969 resultados para Italian literature (Collection)
Resumo:
Literature addressing methodological issues in organisational research is extensive and multidisciplinary, encompassing debates about methodological choices, data-collection techniques, epistemological approaches and statistical procedures. However, little scholarship has tackled an important aspect of organisational research that precedes decisions about data collection and analysis – access to the organisations themselves, including the people, processes and documents within them. This chapter looks at organisational access through the experiences of three research fellows in the course of their work with their respective industry partners. In doing so, it reveals many of the challenges and changing opportunities associated with access to organisations, which are rarely explicitly addressed, but often assumed, in traditional methods texts and journal publications. Although the level of access granted varied somewhat across the projects at different points in time and according to different organisational contexts, we shared a number of core and consistent experiences in attempting to collect data and implement strategies.
Resumo:
This is the first interim report on the Cost of Tendering component of the Best Value project. This report provides some insight from ‘cost of tendering’ literature and discussions with CRC partners. With the completion of this scoping project, sufficient understanding will be developed to determine the need for more detailed research. This scoping project does not intend to provide guidance for the way to change the tendering process, although a need will be demonstrated for control and reduction of cost of tendering.
Resumo:
This first interim report on ‘best value’ reviewed the academic literature relating to ‘best value’ and illustrated the varying interpretations that the concept of ‘best value’ has attracted. It also examined current state of the literature on best value in construction project procurement. ‘Best value’ was explored from the perspective of both the business enterprise and public sector. It was concluded that ‘best value’ in the public sector is considerably more complex. This second interim report explores how ‘best value’ has been implemented in the UK. Focus is directed towards the UK, particularly Scotland’s approach to examine the complexity of implementation of ‘best value’ in the public sector context. Scotland has been recognised as a leader in the field of ‘best value’ in the public sector (Curry, 1999; Wisniewski and Stewart, 2001, 2004; Jaconelli and Sheffield, 2000)
Resumo:
The supply chain in the construction industry is less well developed than in manufacturing. This project proposes to bring world class international business profile benchmarking to assist in the development of small and medium sized (SME) subcontractors. This approach has been widely used in Europe and has enabled significant sectoral supply chain development. The construction SME supply chain is a critical component in the delivery of all construction projects. Furthermore, it undermines the sustainability of the individual enterprise and puts construction projects and jobs at risk. Government procurement agencies view this as construction industry capacity building. In the developed and developing worlds, SME sector firms routinely make up over 95% of companies. The construction industry supply chain is dominated by such firms. Supply chain development and capacity building have been largely neglected in the construction sector, despite rhetoric about the importance of the SME sector to the economy This project seeks to investigate the potential to apply the International Business Profile Benchmarking instrument with the construction industry. The project recognises that there are many facets to the quest for continuous improvement in the construction industry and in wider workplace in general. This first interim report reviews the international literature relating to construction industry performance measurement and performance improvement. A summary of the findings follow. ‘Best value’ is dealt with in a separate interim report.
Resumo:
This is the final report of research project 2002-057-C: Enabling Team Collaboration with Pervasive and Mobile Computing. The research project was carried out by the Australian Cooperative Research Centre for Construction Innovation and has two streams that consider the use of pervasive computing technologies in two different contexts. The first context was the on-site deployment of mobile computing devices, where as the second context was the use and development of intelligent rooms based on sensed environments and new human-computer interfaces (HCI) for collaboration in the design office. The two streams present a model of team collaboration that relies on continues communication to people and information to reduce information leakage. This report consists of five sections: (1) Introduction; (2) Research Project Background; (3) Project Implementation; (4) Case Studies and Outcomes; and (5) Conclusion and Recommendation. Introduction in Section 1 presents a brief description of the research project including general research objectives and structure. Section 2 introduces the background of the research and detailed information regarding project participants, objectives and significance, and also research methodology. Review of all research activities such as literature review and case studies are summarised in Project Implementation in Section 3. Following this, in Section 4 the report then focuses on analysing the case studies and presents their outcomes. Conclusion and recommendation of the research project are summarised in Section 5. Other information to support the content of the report such as research project schedule is provided in Appendices. The purpose of the final project report is to provide industry partners with detailed information on the project activities and methodology such as the implementation of pervasive computing technologies in the real contexts. The report summarises the outcomes of the case studies and provides necessary recommendation to industry partners of using new technologies to support better project collaboration.
Resumo:
In recent years considerable effort has gone into quantifying the reuse and recycling potential of waste generated by residential construction. Unfortunately less information is available for the commercial refurbishment sector. It is hypothesised that significant economic and environmental benefit can be derived from closer monitoring of the commercial construction waste stream. With the aim of assessing these benefits, the authors are involved in ongoing case studies to record both current standard practice and the most effective means of improving the eco-efficiency of materials use in office building refurbishments. This paper focuses on the issues involved in developing methods for obtaining the necessary information on better waste management practices and establishing benchmark indicators. The need to create databases to establish benchmarks of waste minimisation best practice in commercial construction is stressed. Further research will monitor the delivery of case study projects and the levels of reuse and recycling achieved in directly quantifiable ways
Resumo:
Technology is continually changing, and evolving, throughout the entire construction industry; and particularly in the design process. One of the principal manifestations of this is a move away from team working in a shared work space to team working in a virtual space, using increasingly sophisticated electronic media. Due to the significant operating differences when working in shared and virtual spaces adjustments to generic skills utilised by members is a necessity when moving between the two conditions. This paper reports an aspect of a CRC-CI research project based on research of ‘generic skills’ used by individuals and teams when engaging with high bandwidth information and communication technologies (ICT). It aligns with the project’s other two aspects of collaboration in virtual environments: ‘processes’ and ‘models’. The entire project focuses on the early stages of a project (i.e. design) in which models for the project are being developed and revised. The paper summarises the first stage of the research project which reviews literature to identify factors of virtual teaming which may affect team member skills. It concludes that design team participants require ‘appropriate skills’ to function efficiently and effectively, and that the introduction of high band-width technologies reinforces the need for skills mapping and measurement.
