998 resultados para Equipamentos de potência
Resumo:
The constant search for improvements and the survival of organizations makes the strategic guidelines are deployed and executed at the operational levels. This work is the approach to critical analysis of the equipment of a chemical industry through a case study based on the classification of each equipment manufactures through qualitative and quantitative analysis on the pillars of maintenance costs, loss of production, MTBF, contribution margin, Health Safety and Environment (SHE). From this study and future data collection, along with the flow diagram show the main equipment that should be special attention. To this can be prepared an action plan with deadlines and responsible. With the results one can measure the maintenance costs, loss of production and technical availability of the plant, with future gains
Resumo:
Radiography is currently an important method of diagnosis, both medical, dental and veterinary. The image in this type of survey is obtained using an X-ray beam, where the radiologist can possibly view structures of interest. It isn't always possible to get the desired images due to various factors, such as equipment limitations. The Administrative Law 453/98, the State Resolution SS 625/94, and other standards require testing and quality control acceptance limits that guarantee a good performance of the equipment for the security and quality of care, giving service users greater effectiveness in exams. This study were performed in the accompaniment of testing procedures for quality control established by Administrative Law 453/98 in several X-ray equipment to make a comparison and optimization in the descriptions of the procedures used by the Institute for Electrical Energy and the University of São Paulo (IEE / USP / SP).The optimization of the procedures were performed with the aid of a current literature, the Resolution 453/98, State Resolution SS 625/94 and other international standards. On this basis it was possible to observe the importance of regular monitoring of tests for an update, following the technological development of instruments used in the service
Resumo:
This is study proposes to evaluate the ergonomic aspects of dental equipments. Based on the characteristics proposed by ISO/FDI, on the existing literature and related researches an evaluating system was devised. Thirty nine dental clinics were examined using the 165 pointssystem proposed, distributed in 12 criteria. None of the dental clinics examined showed a bad ergonomics level, 41% were good and 59% reached excellent levels. The point-supported evaluation system proposed is effective in the analysis of the ergonomic conditions of dental equipments, allowing a quantification of their characteristics. Using this system, the dentist can also know the level of ergonomic satisfaction existing in his equipment, and identify the conditions to be improved. It was concluded that the equipment belonging to dental workplaces evaluated had excellent level of compliance, however corrective measures are needed since even the presence of a few non-conforming items is a sufficient condition to cause injury to users, decreased efficiency and comfort and loss quality of service
Resumo:
Não disponível
Resumo:
The expansion of the electrical system is currently a subject of great importance to the development of Brazil. For its realization, large projects are needed, requiring large-scale investment and realization processes of great complexity. Thus, this type of project has a high strategic importance for the performance of companies that conduct. Seeking a way to determine a method to align traditional practices for measuring quality to the corporate strategic needs, this work is the study of the use of the balanced scorecard methodology, applying quality management and operational excellence, with a focus on projects in power systems. We analyzed some cases of successful application of the methodology in business segments in the next study, culminating in a proposed model of the method
Resumo:
The objective of this study was to analyze the influence of previous exercise on the determination of critical power (CP). Seven apparently healthy nontrained males, of 18 to 25 years, participated of this study. The subjects were submitted, in different days to the following protocols in a cyclergometer: 1) one progressive test until voluntary exhaustion for the determination of lactate threshold (LL), maximal oxygen uptake (VO2max) and its corresponding intensity (IVO2max); 2) six constant workload tests at 95,100 and 110% IVO2max until exhaustion with and without a previous exercise at 70% , in random order. The exhaustion times (tlim) at 95, 100 and 110% IVO2max were adjusted forme thress models of two parameters to estimate CP and anaerobic work capacity (AWC) [P=CTAn/tlim)+CP; tlim = CTAn/(P-PC); P=PC.tlim+ CTAn]. The model with the lowest standard error was considered for the estimation of CP. The tlim at 95% IVO2max was similar without (501 ± 140 s) and with previous exercise (473 ± 99 s). However, the tlim at 100% (381 ± 103 s and 334 ± 101 s) and 110% IVO2max (267 ± 163 s and 227 ± 68 s) was significantly longer with previous exercise. There was no significant difference in CP and AWCat conditions without (200 ± 27 W and 23 ± 11 kJ, respectively) and with previous exercise (212 ± 30 W and 18 ± 8 kJ, respectively). It can be concluded that the parameters of the relationship between power and time were not modified by the previous severe exercise
Resumo:
