841 resultados para software project management
Resumo:
The research described here concerns the development of metrics and models to support the development of hybrid (conventional/knowledge based) integrated systems. The thesis argues from the point that, although it is well known that estimating the cost, duration and quality of information systems is a difficult task, it is far from clear what sorts of tools and techniques would adequately support a project manager in the estimation of these properties. A literature review shows that metrics (measurements) and estimating tools have been developed for conventional systems since the 1960s while there has been very little research on metrics for knowledge based systems (KBSs). Furthermore, although there are a number of theoretical problems with many of the `classic' metrics developed for conventional systems, it also appears that the tools which such metrics can be used to develop are not widely used by project managers. A survey was carried out of large UK companies which confirmed this continuing state of affairs. Before any useful tools could be developed, therefore, it was important to find out why project managers were not using these tools already. By characterising those companies that use software cost estimating (SCE) tools against those which could but do not, it was possible to recognise the involvement of the client/customer in the process of estimation. Pursuing this point, a model of the early estimating and planning stages (the EEPS model) was developed to test exactly where estimating takes place. The EEPS model suggests that estimating could take place either before a fully-developed plan has been produced, or while this plan is being produced. If it were the former, then SCE tools would be particularly useful since there is very little other data available from which to produce an estimate. A second survey, however, indicated that project managers see estimating as being essentially the latter at which point project management tools are available to support the process. It would seem, therefore, that SCE tools are not being used because project management tools are being used instead. The issue here is not with the method of developing an estimating model or tool, but; in the way in which "an estimate" is intimately tied to an understanding of what tasks are being planned. Current SCE tools are perceived by project managers as targetting the wrong point of estimation, A model (called TABATHA) is then presented which describes how an estimating tool based on an analysis of tasks would thus fit into the planning stage. The issue of whether metrics can be usefully developed for hybrid systems (which also contain KBS components) is tested by extending a number of "classic" program size and structure metrics to a KBS language, Prolog. Measurements of lines of code, Halstead's operators/operands, McCabe's cyclomatic complexity, Henry & Kafura's data flow fan-in/out and post-release reported errors were taken for a set of 80 commercially-developed LPA Prolog programs: By re~defining the metric counts for Prolog it was found that estimates of program size and error-proneness comparable to the best conventional studies are possible. This suggests that metrics can be usefully applied to KBS languages, such as Prolog and thus, the development of metncs and models to support the development of hybrid information systems is both feasible and useful.
Resumo:
The process framework comprises three phases, as follows: scope the supply chain/network; identify the options for supply system architecture and select supply system architecture. It facilitates a structured approach that analyses the supply chain/network contextual characteristics, in order to ensure alignment with the appropriate supply system architecture. The process framework was derived from comprehensive literature review and archival case study analysis. The review led to the classification of supply system architectures according to their orientation, whether integrated; partially integrated; co-ordinated or independent. The classification was combined with the characteristics that influence the selection of supply system architecture to encapsulate the conceptual framework. It builds upon existing frameworks and methodologies by focusing on structured procedure; supporting project management; facilitating participation and clarifying point of entry. The process framework was initially tested in three case study applications from the food, automobile and hand tool industries. A variety of industrial settings was chosen to illustrate transferability. The case study applications indicate that the process framework is a valid approach to the problem; however, further testing is required. In particular, the use of group support system technologies to support the process and the steps involving the participation of software vendors need further testing. However, the process framework can be followed due to the clarity of its presentation. It considers the issue of timing by including alternative decision-making techniques, dependent on the constraints. It is useful for ensuring a sound business case is developed, with supporting documentation and analysis that identifies the strategic and functional requirements of supply system architecture.
Resumo:
Customer relationship management (CRM) implementation projects reflect a growing conceptual shift from the traditional engineering view of projects. Such projects are complex and risky because they call for both organisational and technological changes. This requires effective project management across various phases of the implementation process. However, few empirical researches have dealt with these project management issues. The aim of this research is to investigate how a “project team” manages CRM implementation projects successfully, across the different phases of the implementation process. We conducted an in-depth case study of the “Firm-Clients Branch” of a large telecommunications company in France. The findings show that, to manage CRM implementation projects successfully, an integrated and balanced approach is required. This involves appropriate system selection, effective process re-engineering and further development of organizational structures. We highlight the need for a “technochange approach” to achieve successful organisational transition and effective CRM implementation. The study reveals that the project team plays a central role throughout the implementation phases. Furthermore the effectiveness of technochange depends on project team performance, technology efficiency and close coordination with stakeholders.
