909 resultados para Gas power plants.


Relevância:

80.00% 80.00%

Publicador:

Resumo:

Tese de mestrado integrado em Engenharia da Energia e do Ambiente, apresentada à Universidade de Lisboa, através da Faculdade de Ciências, 2016

Relevância:

80.00% 80.00%

Publicador:

Resumo:

On 11 October, the top executives of ten European energy companies, which jointly own about half of the European Union’s electricity generating capacity, warned that “energy security is no longer guaranteed” and once again called for changes to EU energy policy. Due to persistent adverse conditions in the energy market (linked to, for example, the exceptionally low wholesale energy prices) more and more conventional power plants are being closed down. According to sector representatives, this could lead to energy shortages being seen as early as this winter. Meanwhile, in an interview with The Daily Telegraph published in September of this year, the European industry commissioner Antonio Tajani warned – in a rather alarmist tone – of the disastrous consequences the rising energy prices could have on European industry. Amongst the reasons for the high prices of energy, Tajani mentioned the overambitious pace and methods used to increase the share of renewables in the sector. In a similar vein, EU President Herman Van Rompuy has highlighted the need to reduce energy costs as a top priority for EU energy policy1. The price of energy has become one of the central issues in the current EU energy debate. The high consumer price of energy – which has been rising steadily over the past several years – poses a serious challenge to both household and industrial users. Meanwhile, the declining wholesale prices are affecting the cost-effectiveness of energy production and the profits of energy companies. The current difficulties, however, are first and foremost a symptom of much wider problems related to the functioning of both the EU energy market as well as to the EU’s climate and energy policies.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Initiated in May 2011, several months after the Fukushima nuclear disaster, Germany’s energy transformation (Energiewende) has been presented as an irrevocable plan, and – due to the speed of change required – it represents a new quality in Germany’s energy strategy. Its main objectives include: nuclear energy being phased out by 2022, the development of renewable energy sources (OZE), the expansion of transmission networks, the construction of new conventional power plants and an improvement in energy efficiency.The cornerstone of the strategy is the development of renewable energy. Under Germany's amended renewable energy law, the proportion of renewable energy in electricity generation is supposed to increase steadily from the current level of around 20% to approximately 38% in 2020. In 2030, renewable energy is expected to account for 50% of electricity generation. This is expected to increase to 65% in 2040 and to as much as 80% in 2050. The impact of the Energiewende is not limited to the sphere of energy supplies. In the medium and long term, it will change not only to the way the German economy operates, but also the functioning of German society and the state. Facing difficulties with the expansion of transmission networks, the excessive cost of building wind farms, and problems with the stability of electricity supplies, especially during particularly cold winters, the federal government has so far tended to centralise power and limit the independence of the German federal states with regard to their respective energy policies, justifying this with the need for greater co-ordination. The Energiewende may also become the beginning of a "third industrial revolution", i.e. a transition to a green economy and a society based on sustainable development. This will require a new "social contract" that will redefine the relations between the state, society and the economy. Negotiating such a contract will be one of the greatest challenges for German policy in the coming years.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

