The use of voids in the mineral aggregate (VMA) criteria for proper mix design of hot mix asphalt (HMA) mixtures is a time honored and fairly successful tool. Recent developments in the field of asphalt mix design have encouraged the use of mixtures with a coarse aggregate structure to resist the affect of heavy traffic loads. By using the equations presented, which account for both aggregate gradation and the volumetric properties of the materials, the mix designer is able to judge the proper VMA requirement for each unique blend of materials. By applying the new equations, the most economical mix may be selected without great risk of reduced durability. Supporting data from field application is presented to illustrate the use of the equations.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The Iowa Department of Transportation (IDOT) received a Strategic Highway Research Program (SHRP) gyratory compactor in December 1994. Since then IDOT has been studying the ability of the compactor to analyze fundamental properties of aggregates such as shape, texture, and gradation by studying the volumetrics of the aggregate blends under a standard load using the SHRP gyratory compactor. This method of analyzing the volumetrics of aggregate blends is similar to SHRP's fine aggregate angularity procedure, which analyzes void levels in noncompacted aggregate blends, which in turn can be used to evaluate the texture or shape of aggregates, what SHRP refers to as angularity. Research is showing that by splitting the aggregate blend on the 2.36-mm (#8) sieve and analyzing the volumetrics or angularity of the separated blend, important fundamental properties can be determined. Most important is structure (the degree and location of aggregate interlock). In addition, analysis of the volumes of the coarse and fine portions can predict the voids in the mineral aggregate and the desired asphalt content. By predicting these properties, it can be determined whether the combined aggregate blend, when mixed with asphalt cement, will produce a mix with structural adequacy to carry the designed traffic load.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Quality management concrete allows the contractor to develop the mix design for the portland cement concrete. This research was initiated to gain knowledge about contractor mix designs. An experiment was done to determine the variation in cylinders, beams, and cores that could be used to test the strength of the contractor's mix. In addition, the contractor's cylinder strengths and gradations were analyzed for statistical stability and process capability. This research supports the following conclusions: (1) The mold type used to cast the concrete cylinders had an effect on the compressive strength of the concrete. The 4.5-in. by 9-in. (11.43-cm by 22.86-cm) cylinders had lower strength at a 95% confidence interval than the 4-in. by 8-in. (10.16-cm by 20.32-cm) and 6-in. by 12-in. (15.24-cm by 30.48-cm) cylinders. (2) The low vibration consolidation effort had the lowest strength of the three consolidation efforts. In particular, an interaction occurred between the low vibration effort and the 4.5-in. by 9-in. (11.43-cm by 22.86-cm) mold. This interaction produced very low compressive strengths when compared with the other consolidation efforts. (3) A correlation of 0.64 R-squared was found between the 28 day cylinder and 28 day compressive strengths. (4) The compressive strength results of the process control testing were not in statistical control. The aggregate gradations were mostly in statistical control. The gradation process was capable of meeting specification requirements. However, many of the sieves were off target. (5) The fineness modulus of the aggregate gradations did not correlate well with the strength of the concrete. However, this is not surprising considering that the gradation tests and the strength tests did not represent the same material. In addition, the concrete still has many other variables that will affect its strength that were not controlled.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The Iowa State Highway Commission purchased a Conrad automatic freeze and thaw machine and placed it in operation during October 1961. There were a few problems, but considering, the many electrical and mechanical devices used in the automatic system it has always functioned quite well. Rapid freezing and thawing of 4"x4"xl8" concrete beams has been conducted primarily in accordance with ASTM C-29l (now ASTM C-666 procedure B) at the rate of one beam per day. Over 4000 beams have been tested since 1961, with determination of the resulting durability factors. Various methods of curing were used and a standard 90 day moist cure was selected. This cure seemed to yield durability factors that correlated very well with ratings of coarse aggregates based on service records. Some concrete beams had been made using the same coarse aggregate and the durability factors compared relatively well with previous tests. Durability factors seemed to yield reasonable results until large variations in durability factors were noted from beams of identical concrete mix proportions in research projects R-234 and R-247. This then presents the question "How reliable is the durability as determined by ASTM C-666?" This question became increasingly more important when a specification requiring a minimum durability factor for P.C. concrete made from coarse aggregates was incorporated into the 1972 Standard Specification for coarse aggregates for concrete.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Fast Track concrete has proven to be successful in obtaining high early strengths. This benefit does not come without cost. Special Type III cement and insulating blankets to accelerate the cure add to its expense when compared to conventional paving. This research was intended to determine the benefit derived from the use of insulating blankets to accelerate strength gain in three concrete mixes using Type I cement. The goal was to determine mixes and curing procedures that would result in a range of opening times. This determination would allow the most economical design for a particular project by tailoring it to a specific time restraint. Three mixes of various cement content were tested in the field. Flexural beams were cast for each mix and tested at various ages. Two test sections were placed for each mix, one section being cured with the addition of insulating blankets and the other being cured with only conventional curing compound. Iowa Department of Transportation specifications require 500 psi flexural strength before a pavement can be opened to traffic. Concrete with Fast Track proportions (nominal 7 1/2 bag), Type I cement, and insulating blankets reached that strength in approximately 36 hr, a standard mix (nominal 6 1/2 bag) using the blankets in approximately 48 hr, and the Fast Track proportions with Type I cement without blankets in about 60 hr. The results showed a significant improvement in early strength gain with the use of insulating blankets.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Discarded tires present major disposal and environmental problems. One method of recycling tires is to use finely ground rubber from tires in asphalt cement concrete (ACC). This process has been researched in Iowa since 1991. There are currently eight projects being researched. This project involved using crumb rubber modifier (CRM) in ACC using a dry process. This project is located on US 63 in Howard County. It involved 17 test sections. There were five test sections using 20 lb of CRM per ton, four test sections using 10 lb of CRM per ton and eight test sections using a conventional mix. Not only were different mixes used, but the overlay was also placed in various thicknesses ranging from 2 in. to 8 in. (5 cm to 20 cm). The project was completed in August 1994. The project construction went well with only minor problems. This report contains information about procedures and tests that were completed and those that will be completed. Evaluation on the project will continue for five years.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

