950 resultados para Production chains and aggregation of value
Resumo:
This thesis is done to solve two issues for Sayid Paper Mill Ltd Pakistan. Section one deals with a practical problem arise in SPM that is cutting a given set of raw paper rolls of known length and width, and a set of product paper rolls of known length (equal to the length of raw paper rolls) and width, practical cutting constraints on a single cutting machine, according to demand orders for all customers. To solve this problem requires to determine an optimal cutting schedule to maximize the overall cutting process profitability while satisfying all demands and cutting constraints. The aim of this part of thesis is to develop a mathematical model which solves this problem.Second section deals with a problem of delivering final product from warehouse to different destinations by finding shortest paths. It is an operational routing problem to decide the daily routes for sending trucks to different destination to deliver their final product. This industrial problem is difficult and includes aspect such as delivery to a single destination and multiple destinations with limited resources. The aim of this part of thesis is to develop a process which helps finding shortest path.
Resumo:
The main idea of this research to solve the problem of inventory management for the paper industry SPM PVT limited. The aim of this research was to find a methodology by which the inventory of raw material could be kept at minimum level by means of buffer stock level.The main objective then lies in finding the minimum level of buffer stock according to daily consumption of raw material, finding the Economic Order Quantity (EOQ) reorders point and how much order will be placed in a year to control the shortage of raw material.In this project, we discuss continuous review model (Deterministic EOQ models) that includes the probabilistic demand directly in the formulation. According to the formula, we see the reorder point and the order up to model. The problem was tackled mathematically as well as simulation modeling was used where mathematically tractable solution was not possible.The simulation modeling was done by Awesim software for developing the simulation network. This simulation network has the ability to predict the buffer stock level based on variable consumption of raw material and lead-time. The data collection for this simulation network is taken from the industrial engineering personnel and the departmental studies of the concerned factory. At the end, we find the optimum level of order quantity, reorder point and order days.
Resumo:
A Scots pine (Pinus sylvestris) progeny trial was established in 1990, in the southwestern part of Sweden. The offspring was from 30 plus trees. The trial is located on abandoned agricultural land and has a single tree block design with a variation in spacing. The trial has been damaged by voles. At a tree age of ten years, growth, damages and branch properties were estimated. An analysis of variance on height, diameter and stem volume shows significant difference between spacing and progenies as well as interactions between these factors. As indicated by a better annual height increment and fewer and thinner branches at each whorl the densest spacing has the highest potential to produce quality logs.There were also differences between progenies in growth and quality traits. Some progenies combined good growth and branch characters with low mortality, straight stems and few damages. Other progenies had superior volume production.
Resumo:
en_US
Resumo:
This paper employs mechanism design to study the effects of imperfect legal enforcement on optimal scale of projects, borrowing interest rates and the probability of default. The analysis departs from an environment that combines asymmetric information about cash flows and limited commitment by borrowers. Incentive for repayment comes from the possibility of liquidation of projects by a court, but courts are costly and may fail to liquidate. The value of liquidated assets can be used as collateral: it is transferred to the lender when courts liquidate. Examples reveal that costly use of courts may be optimal, which contrasts with results from most limited commitment models, where punishments are just threats, never applied in optimal arrangements. I show that when voluntary liquidation is allowed, both asymmetric information and uncertainty about courts are necessary conditions for legal punishments ever to be applied. Numerical solutions for several parametric specifications are presented, allowing for heterogeneity on initial wealth and variability of project returns. In all such solutions, wealthier individuals borrow with lower interest rates and run higher scale enterprises, which is consistent with stylized facts. The reliability of courts has a consistently positive effect on the scale of projects. However its effect on interest rates is subtler and depends essentially on the degree of curvature of the production function. Numerical results also show that the possibility of collateral seizing allows comovements of the interest rates and the probability of repayment.
Resumo:
Conselho Nacional de Desenvolvimento Científico e Tecnológico (CNPq)
Resumo:
The objective of this research was to evaluate the growth of Tabebuia heptaphylla seedlings in distinct substrates with different amounts of urban waste compost and the relation between this growth and irrigation. A completely randomized experimental design was used, with a factorial arrangement of 15 substrates and 2 irrigation levels. The substrates were composed by the combination of different materials: urban waste, tanned cattle manure, vermiculite, soil and the commercial form Plantmax (R). For the study of the seedlings development, the following characteristics were evaluated: plant height, stem diameter at soil level, number of leaves, above ground dry matter, root system dry matter, relation between plant height and stem base diameter, Dickson quality index and relation between plant height and above ground dry matter. Evaluations of plant height, stem diameter at soil level and number of leaves were made at 75, 90, 105, 120, 135 and 150 days after sowing. According to the results, it was concluded that urban waste compost does not increase plant development. Significant differences in relation to the irrigation levels were found, with better results for the 150% irrigation level compared to 100% evapotranspiration.
Resumo:
Fundação de Amparo à Pesquisa do Estado de São Paulo (FAPESP)
Resumo:
One hundred sixty-two commercial 70-wk-old ISA Brown laying hens, previously subjected to induced molting by feed restriction, were distributed in a completely randomized design with 3 x 3 factorial arrangement (i.e., 3 metabolizable energy levels: 2,850; 2,950, and 3,050 kcal of ME/kg) and 3 protein levels (16, 18, and 20% CP), which totaled 9 treatments with 3 replicates of 6 birds each. Experimental diets were offered to birds after the feed restriction period. Performance and egg quality parameters were evaluated in 14-d intervals from the 4th to 12th weeks after forced molting for a total of 4 evaluation periods. Increases in dietary energy and protein levels did not improve performance or egg quality. The levels of 2,850 kcal of ME and 16% protein were sufficient for laying hens starting the second production cycle without decreasing their performance or egg quality.
Resumo:
Fundação de Amparo à Pesquisa do Estado de São Paulo (FAPESP)