Resumo:
The eighth edition is a fundamental and essential update to the seventh edition published in 2000. This new edition examines a comprehensive range of existing and newer topics that are relevant to project financing in 2012 and explores current trends in the project finance and leasing industries. Contributors are experienced academics and practitioners. Since the first edition was published, the financial markets have undergone tremendous upheavals and many new structures and instruments have been created to meet the financing needs of business. This edition considers the wider world of project finance, applicable to such diverse situations as venture capital and leveraged buyouts, and using new approaches such as Islamic finance techniques. The eighth edition is an essential and over-due update to the previous edition published in 2000. The eighth edition updates a comprehensive review of financial and related topics which are relevant to project financing in 2012 and explores current trends in financial modelling of a project, risk management and the private finance initiatives. This is a comprehensive and practical book full of advice and tips for successful project financing, including leasing, offering a clear, easy to understand guide to a complex area with examples. The topic coverage is well organized and complete moving from the fundamentals to the more complex issues. There is an extensive glossary to support readers. Finally the use of 12 practitioner case studies brings many of these complex issues to life. This is the new edition of the clear, easy-to-understand industry-standard text on project financing. With a good overview of a broad area and using principles of project financing to explain complex structures, this book includes lots of examples and case studies (including Eurotunnel, Dabhol, multiple Paiton deals and other recent deals along with subsequent developments) to show the concepts in use, examine outcomes and to ensure you understand important issues such as effective project structuring and financing, financial modelling for project valuation, and risk management. Substantially updated and expanded to provide the latest developments in all aspects of project financing. An important manual reference, this book is a must-have for every project financier's desk. The text unites the domain of project financing with a wealth of project management techniques, supported by diagrams and charts and other pictorial features, where appropriate. All these supporting features facilitate a better understanding of the accompanying text for the reader. In many chapters there are diagrams to clarify the specific transaction structure discussed in the accompanying text. These diagrams enable the reader to get a very clear idea of the transaction structure, which is particularly useful where it is complex or unusual. There are also a number of checklists to assist stakeholders in the project and resource management of complex project financings. The new financial modelling chapters allow exploration of some of the pitfalls project models encounter, challenging the accurate replication of the project cash flows for stakeholders to evaluate. In the later new risk management chapters, worked examples are included to illustrate the techniques in practice. The new public private partnership/private finance initiatives chapter introduces readers to this new approach to public projects. References are made to useful websites throughout the text. Cases are included at the end of the main text to encourage examination of real-life examples of project financing in practice and also highlight specific issues of current interest. The book will be helpful to project finance sponsors, lawyers, host governments, bankers and providers of capital
Resumo:
Conventional project management techniques are not always sufficient to ensure that schedule, cost and quality goals are met on large-scale construction projects. These jobs require complex planning, designing and implementation processes. The main reasons for a project's nonachievement in India's hydrocarbon processing industry are changes in scope and design, altered government policies and regulations, unforeseen inflation, under and/or improper estimation. Projects that are exposed to such an uncertain environment can be effectively managed by applying risk management throughout the project life cycle.
Resumo:
Projects that are exposed to uncertain environments can be effectively controlled with the application of risk analysis during the planning stage. The Analytic Hierarchy Process, a multiattribute decision-making technique, can be used to analyse and assess project risks which are objective or subjective in nature. Among other advantages, the process logically integrates the various elements in the planning process. The results from risk analysis and activity analysis are then used to develop a logical contingency allowance for the project through the application of probability theory. The contingency allowance is created in two parts: (a) a technical contingency, and (b) a management contingency. This provides a basis for decision making in a changing project environment. Effective control of the project is made possible by the limitation of the changes within the monetary contingency allowance for the work package concerned, and the utilization of the contingency through proper appropriation. The whole methodology is applied to a pipeline-laying project in India, and its effectiveness in project control is demonstrated.
