781 resultados para 380306 Planning and Problem Solving


Relevância:

100.00% 100.00%

Publicador:

Resumo:

Strategic planning and more specifically, the impact of strategic planning on organisational performance has been the subject of significant academic interest since the early 1970's. However, despite the significant amount of previous work examining the relationship between strategic planning and organisational performance, a comprehensive literature review identified a number of areas where contributions to the domain of study could be made. In overview, the main areas for further study identified from the literature review were a) a further examination of both the dimensionality and conceptualisation of strategic planning and organisational performance and b) a further, multivariate, examination of the relationship between strategic planning and performance, to capture the newly identified dimensionality. In addition to the previously identified strategic planning and organisational performance constructs, a comprehensive literature based assessment was undertaken and five main areas were identified for further examination, these were a) organisational b) comprehensive strategic choice, c) the quality of strategic options generated, d) political behavior and e) implementation success. From this, a conceptual model incorporating a set of hypotheses to be tested was formulated. In order to test the conceptual model specified and also the stated hypotheses, data gathering was undertaken. The quantitative phase of the research involved a mail survey of senior managers in medium to large UK based organisations, of which a total of 366 fully useable responses were received. Following rigorous individual construct validity and reliability testing, the complete conceptual model was tested using latent variable path analysis. The results for the individual hypotheses and also the complete conceptual model were most encouraging. The findings, theoretical and managerial implications, limitations and directions for future research are discussed.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The aim of this research was to improve the quantitative support to project planning and control principally through the use of more accurate forecasting for which new techniques were developed. This study arose from the observation that in most cases construction project forecasts were based on a methodology (c.1980) which relied on the DHSS cumulative cubic cost model and network based risk analysis (PERT). The former of these, in particular, imposes severe limitations which this study overcomes. Three areas of study were identified, namely growth curve forecasting, risk analysis and the interface of these quantitative techniques with project management. These fields have been used as a basis for the research programme. In order to give a sound basis for the research, industrial support was sought. This resulted in both the acquisition of cost profiles for a large number of projects and the opportunity to validate practical implementation. The outcome of this research project was deemed successful both in theory and practice. The new forecasting theory was shown to give major reductions in projection errors. The integration of the new predictive and risk analysis technologies with management principles, allowed the development of a viable software management aid which fills an acknowledged gap in current technology.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This thesis describes a study of the content and applicability of BS8800:1996 Guide to occupational health and safety management systems. The research is presented chronologically, with literature review and content analysis of SMS related guides and standards interwoven with two elements of qualitative empirical work. The first of these was carried out shortly after publication of BS8800 in 1996, a 'before-the-event' investigation of how organisations were intending to approach SMS implementation. The challenges faced by these organisations are reviewed against standard management theory, suggesting that the initial motivation for SMS implementation governs the approach organisations will adopt to guidance such as BS8800. The second phase of empirical work was undertaken in the context of OHSAS 18001, an auditable protocol based on BS8800, which allows organisations to certify their safety management systems. A discussion of the evolution of certifiable safety management system is presented, highlighting the similarities and differences between this, BS8800, SMS and wider management system standards. A case study then reviews the experiences of a catering company that implemented 18001, motivated by the opportunity for certification as a business benefit. The empirical work is used to comment on the guidance provided by BS8800, within its evolved role as guidance organisations may use for implementation of a SMS to be certified according to the specifications of OHSAS 18001. It is suggested that optimal implementation is facilitated by initial status review, continual improvement and the use of annexes, where there are used to make changes to the existing safety management system. This thesis concludes with a discussion of these elements, highlighting pertinent areas within BS8800 where revision or amendment may be appropriate.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The present study describes a pragmatic approach to the implementation of production planning and scheduling techniques in foundries of all types and looks at the use of `state-of-the-art' management control and information systems. Following a review of systems for the classification of manufacturing companies, a definitive statement is made which highlights the important differences between foundries (i.e. `component makers') and other manufacturing companies (i.e. `component buyers'). An investigation of the manual procedures which are used to plan and control the manufacture of components reveals the inherent problems facing foundry production management staff, which suggests the unsuitability of many manufacturing techniques which have been applied to general engineering companies. From the literature it was discovered that computer-assisted systems are required which are primarily `information-based' rather than `decision based', whilst the availability of low-cost computers and `packaged-software' has enabled foundries to `get their feet wet' without the financial penalties which characterized many of the early attempts at computer-assistance (i.e. pre-1980). Moreover, no evidence of a single methodology for foundry scheduling emerged from the review. A philosophy for the development of a CAPM system is presented, which details the essential information requirements and puts forward proposals for the subsequent interactions between types of information and the sub-system of CAPM which they support. The work developed was oriented specifically at the functions of production planning and scheduling and introduces the concept of `manual interaction' for effective scheduling. The techniques developed were designed to use the information which is readily available in foundries and were found to be practically successful following the implementation of the techniques into a wide variety of foundries. The limitations of the techniques developed are subsequently discussed within the wider issues which form a CAPM system, prior to a presentation of the conclusions which can be drawn from the study.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The work described in the following pages was carried out at various sites in the Rod Division of the Delta Metal Company. Extensive variation in the level of activity in the industry during the years 1974 to I975 had led to certain inadequacies being observed 1n the traditional cost control procedure. In an attempt to remedy this situation it was suggested that a method be found of constructing a system to improve the flexibility of cost control procedures. The work involved an assimilation of the industrial and financial environment via pilot studies which would later prove invaluable to home in on the really interesting and important areas. Weaknesses in the current systems which came to light made the methodology of data collection and the improvement of cost control and profit planning procedures easier to adopt. Because of the requirements of the project to investigate the implications of Cost behaviour for profit planning and control, the next stage of the research work was to utilise the on-site experience to examine at a detailed level the nature of cost behaviour. The analysis of factory costs then showed that certain costs, which were the most significant exhibited a stable relationship with respect to some known variable, usually a specific measure of Output. These costs were then formulated in a cost model, to establish accurate standards in a complex industrial setting in order to provide a meaningful comparison against which to judge actual performance. The necessity of a cost model was •reinforced by the fact that the cost behaviour found to exist was, in the main, a step function, and this complex cost behaviour, the traditional cost and profit planning procedures could not possibly incorporate. Already implemented from this work is the establishment of the post of information officer to co-ordinate data collection and information provision.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This thesis investigates the role of accounting in planning and control in the Egyptian Iron and Steel Company "Hadisolb". The hypothesis is that there should be planning and control at appropriate levels, with a significant accounting involvement, In an organisation such as the Egyptian Iron and Steel Company "Hadisolb" . Part One of the thesis explains the role of accounting in planning and control, with special emphasis on its role in long-range corporate planning and control. Parts Two and Three review the history of the Egyptian Iron and Steel Company "Hadisolb", its organisation and structure, also the role of accounting in its planning and control arrangements, together with comments and criticisms concerning this. Part Four is mainly recommendations for alterations or improvements in planning and control in Hadisolb. This includes a suggested planning and organisation structure, physical and cost control reporting structures.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

