968 resultados para consideration


Relevância:

10.00% 10.00%

Publicador:

Resumo:

Adhesively-bonded joints are extensively used in several fields of engineering. Cohesive Zone Models (CZM) have been used for the strength prediction of adhesive joints, as an add-in to Finite Element (FE) analyses that allows simulation of damage growth, by consideration of energetic principles. A useful feature of CZM is that different shapes can be developed for the cohesive laws, depending on the nature of the material or interface to be simulated, allowing an accurate strength prediction. This work studies the influence of the CZM shape (triangular, exponential or trapezoidal) used to model a thin adhesive layer in single-lap adhesive joints, for an estimation of its influence on the strength prediction under different material conditions. By performing this study, guidelines are provided on the possibility to use a CZM shape that may not be the most suited for a particular adhesive, but that may be more straightforward to use/implement and have less convergence problems (e.g. triangular shaped CZM), thus attaining the solution faster. The overall results showed that joints bonded with ductile adhesives are highly influenced by the CZM shape, and that the trapezoidal shape fits best the experimental data. Moreover, the smaller is the overlap length (LO), the greater is the influence of the CZM shape. On the other hand, the influence of the CZM shape can be neglected when using brittle adhesives, without compromising too much the accuracy of the strength predictions.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The overall goal of the REMPLI project is to design and implement a communication infrastructure for distributed data acquisition and remote control operations using the power grid as the communication medium. The primary target application is remote meter reading with high time resolution, where the meters can be energy, heat, gas, or water meters. The users of the system (e.g. utility companies) will benefit from the REMPLI system by gaining more detailed information about how energy is consumed by the end-users. In this context, the power-line communication (PLC) is deployed to cover the distance between utility company’s Private Network and the end user. This document specifies a protocol for real-time PLC, in the framework of the REMPLI project. It mainly comprises the Network Layer and Data Link Layer. The protocol was designed having into consideration the specific aspects of the network: different network typologies (star, tree, ring, multiple paths), dynamic changes in network topology (due to network maintenance, hazards, etc.), communication lines strongly affected by noise.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Dissertação apresentada à Escola Superior de Comunicação Social como parte dos requisitos para obtenção de grau de mestre em Audiovisual e Multimédia.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Dissertação apresentada à Escola Superior de Comunicação Social como parte dos requisitos para obtenção de grau de mestre em Audiovisual e Multimédia.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

It is generally challenging to determine end-to-end delays of applications for maximizing the aggregate system utility subject to timing constraints. Many practical approaches suggest the use of intermediate deadline of tasks in order to control and upper-bound their end-to-end delays. This paper proposes a unified framework for different time-sensitive, global optimization problems, and solves them in a distributed manner using Lagrangian duality. The framework uses global viewpoints to assign intermediate deadlines, taking resource contention among tasks into consideration. For soft real-time tasks, the proposed framework effectively addresses the deadline assignment problem while maximizing the aggregate quality of service. For hard real-time tasks, we show that existing heuristic solutions to the deadline assignment problem can be incorporated into the proposed framework, enriching their mathematical interpretation.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Coronary artery disease (CAD) is currently one of the most prevalent diseases in the world population and calcium deposits in coronary arteries are one direct risk factor. These can be assessed by the calcium score (CS) application, available via a computed tomography (CT) scan, which gives an accurate indication of the development of the disease. However, the ionising radiation applied to patients is high. This study aimed to optimise the protocol acquisition in order to reduce the radiation dose and explain the flow of procedures to quantify CAD. The main differences in the clinical results, when automated or semiautomated post-processing is used, will be shown, and the epidemiology, imaging, risk factors and prognosis of the disease described. The software steps and the values that allow the risk of developingCADto be predicted will be presented. A64-row multidetector CT scan with dual source and two phantoms (pig hearts) were used to demonstrate the advantages and disadvantages of the Agatston method. The tube energy was balanced. Two measurements were obtained in each of the three experimental protocols (64, 128, 256 mAs). Considerable changes appeared between the values of CS relating to the protocol variation. The predefined standard protocol provided the lowest dose of radiation (0.43 mGy). This study found that the variation in the radiation dose between protocols, taking into consideration the dose control systems attached to the CT equipment and image quality, was not sufficient to justify changing the default protocol provided by the manufacturer.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Nesta dissertação procurou-se comparar os desempenhos de três produtos de proteção da madeira quando expostos a várias condições de degradação. Tendo em consideração a grande quantidade de variáveis quando se faz este tipo de estudos, tentou-se controlar o maior número possível destas, de modo a permitir a comparação com outros estudos que venham a ser feitos futuramente. O objetivo a longo prazo é a contribuição desta dissertação para um conjunto de resultados cada vez mais abrangente, facilitando a escolha do utilizador, quando pretender proteger a madeira das agressões exteriores com este tipo de produtos. A principal conclusão nesta dissertação é que a agressividade do meio tem um papel determinante para os resultados obtidos, bem como as condições de inclinação e orientação da madeira. Situações de má selagem de topos ou não consideração da presença agentes biológicos são outros dois fatores que influenciam a durabilidade da construção. Finalmente, concluiu-se que não existem soluções únicas, tendo que se estudar caso a caso, quais as condições exatas de exposição, de forma a escolher o produto, ou produtos, mais adequados.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Trabalho Final de Mestrado elaborado no Laboratório Nacional de Engenharia Civil (LNEC) para a obtenção do grau de Mestre em Engenharia Civil pelo Instituto Superior de Engenharia de Lisboa no âmbito do protocolo de cooperação entre o ISEL e o LNEC

