tests were carried out on the blades for various percentages of the design load and deflections measurements were compared with the values obtained from finite element simulations. A good agreement was observed between the measured and calculated deflections. In summary, the results of this study confirm that the low density combined with high mechanical properties of carbon fibers are particularly attractive for the production of large size wind turbine blades
Resumo:
Coordenação de Aperfeiçoamento de Pessoal de Nível Superior (CAPES)
Resumo:
Performance measurement in highly competitive markets is a necessary measure for those who aim the top positions. The business performance measurement approach have reached relevant results in the literature, however, a different approach has recently appeared that broadened the perception of competition, where companies do not seek the competition among companies only, but also among supply chains. Brazilian Wind energy supply chain is living a structuring and expanding moment, with the major global players in the industry making investments in the country. This research aims to answer which are the key performance indicators that must be considered by the Brazilian wind energy sector companies, which are part in a broad perspective of supply chain competition. The research was executed in two steps: exploratory (literature review and a field research in the companies) and later a survey was conducted with the Brazilian Wind energy companies workers with the purpose to validate the performance indicators found in the exploratory step. The survey evaluated 40 performance indicators distributed among five major activities: Project prospection, building/execution, operation and maintenance, logistics and transverse processes, which summarize the performance of the entire supply chain, pointing the sinergy and the competitive level of the supply chain. The selected performance indicators reflect the high relevance of the costs dimension in the Brazilian energy companies performance, acting as a key performance indicator, is also indicates the limited performance management integration throughout the Brazilian wind energy supply chain
Resumo:
At present, the electricity generation through wind energy has an importance growing in the world, with the existence of very large plans for future wind power installation worldwide. Thus, the increasing the electricity generation through wind power requires, more and more, analysis of studies of interaction between wind parks and electric power systems. This paper has as purposes to implement equivalent models for synchronous wind generators to represent a wind park in ATP program and to check behavior of the models through simulations. Simulations with applications of faults were achieved to evaluate the behavior of voltages of system for each equivalent model, through comparisons between the results of models proposed, to verify if the differences obtained allows the adoption of the simplest model
Resumo:
In the last decade, the renewable energy sources have present a major propulsion in the world due to several factors: political, environmental, financial and others. Within this context, we have in particular the energy obtained through wind, wind energy - that has highlighted with rapid growth in recent years, including in Brazil, mostly in the Northeast, due to it s benefit-cost between the clean energies. In this context, we propose to compare the variable structure adaptive pole placement control (VS-APPC) with a traditional control technique proportional integral controller (PI), applied to set the control of machine side in a conversion system using a wind generator based on Double-Fed Induction Generator (DFIG). Robustness and performance tests were carried out to the uncertainties of the internal parameters of the machine and variations of speed reference.
Resumo:
This work purposes the application of a methodology to optimize the implantation cost of an wind-solar hybrid system for oil pumping. The developed model is estimated the implantation cost of system through Multiple Linear Regression technique, on the basis of the previous knowledge of variables: necessary capacity of storage, total daily energy demand, wind power, module power and module number. These variables are gotten by means of sizing. The considered model not only can be applied to the oil pumping, but also for any other purposes of electric energy generation for conversion of solar, wind or solar-wind energy, that demand short powers. Parametric statistical T-student tests had been used to detect the significant difference in the average of total cost to being considered the diameter of the wind, F by Snedecor in the variance analysis to test if the coefficients of the considered model are significantly different of zero and test not-parametric statistical by Friedman, toverify if there is difference in the system cost, by being considered the photovoltaic module powers. In decision of hypothesis tests was considered a 5%-significant level. The configurations module powers showed significant differences in total cost of investment by considering an electrical motor of 3 HP. The configurations module powers showed significant differences in total cost of investment by considering an electrical motor of 5 HP only to wind speed of 4m/s and 6 m/s in wind of 3 m, 4m and 5 m of diameter. There was not significant difference in costs to diameters of winds of 3 m and 4m. The mathematical model and the computational program may be used to others applications which require electrical between 2.250 W and 3.750 W. A computational program was developed to assist the study of several configurations that optimizes the implantation cost of an wind-solar system through considered mathematical model