In this thesis, I view the historical background of Zimbabwe to show the patterns of traditional life that existed prior to settlerism. The form, nature, pace and impact of settlerism and colonialism up to the time of independence are also discussed to show how they affected the health of the population and the pace of development of the country. The political, social and economic underdevelopment of the African people that occurred in Zimbabwe prior to independence was a result of deliberate, politically motivated and controlled policy initiatives. These led to inequatable, inadequate, inappropriate and inaccessible health care provision. It is submitted that since it was the politics that determined the pace of underdevelopment, it must be the politics that must be at the forefront of the development strategy adopted. In the face of the amed conflict that existed in Zimbabwe, existing frameworks of analyses are shown to be inadequate for planning purposes because of their inability to provide indications about the stability of future outcomes. The Metagame technique of analysis of options is proposed as a methology that can be applied in such situations. It rejects deterministic predicative models as misleading and advocates an interactive model based on objective and subjective valuation of human behaviour. In conclusion, the search for stable outcomes rather than optimal and best solutions strategies is advocated in decision making in organisations of all sizes.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

DUE TO COPYRIGHT RESTRICTIONS ONLY AVAILABLE FOR CONSULTATION AT ASTON UNIVERSITY LIBRARY WITH PRIOR ARRANGEMENT

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Manufacturing planning and control systems are fundamental to the successful operations of a manufacturing organisation. 10 order to improve their business performance, significant investment is made by companies into planning and control systems; however, not all companies realise the benefits sought Many companies continue to suffer from high levels of inventory, shortages, obsolete parts, poor resource utilisation and poor delivery performance. This thesis argues that the fit between the planning and control system and the manufacturing organisation is a crucial element of success. The design of appropriate control systems is, therefore, important. The different approaches to the design of manufacturing planning and control systems are investigated. It is concluded that there is no provision within these design methodologies to properly assess the impact of a proposed design on the manufacturing facility. Consequently, an understanding of how a new (or modified) planning and control system will perform in the context of the complete manufacturing system is unlikely to be gained until after the system has been implemented and is running. There are many modelling techniques available, however discrete-event simulation is unique in its ability to model the complex dynamics inherent in manufacturing systems, of which the planning and control system is an integral component. The existing application of simulation to manufacturing control system issues is limited: although operational issues are addressed, application to the more fundamental design of control systems is rarely, if at all, considered. The lack of a suitable simulation-based modelling tool does not help matters. The requirements of a simulation tool capable of modelling a host of different planning and control systems is presented. It is argued that only through the application of object-oriented principles can these extensive requirements be achieved. This thesis reports on the development of an extensible class library called WBS/Control, which is based on object-oriented principles and discrete-event simulation. The functionality, both current and future, offered by WBS/Control means that different planning and control systems can be modelled: not only the more standard implementations but also hybrid systems and new designs. The flexibility implicit in the development of WBS/Control supports its application to design and operational issues. WBS/Control wholly integrates with an existing manufacturing simulator to provide a more complete modelling environment.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This research project has developed a novel decision support system using Geographical Information Systems and Multi Criteria Decision Analysis and used it to develop and evaluate energy-from-waste policy options. The system was validated by applying it to the UK administrative areas of Cornwall and Warwickshire. Different strategies have been defined by the size and number of the facilities, as well as the technology chosen. Using sensitivity on the results from the decision support system, it was found that key decision criteria included those affected by cost, energy efficiency, transport impacts and air/dioxin emissions. The conclusions of this work are that distributed small-scale energy-from-waste facilities score most highly overall and that scale is more important than technology design in determining overall policy impact. This project makes its primary contribution to energy-from-waste planning by its development of a Decision Support System that can be used to assist waste disposal authorities to identify preferred energy-from-waste options that have been tailored specifically to the socio-geographic characteristics of their jurisdictional areas. The project also highlights the potential of energy-from-waste policies that are seldom given enough attention to in the UK, namely those of a smaller-scale and distributed nature that often have technology designed specifically to cater for this market.