997 resultados para Carga eletrica
Resumo:
In the industries of wood processing (sawmills), where timber is sawn in equipment such as band saws, circular saws, trowel, thicknessers, among others, that mechanically transform this resource and use of electric motors, which are not unusually poorly scaled working or overloaded, often a factor that is not found in these industries and has fundamental importance in the production process is energy efficiency that is achieved by both technological innovation and through all the practices and policies that aim to lower energy consumption, lowering energy costs and increasing the amount of energy offered no change in generation. For both during the design of an electrical installation, both overall and in various sectors of the installation, investigations are necessary, considerations and uses of variables and factors that put into practice the theme of energy efficiency. Therefore, in this paper, these factors were calculated and analyzed for a wood processing industry (sawmill) in the municipality of Taquarivaí - SP, namely: active power, power factor, demand factor and load factor. Where they were small in relation to the literature, these events that occur when devices are connected at the same time and due to the conditions of processing the wood, where the engines have large variations in electricity consumption during the unfolding of the same, due to efforts with the load and idle moments between each machining operation in the equipment
Resumo:
Many structures and mechanical equipment requires a union member, and the screw is one of the most used, the cost is low, it is versatile and easy to find on the market. The resulting pre-load assembly torque associated with the cyclical external load has great influence, so it will be studied carefully. This study analyzed some of these factors, as the format of nuts, and the washer material when they are incompatible with the bolt material can cause a reduction in life of the joint fatigue
Resumo:
Pós-graduação em Odontologia Restauradora - ICT
Resumo:
Pós-graduação em Patologia - FMB
Resumo:
Pós-graduação em Engenharia Elétrica - FEIS
Resumo:
Coordenação de Aperfeiçoamento de Pessoal de Nível Superior (CAPES)
Resumo:
Pós-graduação em Engenharia Elétrica - FEIS
Resumo:
Coordenação de Aperfeiçoamento de Pessoal de Nível Superior (CAPES)
Resumo:
Pós-graduação em Engenharia Elétrica - FEIS
Resumo:
Pós-graduação em Engenharia Elétrica - FEIS
Resumo:
Pós-graduação em Ciência Animal - FMVA
Resumo:
Pós-graduação em Engenharia Elétrica - FEIS
Resumo:
Pós-graduação em Engenharia Elétrica - FEIS
Resumo:
This paper presents a case report with the use of short dental implants and immediate prosthesis placement. After 13 months of follow-up, peri-implant probing values are near 1.87 mm and ISQ values around 78.56.
Resumo:
The oral rehabilitation with osseointegrated implants is a well-documented treatment with high rate of success. Nevertheless, demands related to treatment time and surgical technique began to appear. In this context, the procedure of immediate loading in which the dental prosthesis is placed right after implant surgery has become a constant practice. Although immediate loading has been an important advance, minimally invasive procedures, such as implant placement without raising a mucoperiosteal flap (flapless) are increasingly being performed. Association of immediate loading with the flapless technique improves acceptance by patients and professionals, because no suturing is required. Moreover, it reduces swelling, bleeding during and after surgery, postoperative pain, surgery time, discomfort and hematoma, as well as the need for postoperative medication. These characteristics ease the stages of rehabilitation soon after implant placement, cooperating with prosthodontist's work. Thus, the proposal of this study is to present a clinical case of oral rehabilitation with osseointegrated implants and fixed prosthesis in both arches, in which the flapless technique was applied, followed by immediate loading. It will discuss the diagnosis, prosthetic planning, surgical/prosthodontic procedures and follow-up for 20 months.