Resumo:
After the Protocol of Kyoto and of the ECHO 92 - Rio de Janeiro, the attentions of the world focus to the preservation of the environment and of the maintainable use of the natural resources. People were looking for preserving environment for the future generations. Ever since, solutions are looked for the supply of energy in its more acquaintances forms and the substitution of the use of fossil fuels for the such alternative forms as: Photovoltaics, solar heat systems for water, wind , bio-diesel, etc. and in this context the Company of Engineering of the State of Bahia - Cerb changed a diesel pumping system by an wind one, It´s the first community system of this nature in Bahia. Facing problems with the model, a Cerb involved the academic segment of the Federal Center of Technological Education of Bahia Cefetba looking for a solution. This work intends to demonstrate the possibilities of optimization of the pumping communit system that supply water to approximately 50 people in the place of Romão, municipal district of São Gabriel-Ba. Technical reports were published in AGRENERGD2004-Unicamp SP and Scientific Magazine ETC,Cefetba, 2005. A simulation of the increase of energy is presented for heights of 15 and 20m, considering the eletromecanical balance from the pumping energy to the wind turbine. From the accomplished bibliographical revision, we emphasized the mechanical aspects of the engineering once in UFRN, those studies concentrate on the Department of Mechanical Engineering while, in others eletroelectronic are more emphasized. Finally, documents that we judged important were enclosed for the perfect understanding of this work
Resumo:
The purpose of this study was to investigate the social-environmental implications of the first large scale wind farm recently built in Brazil (2006), Parque Eólico de Rio do Fogo (PERF), to the nearby communities. The research was base on the adjustment of the DIS/BCN tool to analyze social impact and it was linked to the multi-method approach. Applying the autophotography strategy, cameras were given to five children from the district of Zumbi, the nearest location to PERF, and they were asked to individually photograph the six places they liked the most and the six places they liked the least in their community. Then, these children were interviewed individually and collectively about the photographs. Adult locals in Zumbi, residents of Zumbi/Rio do Fogo settlement, members of the State and Municipal government and representatives of the PERF were also interviewed with the aid of some of the pictures taken by the children and others that might trigger something to say, as a strategy called sample function. The five children presented positive image towards PERF; all of them chose to photograph it as one of places they liked. Adult population of Zumbi presented positive visual evaluation towards PERF. A small number of the interviewees were aware of the environmental and social benefits of wind energy production. Residents did not participate of the decision making process regarding PERF. They approved the project, especially because of the jobs provided during construction. Nowadays, PERF is something apart from their lives because it no longer provides jobs or any other interaction between the facility and the locals. Residents relate to the land, not with the facility. However, there is no evidence of rejection towards PERF, it is simply seen as something neutral to their lives. The low levels of education, traditional lack of social commitment and citizenship, and the experience accumulated by PERF´s planners and builders in other countries, may be contributing points to the fact that Zumbi residents did not oppose to PERF. It is clear that the country needs a legislation which seriously considers the psycho-social dimension involved in the implementation of wind farms
Resumo:
Objective-To compare the ability of a sidestream capnograph and a mainstream capnograph to measure end-tidal CO2 (ETCO2) and provide accurate estimates of Paco(2) in mechanically ventilated dogs.Design-Randomized, double Latin square.Animals-6 healthy adult dogs.Procedure-Anesthesia was induced and neuromuscular blockade achieved by IV administration of pancuronium bromide. Mechanical ventilation was used to induce conditions of standard ventilation, hyperventilation, and hypoventilation. While tidal volume was held constant, changes in minute volume ventilation and Paco(2) were made by changing the respiratory rate. Arterial blood gas analysis was performed and ETCO2 measurements were obtained by use of either a mainstream or a sidestream capnographic analyzer.Results-A linear regression model and bias analysis were used to compare Paco(2) and ETCO2 measurements; ETCO2 measurements obtained by both capnographs correlated well with Paco(2). Compared with Paco(2), mainstream ETCO2 values differed by 3.15 +/- 4.89 mm Hg (mean bias +/- SD), whereas the bias observed with the sidestream ETCO2 system was significantly higher (5.65 +/- 5.57 mm Hg). Regardless of the device used to measure ETCO2, bias increased as Paco(2) exceeded 60 mm Hg.Conclusions and Clinical Relevance-Although the mainstream capnograph was slightly more accurate, both methods of ETCO2 measurement correlated well with Paco(2) and reflected changes in the ventilatory status. However, ETCO2 values > 45 mm Hg may inaccurately reflect the severity of hypoventilation as Paco(2) may be underestimated during conditions of hypercapnia (Paco(2) > 60 mm Hg).