Resumo:
Capital works procurement and its regulatory policy environment within a country can be complex entities. For example, by virtue of Australia’s governmental division between the Commonwealth, states and local jurisdictions and the associated procurement networks and responsibilities at each level, the tendering process is often convoluted. There are four inter-related key themes identified in the literature in relation to procurement disharmony, including decentralisation, risk & risk mitigation, free trade & competition, and tendering costs. This paper defines and discusses these key areas of conflict that adversely impact upon the business environments of industry through a literature review, policy analysis and consultation with capital works procurement stakeholders. The aim of this national study is to identify policy differences between jurisdictions in Australia, and ascertain whether those differences are a barrier to productivity and innovation. This research forms an element of a broader investigation with an aim of developing efficient, effective and nationally harmonised procurement systems. Keywords: capital works, procurement policy reform Acknowledgement: The research described in this paper carried out by the Australian Cooperative Research Centre for Construction Innovation.
Resumo:
The early stages of the building design process are when the most far reaching decisions are made regarding the configuration of the proposed project. This paper examines methods of providing decision support to building designers across multiple disciplines during the early stage of design. The level of detail supported is at the massing study stage where the basic envelope of the project is being defined. The block outlines on the building envelope are sliced into floors. Within a floor the only spatial divisions supported are the “user” space and the building core. The building core includes vertical transportation systems, emergency egress and vertical duct runs. The current focus of the project described in the paper is multi-storey mixed use office/residential buildings with car parking. This is a common type of building in redevelopment projects within and adjacent to the central business districts of major Australian cities. The key design parameters for system selection across the major systems in multi-storey building projects - architectural, structural, HVAC, vertical transportation, electrical distribution, fire protection, hydraulics and cost – are examined. These have been identified through literature research and discussions with building designers from various disciplines. This information is being encoded in decision support tools. The decision support tools communicate through a shared database to ensure that the relevant information is shared across all of the disciplines. An internal data model has been developed to support the very early design phase and the high level system descriptions required. A mapping to IFC 2x2 has also been defined to ensure that this early information is available at later stages of the design process.
Resumo:
Community awareness and the perception on the traffic noise related health impacts have increased significantly over the last decade resulting in a large volume of public inquiries flowing to Road Authorities for planning advice. Traffic noise management in the urban environment is therefore becoming a “social obligation”, essentially due to noise related health concerns. Although various aspects of urban noise pollution and mitigation have been researched independently, an integrated approach by stakeholders has not been attempted. Although the current treatment and mitigation strategies are predominantly handled by the Road Agencies, a concerted effort by all stakeholders is becoming mandatory for effective and tangible outcomes in the future. A research project is underway a RMIT University, Australia, led by the second author to consider the use of “hedonic pricing” for alternative noise amelioration treatments within the road reserve and outside the road reserve. The project aims to foster a full range noise abatement strategy encompassing source, path and noise receiver. The benefit of such a study would be to mitigate the problem where it is most effective and would defuse traditional “authority” boundaries to produce the optimum outcome. The project is conducted in collaboration with the Department of Main Roads Queensland, Australia and funded by the CRC for Construction Innovation. As part of this study, a comprehensive literature search is currently underway to investigate the advancements in community health research, related to environmental noise pollution, and the advancements in technical and engineering research in mitigating the issue. This paper presents the outcomes of this work outlining state of the art, national and international good practices and gap analysis to identify major anomalies and developments.
Resumo:
This was a two-stage project to inform the Australian property and construction industry generally, and to provide the Australian Building Codes Board (ABCB) with information to allow it to determine whether or not sustainability requirements are necessary in the Future Building Code of Australia (BCA21). Research objectives included: examine overseas sustainability requirements for buildings and outline the reason why it is controlled and regulated in the particular country, state, principality etc. examine studies focusing on sustainability developments in buildings in Australia and overseas identify potential issues and implications associated with sustainable building requirements provide advice on whether provisions are necessary in the BCA21 to make buildings sustainable if the study determines there is a need for sustainability requirements in the BCA21, the study was to demonstrate the need to control and regulate along with the method to control and regulate. This research was broken down into two stages. Stage 1 was a literature review of international requirements as well as current thinking and practice for sustainable building developments. Stage 2 identified issues and implications of sustainability requirements for buildings and advice on whether provisions are necessary in the BCA21. This stage included workshops in all capital cities and involved key stakeholders, such as regulators, local government and representatives from key associations. This final report brings together the work of both stages, along with a searchable internet database of references and a series of nine key recommendations.
Resumo:
Transit agencies across the world are increasingly shifting their fare collection mechanisms towards fully automated systems like the smart card. One of the objectives in implementing such a system is to reduce the boarding time per passenger and hence reduce the overall dwell time for the buses at the bus stops/bus rapid transit (BRT) stations. TransLink, the transit authority responsible for public transport management in South East Queensland, has introduced ‘GoCard’ technology using the Cubic platform for fare collection on its public transport system. In addition to this, three inner city BRT stations on South East Busway spine are operating as pre-paid platforms during evening peak time. This paper evaluates the effects of these multiple policy measures on operation of study busway station. The comparison between pre and post policy scenarios suggests that though boarding time per passenger has decreased, while the alighting time per passenger has increased slightly. However, there is a substantial reduction in operating efficiency was observed at the station.