This paper presents a comparative study based on literature and examples in the literature, the two main technologies for the transmission of electricity at high voltage: alternate current transmission and direct current transmission. Inside the direct current transmission will be shown two technologies currently employed, transmission by current source and transmission by voltage source, contributing to a better understanding of them. The ultimate goal is to provide a text for consultation to identify key characteristics that influence the choice of future transmission lines
Resumo:
In the industries of wood processing (sawmills), where timber is sawn in equipment such as band saws, circular saws, trowel, thicknessers, among others, that mechanically transform this resource and use of electric motors, which are not unusually poorly scaled working or overloaded, often a factor that is not found in these industries and has fundamental importance in the production process is energy efficiency that is achieved by both technological innovation and through all the practices and policies that aim to lower energy consumption, lowering energy costs and increasing the amount of energy offered no change in generation. For both during the design of an electrical installation, both overall and in various sectors of the installation, investigations are necessary, considerations and uses of variables and factors that put into practice the theme of energy efficiency. Therefore, in this paper, these factors were calculated and analyzed for a wood processing industry (sawmill) in the municipality of Taquarivaí - SP, namely: active power, power factor, demand factor and load factor. Where they were small in relation to the literature, these events that occur when devices are connected at the same time and due to the conditions of processing the wood, where the engines have large variations in electricity consumption during the unfolding of the same, due to efforts with the load and idle moments between each machining operation in the equipment
Resumo:
This graduation work presents the implementation of the key concepts of lean thinking in a maintenance workshop of rotating equipment, analyzing all the administrative and workshop processes. The pursuit of quality and client satisfaction at lower costs has generated a lot of competition between organizations, which use the practices of lean manufacturing as tools for processes improvement, aiming to eliminate wastes, being this, the work objective. And, unlike a manufacturing system, where the product goes through certain stages until its conclusion, the workshop does not have a default sequence that is repeated routinely on all machines. Thus, it demonstrates a possibility of application of lean tools in a different way of the common used in the lean manufacturing
Resumo:
The intended purpose of this paper is to present the main commissioning tests for power transformers and the most used techniques in industrial segment, it is also discussed your results and consequences in the equipment’s normal operation. Also in this text, it is given specific information concerning a maintenance plan compatible to power transformers, with elements of preventive and predictive maintenance, exposing essential components, tests and the regulations current, showing how analyze and interpreted the results from this maintenance resources. Also in this paper is submitted the economic impact of damage to transformers and how the correct maintenance method can minimize them. The objective of this text is demonstrate the importance of the equipment and the benefits of proper maintenance, much of in financial terms as in electric system reliability
Resumo:
Due to concerns about rational use of energy, several alternative technologies of power generation appeared, including the conversion of solar energy into electrical energy by photovoltaic panels. In low-income households, the refrigerator represents considerable impact on the electric bill, since it requires constant power given its use in food preservation. It is possible to reduce this share, with the use of an alternative energy source. This work presents a timed switching electronic system, which allows commercial equipment that is not affected by short interruptions in the power supply to use a photovoltaic panel as a source of alternative energy, which usually do not provide energy continuously. Switching is made automatically in case of low incidence of sunlight, and without any form of energy storage. Between each switching, there is a dead time without power supply, therefore preventing the use of synchronizers circuits between the photovoltaic panel and the public power grid. A circuit containing a 80C31 microcontroller is used to control the system’s switching. The photovoltaic panel’s voltage inverter is in H bridge configuration, and is also controlled by the microcontroller through Pulse Width Modulation, which makes use of preprogrammed tables to generate the control signals of the power transistors. Through the use of software simulations, the proposed system was tested, which is capable of supplying intermittent single-phase loads. The simulations indicates that the project developed in this paper can be assembled into a prototype and be tested under real operating conditions, as long as the scaling of components, the characteristics of the photovoltaic panel to be used, and the project involved load are taken into account
Resumo:
Pós-graduação em Engenharia Elétrica - FEIS
Resumo:
Pós-graduação em Medicina Veterinária - FMVZ
Resumo:
Pós-graduação em Engenharia Elétrica - FEIS
Resumo:
Pós-graduação em Engenharia Elétrica - FEIS