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Para obtenção do grau de Doutor pela Universidade de Vigo com menção internacional Departamento de Informática

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The use of multicores is becoming widespread inthe field of embedded systems, many of which have real-time requirements. Hence, ensuring that real-time applications meet their timing constraints is a pre-requisite before deploying them on these systems. This necessitates the consideration of the impact of the contention due to shared lowlevel hardware resources like the front-side bus (FSB) on the Worst-CaseExecution Time (WCET) of the tasks. Towards this aim, this paper proposes a method to determine an upper bound on the number of bus requests that tasks executing on a core can generate in a given time interval. We show that our method yields tighter upper bounds in comparison with the state of-the-art. We then apply our method to compute the extra contention delay incurred by tasks, when they are co-scheduled on different cores and access the shared main memory, using a shared bus, access to which is granted using a round-robin arbitration (RR) protocol.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

This paper proposes a stochastic mixed-integer linear approach to deal with a short-term unit commitment problem with uncertainty on a deregulated electricity market that includes day-ahead bidding and bilateral contracts. The proposed approach considers the typically operation constraints on the thermal units and a spinning reserve. The uncertainty is due to the electricity prices, which are modeled by a scenario set, allowing an acceptable computation. Moreover, emission allowances are considered in a manner to allow for the consideration of environmental constraints. A case study to illustrate the usefulness of the proposed approach is presented and an assessment of the cost for the spinning reserve is obtained by a comparison between the situation with and without spinning reserve.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

As it is well known, competitive electricity markets require new computing tools for generation companies to enhance the management of its resources. The economic value of the water stored in a power system reservoir is crucial information for enhancing the management of the reservoirs. This paper proposes a practical deterministic approach for computing the short-term economic value of the water stored in a power system reservoir, emphasizing the need to considerer water stored as a scarce resource with a short-term economic value. The paper addresses a problem concerning reservoirs with small storage capacities, i.e., the reservoirs considered as head-sensitivity. More precisely, the respective hydro plant is head-dependent and a pure linear approach is unable to capture such consideration. The paper presents a case study supported by the proposed practical deterministic approach and applied on a real multi-reservoir power system with three cascaded reservoirs, considering as input data forecasts for the electric energy price and for the natural inflow into the reservoirs over the schedule time horizon. The paper presents various water schedules due to different final stored water volume conditions on the reservoirs. Also, it presents the respective economic value of the water for the reservoirs at different stored water volume conditions.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Medical imaging is a powerful diagnostic tool. Consequently, the number of medical images taken has increased vastly over the past few decades. The most common medical imaging techniques use X-radiation as the primary investigative tool. The main limitation of using X-radiation is associated with the risk of developing cancers. Alongside this, technology has advanced and more centres now use CT scanners; these can incur significant radiation burdens compared with traditional X-ray imaging systems. The net effect is that the population radiation burden is rising steadily. Risk arising from X-radiation for diagnostic medical purposes needs minimising and one way to achieve this is through reducing radiation dose whilst optimising image quality. All ages are affected by risk from X-radiation however the increasing population age highlights the elderly as a new group that may require consideration. Of greatest concern are paediatric patients: firstly they are more sensitive to radiation; secondly their younger age means that the potential detriment to this group is greater. Containment of radiation exposure falls to a number of professionals within medical fields, from those who request imaging to those who produce the image. These staff are supported in their radiation protection role by engineers, physicists and technicians. It is important to realise that radiation protection is currently a major European focus of interest and minimum competence levels in radiation protection for radiographers have been defined through the integrated activities of the EU consortium called MEDRAPET. The outcomes of this project have been used by the European Federation of Radiographer Societies to describe the European Qualifications Framework levels for radiographers in radiation protection. Though variations exist between European countries radiographers and nuclear medicine technologists are normally the professional groups who are responsible for exposing screening populations and patients to X-radiation. As part of their training they learn fundamental principles of radiation protection and theoretical and practical approaches to dose minimisation. However dose minimisation is complex – it is not simply about reducing X-radiation without taking into account major contextual factors. These factors relate to the real world of clinical imaging and include the need to measure clinical image quality and lesion visibility when applying X-radiation dose reduction strategies. This requires the use of validated psychological and physics techniques to measure clinical image quality and lesion perceptibility.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The usage of COTS-based multicores is becoming widespread in the field of embedded systems. Providing realtime guarantees at design-time is a pre-requisite to deploy real-time systems on these multicores. This necessitates the consideration of the impact of the contention due to shared low-level hardware resources on the Worst-Case Execution Time (WCET) of the tasks. As a step towards this aim, this paper first identifies the different factors that make the WCET analysis a challenging problem in a typical COTS-based multicore system. Then, we propose and prove, a mathematically correct method to determine tight upper bounds on the WCET of the tasks, when they are co-scheduled on different cores.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Mestrado em Gestão e Empreendedorismo