Resumo:
The human being has a fundamental role in issues concerning scarcity of energy resources as well as in the success of technologies which favor the use of renewable sources, such as wind energy. But what does wind energy mean for people? What are the psychological meanings concerning this term? Aiming to answer these questions, the general objective of this dissertation was to identify and to analyze the knowledge about wind energy taking into account a network of psychological meanings. One hundred and ninety one (191) university students from Natal-RN participated in the study, being male the majority (53%); aged between 17 and 51 years old (M=23.3 years; SD=5.7). Participants responded to self reports using the Natural Semantic Networks (NSW) technique, as well as to several sociodemographic questions. The results showed a consistent, positive and useful general semantic network. In this semantic network, knowledge about wind energy was represented by words that correspond to the appeal of (pro) environmental stance (e.g., clean and nature), that evinced both the technological aspect (e.g., force) and the economic aspect (e.g., economy). Results from different groups were also analyzed. The first set of groups (non-environemental and environmental) was divided considering the course (e.g., ecology and economy). The second set of groups(non-caretaker and caretaker) was divided based on the practice of environmental care expressed. Subtle differences were observed in the semantic networks of caretakers, who emphasized environment, an attribute not mentioned by non-caretakes. This indicates a construction of knowledge that is influenced by the presence or absence of the environmental commitment. Such findings may be useful in the construction of instruments for surveys and in the development of public and educational policies. Additionally, they may assist the media towards a more objective performance concerning wind energy
Resumo:
Trata-se de um estudo de caso de paciente portador de luxação de coluna cervical. Sem comprometimento medular, no qual as autoras operacionalizaram o processo de enfermagem, segundo Modelo Conceitual de Horta, adaptando a Taxonomia I dos Diagnósticos de Enfermagem proposta pela North American Nursing Diagnosis Association (NANDA). Os resultados demonstraram que as intervenções propostas ao caso contribuíram na sua reabilitação, prevenindo complicações, bem como ajudando-o a retomar ao seu ambiente social para reassumir a sua autonomia.
Resumo:
Objective To compare the effects of decompressive surgery (DSX), electroacupuncture (EAP), and DSX followed by EAP (DSX + EAP) for the treatment of thoracolumbar intervertebral disk disease (IVDD) in dogs with severe neurologic deficits of > 48 hours' duration.Design Retrospective case series and prospective clinical trial.Animals-40 dogs between 3 and 6 yEAPs old and weighing between 10 and 20 kg (22 and 44 lb) with long-standing (>48 hours) clinical signs of severe neurologic disease attributable to thoracolumbar IVDD.Procedures Thoracolumbar medullar injury was classified on the basis of neurologic signs by use of a scale ranging from 1 (least severe) to 5 (most severe). The DSX dogs (n = 10) were retrospectively selected from those that underwent DSX for the treatment of thoracolumbar IVDD. In addition, 19 dogs received EAP alone and 11 dogs underwent DSX followed by EAP (DSX + EAP). Outcome was considered a clinical success when a dog initially classified as grade 4 or 5 was classified as grade 1 or 2 within 6 months after the end of treatment.Results The proportion of dogs with clinical success was significantly higher for dogs that underwent EAP (15/19) than for dogs that underwent DSX (4/10); the proportion of dogs with clinical success for dogs that underwent DSX + EAP was intermediate (8/11).Conclusions and Clinical Relevance EAP was more effective than DSX for recovery of ambulation and improvement in neurologic deficits in dogs with long-standing severe deficits attributable to thoracolumbar IVDD. (J Am Vet Med Assoc 2010;236:1225-1229)
Resumo:
Fundação de Amparo à Pesquisa do Estado de São Paulo (FAPESP)