817 resultados para hydroelectric power plant


Relevância:

80.00% 80.00%

Publicador:

Resumo:

Ichthyofaunistic studies aims to broad the knowledge of composition, abundance and distribution of species in certain areas, and when possible, to infer patterns of distribution, as well as extrinsic factors that affect these patterns in space and time. The Paranapanema River suffers the impact of the construction of hydroelectric power plants in cascade system along its main channel, changing the characteristics of lotic to lentic and semi-lentic. These changes affect the entire biocenosis and the surroundings of the reservoir and, in particular, the fish fauna. In this context, the aim of this study was to characterize the fish assemblage in two lakes and stretches of the main channel, located near the outfall of the Paranapanema River, Jurumirim reservoir area, comparing them to their composition and structure, using ecological indices as tools. Fish were caught every three months from April 2011 to January 2013, using gill nets of various mesh openings in four stretches: Environment 1 - Calha Sete Ilhas, Environment 2 - Calha Poço da Pedra, Environment 3 - Lagoa Sete Ilhas and Environment 4 - Lagoa Poço de Pedra. After the capture, the specimens were identified and biometric analysis was performed (total and standard length weight). We captured 4,006 individuals belonging to four orders and 34 species, 31 native species and three non-native species. In abundance (n) and number of species (S), there was a predominance of Characiformes (57 %) followed by Siluriformes (31%). Overall, most of the species was constant concerning the frequency of capture. The five most representative species in abundance were Schizodon intermedius, Cyphocarax modestus, Pimelodus maculatus, Hoplosternum littorale and Serrasalmus maculatus, contributing with 60% of total individuals captured. Regarding the stretches, these species present diversity (H'), evenness (E), dominance (D) and richness (d) of similar species, since the abundance was higher in ...

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Pós-graduação em Geografia - FCT

Relevância:

80.00% 80.00%

Publicador:

Resumo:

In this research, made with riparians ousted by the construction of an hydroelectric power station, were gathered histories of the time when they were living in the edges of the river and of the current life in the town constructed in substitution to the ancient village flooded by the dam. In the histories, they proliferate images of a time of abundance, of fishing and of the fertile land that they were cultivating on the edge of the river. They describe the old village, with wealth of details, their achievements in the fishing and in the challenge of the mysteries of the forest and of the ferocity of the wild animals. They talk about the daily life of the ancient village like a community in which they were near and supportive. In the current narratives the protest and the revolt remain against the construction of the hydroelectric power station that took away the river and the rich riverside life, placing them at a place that they find sterile and devitalized.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Coordenação de Aperfeiçoamento de Pessoal de Nível Superior (CAPES)

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Pós-graduação em Engenharia Mecânica - FEG

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Pós-graduação em Agronegócio e Desenvolvimento - Tupã

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Pós-graduação em Engenharia Mecânica - FEG

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Pós-graduação em Engenharia de Produção - FEB

Relevância:

80.00% 80.00%

Publicador:

Resumo:

The availability of the electrical energy, in sufficient quantities and in competitive prices is a crucial factor to the economic development. The trade-in of the excess electrical energy produced in a system of cogeneration can be seen as an alternative to the creation of an additional source of revenues for ethanol power plants sector, besides contributing to the complementation of the Brazilian electrical headquarter with renewable sources. The objective of this study was to evaluate the economic feasibility of the implementation of a cogeneration electrical central using the excess of sugar cane bagasse and selling the excess of electrical energy with prices of the market. An ethanol power plant located in the state of Sao Paulo was used to this study. It was used the case study methodology, evaluating the potential of the investment under the viewpoint of the Net Present Value (NPV), Payback and Internal Rate of Return (IRR), and complementing the results of the Accounting Results (AC). It was created three alternative scenarios to reflect the level of the risk of every studied situation: the most likely, an optimistic and a pessimistic, each one with its assumptions. The Monte Carlo Simulations was used to insert the elements of risk to each scenario. The results showed that the project is feasible in all NPV scenarios. And the Payback and IRR analysis confirmed these evidences. The valuation with the AR showed that the project is most risky at the pessimistic scenario, but is feasibly in the most likely and the optimistic scenarios. It was concluded that the project is economic viable. However, the economic viability shown in the results is based on the maintenance of the future prices on the levels of the historical prices used in the analysis.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Fundação de Amparo à Pesquisa do Estado de São Paulo (FAPESP)

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Fundação de Amparo à Pesquisa do Estado de São Paulo (FAPESP)

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Coordenação de Aperfeiçoamento de Pessoal de Nível Superior (CAPES)

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Conselho Nacional de Desenvolvimento Científico e Tecnológico (CNPq)

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Pós-graduação em Agronomia - FEIS