One year after the events of Fukushima the implementation of the new German energy strategy adopted in the summer of 2011 is being verified. Business circles, experts and publicists are sounding the alarm. The tempo at which the German economy is being rearranged in order that it uses renewable energy sources is so that it has turned out to be an extremely difficult and expensive task. The implementation of the key guidelines of the new strategy, such as the development of the transmission networks and the construction of new conventional power plants, is meeting increasing resistance in the form of economic and legal difficulties. The development of the green technologies sector is also posing problems. The solar energy industry, for example, is excessively subsidised, whereas the subsidies for the construction of maritime wind farms are too low. At present, only those guidelines of the strategy which are evaluated as economically feasible by investors or which receive adequate financial support from the state have a chance of being carried through. The strategy may also turn out to be unsuccessful due to the lack of a comprehensive coordination of its implementation and the financial burden its introduction entails for both the public and the economy. In the immediate future, the German government will make efforts not only to revise its internal regulations in order to enable the realisation of the energy transformation; it is also likely to undertake a number of measures at the EU forum which will facilitate this realisation. One should expect that the German government will actively support the financing of both the development of the energy networks in EU member states and the development of renewable energy sources in the energy sector.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Summary. On 11 March 2011, a devastating earthquake struck Japan and caused a major nuclear accident at the Fukushima Daiichi nuclear plant. The disaster confirmed that nuclear reactors must be protected even against accidents that have been assessed as highly unlikely. It also revealed a well-known catalogue of problems: faulty design, insufficient back-up systems, human error, inadequate contingency plans, and poor communications. The catastrophe triggered the rapid launch of a major re-examination of nuclear reactor security in Europe. It also stopped in its tracks what had appeared to be a ‘nuclear renaissance’, both in Europe and globally, especially in the emerging countries. Under the accumulated pressure of rising demand and climate warming, many new nuclear projects had been proposed. Since 2011 there has been more ambivalence, especially in Europe. Some Member States have even decided to abandon the nuclear sector altogether. This Egmont Paper aims to examine the reactions of the EU regarding nuclear safety since 2011. Firstly, a general description of the nuclear sector in Europe is provided. The nuclear production of electricity currently employs around 500,000 people, including those working in the supply chain. It generates approximately €70 billion per year. It provides roughly 30% of the electricity consumed in the EU. At the end of 2013, there were 131 nuclear power reactors active in the EU, located in 14 countries. Four new reactors are under construction in France, Slovakia and Finland. Secondly, this paper will present the Euratom legal framework regarding nuclear safety. The European Atomic Energy Community (EAEC or Euratom) Treaty was signed in 1957, and somewhat obscured by the European Economic Community (EEC) Treaty. It was a more classical treaty, establishing institutions with limited powers. Its development remained relatively modest until the Chernobyl catastrophe, which provoked many initiatives. The most important was the final adoption of the Nuclear Safety Directive 2009/71. Thirdly, the general symbiosis between Euratom and the International Atomic Energy Agency (IAEA) will be explained. Fourthly, the paper analyses the initiatives taken by the EU in the wake of the Fukushima catastrophe. These initiatives are centred around the famous ‘stress tests’. Fifthly, the most important legal change brought about by this event was the revision of Directive 2009/71. Directive 2014/87 has been adopted quite rapidly, and has deepened in various ways the role of the EU in nuclear safety. It has reinforced the role and effective independence of the national regulatory authorities. It has enhanced transparency on nuclear safety matters. It has strengthened principles, and introduced new general nuclear safety objectives and requirements, addressing specific technical issues across the entire life cycle of nuclear installations, and in particular, nuclear power plants. It has extended monitoring and the exchange of experiences by establishing a European system of peer reviews. Finally, it has established a mechanism for developing EU-wide harmonized nuclear safety guidelines. In spite of these various improvements, Directive 2014/87 Euratom still reflects the ambiguity of the Euratom system in general, and especially in the field of nuclear safety. The use of nuclear energy remains controversial among Member States. Some of them remain adamantly in favour, others against or ambivalent. The intervention of the EAEC institutions remains sensitive. The use of the traditional Community method remains limited. The peer review method remains a very peculiar mechanism that deserves more attention.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

To shift to a low-carbon economy, the EU has been encouraging the deployment of variable renewable energy sources (VRE). However, VRE lack of competitiveness and their technical specificities have substantially raised the cost of the transition. Economic evaluations show that VRE life-cycle costs of electricity generation are still today higher than those of conventional thermal power plants. Member States have consequently adopted dedicated policies to support them. In addition, Ueckerdt et al. (2013) show that when integrated to the power system, VRE induce supplementary not-accounted-for costs. This paper first exposes the rationale of EU renewables goals, the EU targets and current deployment. It then explains why the LCOE metric is not appropriate to compute VRE costs by describing integration costs, their magnitude and their implications. Finally, it analyses the consequences for the power system and policy options. The paper shows that the EU has greatly underestimated VRE direct and indirect costs and that policymakers have failed to take into account the burden caused by renewable energy and the return of State support policies. Indeed, induced market distortions have been shattering the whole power system and have undermined competition in the Internal Energy Market. EU policymakers can nonetheless take full account of this negative trend and reverse it by relying on competition rules, setting-up a framework to collect robust EU-wide data, redesigning the architecture of the electricity system and relying on EU regulators.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Thirty years after the Chornobyl nuclear power plant disaster, its aftermath and consequences are still a permanent element of the economic, environmental and social situation of Ukraine, Belarus and some regions of Russia. Ukraine, to which the scope of this text is limited, experienced the most severe shock because, among other factors, the plant where the accident took place was located just 100 km away from Kyiv. Its consequences have affected the course of political developments in the country, and have become part of the newly-shaped national identity of independent Ukraine. The country bore the huge cost of the clean-up effort but did not give up on nuclear energy, and today nuclear power plants generate more than half of its electricity. The system of social benefits for people recognised as disaster survivors, which was put in place by the Soviet government, has become a huge burden on the country’s budget; if implemented fully, it would account for more than 10% of total public spending, and is therefore being implemented to only a partial extent. This system has reinforced the Ukrainian people’s sense of helplessness and dependence on the state. The disaster has also become part of the ‘victim nation’ blueprint of the Ukrainian national myth, which it has further solidified. The technological and environmental consequences of the disaster, and hence also its economic costs, will persist for centuries, while the social consequences will dissipate as the affected generation passes away. In any case, Chornobyl will remain an important part of the life of the Ukrainian state and society.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Built 1884. Used as boilerhouse until 1914 or 1994. Was south of original medical building, just west of present day West Engineering (West Hall). Three men in image.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Transportation Department, Washington, D.C.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Transportation Department, Office of the Assistant Secretary for Systems Development and Technology, Washington, D.C.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Mode of access: Internet.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

"EPA 520/1-75-001-A"--Cover.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

"FERC/EIS-0015"--Cover.