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Research in skill requirements needed by supply chain/logistics (SCL) managers has been published since the early nineties, however, research on what is really taught (e.g. curriculum, learning philosophies) by universities is scant. This paper's aim is to fill in this gap by analysing SCL graduate teaching in the UK. Data from 50 SCL MSc programmes were collected from 43 universities. Findings indicate that there seems to be a gap emerging between industry's needs and the content of the programmes being offered. This gap concerns employability, problem based learning, international business and the acquisition of softer interpersonal and problem solving skills.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Recent research has highlighted several job characteristics salient to employee well-being and behavior for which there are no adequate generally applicable measures. These include timing and method control, monitoring and problem-solving demand, and production responsibility. In this article, an attempt to develop measures of these constructs provided encouraging results. Confirmatory factor analyses applied to data from 2 samples of shop-floor employees showed a consistent fit to a common 5-factor measurement model. Scales corresponding to each of the dimensions showed satisfactory internal and test–retest reliabilities. As expected, the scales also discriminated between employees in different jobs and employees working with contrasting technologies.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This chapter reports on a framework that has been successfully used to analyze the e-business capabilities of an organization with a view to developing their e-capability maturity levels. This should be the first stage of any systems development project. The framework has been used widely within start-up companies and well-established companies both large and small; it has been deployed in the service and manufacturing sectors. It has been applied by practitioners and consultants to help improve e-business capability levels, and by academics for teaching and research purposes at graduate and undergraduate levels. This chapter will provide an account of the unique e-business planning and analysis framework (E-PAF) and demonstrate how it works via an abridged version of a case study (selected from hundreds that have been produced). This will include a brief account of the three techniques that are integrated to form the analysis framework: quality function deployment (QFD) (Akao, 1972), the balanced scorecard (BSC) (Kaplan & Norton, 1992), and value chain analysis (VCA) (Porter, 1985). The case study extract is based on an online community and dating agency service identified as VirtualCom which has been produced through a consulting assignment with the founding directors of that company and has not been published previously. It has been chosen because it gives a concise, comprehensive example from an industry that is relatively easy to relate to.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Biomass is projected to account for approximately half of the new energy production required to achieve the 2020 primary energy target in the UK. Combined heat and power (CHP) bioenergy systems are not only a highly efficient method of energy conversion, at smaller-scales a significant proportion of the heat produced can be effectively utilised for hot water, space heating or industrial heating purposes. However, there are many barriers to project development and this has greatly inhibited deployment in the UK. Project viability is highly subjective to changes in policy, regulation, the finance market and the low cost incumbent; a high carbon centralised energy system. Unidentified or unmitigated barriers occurring during the project lifecycle may not only negatively impact on the project but could ultimately lead to project failure. The research develops a decision support system (DSS) for small-scale (500 kWe to 10 MWe) biomass combustion CHP project development and risk management in the early stages of a potential project’s lifecycle. By supporting developers in the early stages of project development with financial, scheduling and risk management analysis, the research aims to reduce the barriers identified and streamline decision-making. A fuzzy methodology is also applied throughout the developed DSS to support developers in handling the uncertain or approximate information often held at the early stages of the project lifecycle. The DSS is applied to a case study of a recently failed (2011) small-scale biomass CHP project to demonstrate its applicability and benefits. The application highlights that the proposed development within the case study was not viable. Moreover, further analysis of the possible barriers with the DSS confirmed that some possible modifications to be project could have improved this, such as a possible change of feedstock to a waste or residue, addressing the unnecessary land lease cost or by increasing heat utilisation onsite. This analysis is further supported by a practitioner evaluation survey that confirms the research contribution and objectives are achieved.