During 1986, the City of Des Moines placed an experimental asphaltic concrete overlay containing an ice-retardant additive (Verglimit) on Euclid Avenue (U.S. Highway 6). Verglimit is a chemical multi-component deicer which is added to the surface course of an asphalt overlay. The additive was uniformly distributed through the mix at the asphalt plant, which allows exposure of the particles as the finished surface wears under traffic. During a snowfall, the exposed particles attract and absorb moisture creating a deicing solution which dampens the pavement. The Verglimit additive used on this project cost $1,180 per metric ton. The Verglimit was added at a rate of 6.3% by weight, which was 126 pounds per ton, or $66.38 per ton of hot mix asphalt. The purchase of Verglimit additive was funded by the Iowa Department of Transportation through a research project recommended by the Highway Research Advisory Board. The pavement surface experienced severe wetting due to the additive's affinity for water immediately after the project was completed and during periods of high humidity. This wetting created slippery conditions both on the project itself and where vehicles tracked the additive. The only way to remove the slipperiness was by flushing the street with water. The ice-retardant overlay appears to perform as expected in reducing the adherence of ice and snow, especially at temperatures just below freezing. It performs better in light snowfalls than in heavy ones. The ice retardant overlay is effective in eliminating thin coatings of ice due to freezing drizzle or widespread frost. The accident data showed a reduction in the number of snow and ice related accidents but due to the low number of this type of accident the results are inconclusive.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

This is Part 3 of a study of creep and resilient modulus testing of hot mix asphalt concrete. The creep and resilient modulus testing in Part 1 showed the improved load carrying characteristics of crushed particles. Cores from pavements drilled in Part 2 exhibited a poor correlation with rutting and creep/resilient modulus on pavement with a range of rut depths. The objective of Part 3 was to determine the relationship of creep and resilient modulus for 1) Marshall specimens from laboratory mixing for mix design; 2) Marshall specimens from construction plant mixing; and 3) cores drilled from the hot mixed asphalt pavement. The creep and resilient modulus data from these three sources exhibited substantial variations. No meaningful correlations of the results from these three sources were obtained.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

One of the most serious impediments to the continued successful use of hot-mix asphalt (HMA) pavements is rutting. The Iowa Department of Transportation has required 85% crushed particles and 75-blow Marshall mix design in an effort to prevent rutting on Interstate roadways. Relationships between the percent of crushed particles and resistance to rutting in pavement through the use of various laboratory test procedures must be developed. HMA mixtures were made with 0, 30, 60, 85, and 100% crushed gravel, crushed limestone, and crushed quartzite combined with uncrushed sand and gravel. These aggregate combinations were used with 4, 5, and 6% asphalt cement (ac). Laboratory tests included Marshall stability, resilient modulus, indirect tensile, and creep. A creep resistance factor (CRF) was developed to provide a single numeric value for creep test results. The CRF values relate well to the amount of crushed particles and the perceived resistance to rutting. The indirect tensile test is highly dependent on the ac with a small effect from the percent of crushed particles. The Marshall stability from 75-blow compaction relates well to the percent of crushed particles. The resilient modulus in some cases is highly affected by grade of ac.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The amount of asphalt cement in asphaltic concrete has a definite effect on its durability under adverse conditions. The expansion of the transportation system to more and heavier loads has also made the percentage of asphalt cement in a mix more critical. The laboratory mixer does not duplicate the mixing effect of the large pugmills; therefore, it is impossible to be completely sure of the asphalt cement needed for each mix. This percentage quite often must be varied in the field. With a central testing laboratory and the high production of mixing plants today, a large amount of asphaltic concrete is produced before a sample can be tested to determine if the asphalt content is correct. If the asphalt content lowers the durability or stability of a mix, more maintenance will be required in the future. The purpose of this project is to determine the value of a mobile laboratory in the field, the feasibility of providing adequate, early testing in the field, and correlation with the central laboratory. The major purpose was to determine as soon as possible the best percentage of asphalt.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The Iowa Department of Transportation is evaluating the use of ground recycled crumb rubber from discarded tires in asphalt rubber cement. There were four projects completed during 1991 and another one constructed in 1992. This project is located on IA 140 north of Kingsley in Plymouth County. The project contains one section with reacted asphalt rubber cement (ARC) used in both binder and surface courses, one with reacted ARC used in the surface course and a conventional binder course, and a conventional mix control section. The reacted rubber binder course was placed on October 17, 1991 and the reacted rubber surface course was placed on October 17, 18, and 19. Inclement weather caused a slight delay in placing or constructing the surface. There was a minor problem with shoving and cracking of the binder course. The construction went well otherwise. Information included in this report consists of test results, construction reports, and cost comparisons.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

In 1986, a 0.34 mile experimental section of polymerized asphalt cement (PAC30) concrete was placed in the westbound driving lane of Interstate 80 in western Iowa. It was used in a 2" asphalt concrete inlay using 20% recycled asphalt pavement. The virgin aggregate included 41% crushed gravel, 25% crushed quartzite and 14% natural sand. The evaluation of the project was severely limited when a 1987 reconstruction project extended into the experimental section leaving only 395 feet. Rut depths under a 4-foot gage were taken for a period of two years. No significant rutting occurred in the experimental polymerized section. The frequency of transverse cracking in the polymerized AC section was the same as that of the comparative AC-20 section. The asphalt paving mixture made with polymerized AC cost 120% of the cost of the conventional mix.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Disposal of used tires has been a problem throughout the United States. The 1991 Intermodal Surface Transportation Efficiency Act (ISTEA) requires the use of recycled rubber in asphalt concrete starting in FY94. A moratorium has delayed this requirement until FY95. The Iowa DOT has researched six projects using crumb rubber modifier in asphalt concrete using the wet process. This process involves using a blender-reactor to blend the asphalt cement and crumb rubber. Using the wet process the asphalt cement has to reach a hotter temperature, than is normally required, for reaction to occur. The wet process is also much more expensive than conventional asphalt. This research deals with using a dry process to incorporate crumb rubber into the asphalt concrete mix. The project was constructed by Western Engineering of Harlan, Iowa, on IA 37 between Earling, Iowa and US 59. It was completed in September 1993. Western Engineering used a double drum mixer to produce the crumb rubber modified asphalt concrete by the dry process. The production and construction went well with minor difficulty and the dry process is a less expensive procedure for producing crumb rubber modified asphalt concrete.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The Standard Specifications for this project included requirements for placing two 500 foot test sections of Type B asphaltic concrete with 1-1/2 per cent asbestos fibres (mix size 3/8 inch, lift thickness 3/4 inch) as part of the regular construction of the surface course. These requirements were designed to provide asbestos modified mixtures for laboratory analysis and road performance evaluation. This report provides the preliminary results and analysis of test data obtained from tests on the mixtures placed on the roadway. Previous research by G. S. Zuelke (1) and J. H. Kestzman et al (2) indicated that asphaltic concrete mixtures modified with asbestos fibres improved stability, decreased permeability, and allowed the use of higher bitumen contents. This study indicated that the addition of asbestos fibres would permit the use of higher bitumen contents, theoretically improving durability, without adverse results. An indication was also obtained to the effect that asbestos mixtures were more difficult to compact in the field.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

A research project involving 2, 3, 4, and 5 in. (5.1, 7.6, 10.2, and 12.7 cm) of bonded portland cement concrete (PCC) overlay on a 1.3 mile (2.1 km) PCC pavement was conducted in Clayton County, Iowa, during September 1977, centering on the following objectives: (1) Determine the mixing and proportioning procedures required in using a conventional, central mix proportioning plant to produce a dense PCC mixture using standard mixes with super water reducing admixtures; (2) Determine the economics, longevity and maintenance performance of a bonded, thin-lift, non-reinforced PCC resurfacing course using conventional procedures, equipment and concrete paving mixtures both with and without super water reducing admixtures; and (3) Determine if an adequate bond between the existing pavement and an overlay of thin-lift, dense, non-reinforced PCC can be obtained with only special surface cleaning and no surface removal or grinding. The conclusions are as follows: (1) Normal mixing equipment and proportioning procedures could be used using a conventional central-mix proportioning plant. This was successful when used with super water reducing admixtures. Only minor changes need be made in procedures and timing. (2) The time has been too short since the completion of the project to determine how the new pavement will perform, however, initially it appears that the method is economical and no reason is seen at this time why the life of the pavement should not be comparable to an all new pavement. (3) The initial test results show that bond strength, regardless of which method of cleaning is used, scarifying, sand blasting or water blasting, far exceed what is considered the minimum bond strength of 200 psi (1379 kPa) except where the paint stripes were intentionally left, thus showing that the paint must be removed. (4) It appears that either cement and water grout or sand, cement and water grout may be used and still obtain the required bond.