Resumo:
The aim of this study is to address the main deficiencies with the prevailing project cost and time control practices for construction projects in the UK. A questionnaire survey was carried out with 250 top companies followed by in-depth interviews with 15 experienced practitioners from these companies in order to gain further insights of the identified problems, and their experience of good practice on how these problems can be tackled. On the basis of these interviews and syntheses with literature, a list of 65 good practice recommendations have been developed for the key project control tasks: planning, monitoring, reporting and analysing. The Delphi method was then used, with the participation of a panel of 8 practitioner experts, to evaluate these improvement recommendations and to establish their degree of relevance. After two rounds of Delphi, these recommendations are put forward as "critical", "important", or "helpful" measures for improving project control practice.
Resumo:
Az agilitás az elmúlt húsz év egyik fontos fogalma, amelyet több területen (gyártás, szoftverfejlesztés és projektmenedzsment) is több-kevesebb eredménnyel alkalmaztak. A hazai akadémiai diskurzus eddig mostohagyermekként kezelte e témákat, holott az érintett szakmák gyakorlati művelői számos alkalommal foglalkoztak velük. A szerző rövid áttekintést ad e területek fontosabb gondolatairól, majd ezek közül néhányat a vezetés-szervezés általánosabb tárgyalásmódjával vizsgál. Az agilis szemlélet mögött rejlő alapgondolatok egy része nem nevezhető újnak. A cikk az agilitás témájának pozicionálásával zárul. _____ The agility of is an important concept of the last twenty years, which is applied with more or less results in several areas (manufacturing, software development and project management) as well. The author gives a brief overview of the main ideas from these areas, and examines some of these with general aspects of leadership and management. The article concludes with the theme of the positioning of agility.
Resumo:
A válság okozta megszorítások a projektek költségvetését sem hagyták változatlanul. Nagyon sokszor nemcsak a jövőbeni projekttervek költségvetését kell átgondolni, hanem a már futó projektek költségvetését is újra kell szabni. E tanulmány ilyen esetekben nyújthat módszertani támogatást. A szerző ebben a kutatásban négy költség- és időcsökkentő módszert hasonlít össze. Ismerteti, hogy ezeket az eljárásokat milyen módon lehet ötvözni, illetve mikor, melyiket célszerű alkalmazni. Az eljárások között van olyan módszer, amely a hagyományos projektmenedzsment (pl. építési, beruházási projektek menedzselésének) eszköztárát gazdagítja, de találkozhatunk olyan eljárásokkal is, amelyek az agilis projektszemléleten alapuló módszerek körét szélesítik. A bemutatott módszerek nemcsak a hálótervezési, hanem a mátrixos projekttervezési eljárások esetén is alkalmazhatók. ____ Due to the effects of the crisis, budgets of present as well as future projects are decreasing steadily. In this study four different methods are introduced for minimising budget and time demands. These introduced methods support not only the traditional but also the agile project management. Furthermore these methods can be used not only in case of network planning, but also for matrix-based project planning.
Resumo:
Több mint száz éve született meg Henry Gantt (Gantt, 1910) sávos ütemterve, Kelley (Kelley, 1961) és Walker (Walker, 1959) is több mint hatvan éve publikálta kritikus út módszerét. Az ezekre épülő költség- és erőforrás- tervezési módszerek vajon alkalmasak-e a ma kihívásaira? Az olvasó ebben a tanulmányban többéves kutatómunka gyümölcsét láthatja. A kutatás során az egyik legfontosabb cél annak vizsgálata volt, hogy a meglévő projekttervezési eszközök mennyiben felelnek meg a mai projektek kihívásainak; hol és milyen területen van szükség e módszerek továbbfejlesztésére, esetleg meghaladására. Ebben a tanulmányban a szerző olyan módszereket mutat be, amelyek messze túlvezetnek bennünket a projekttervezés eddig elsősorban operatív feladatokra szorítkozó módszereitől, és olyan kérdések megválaszolására fordítja figyelmünket, mint pl. milyen tevékenységeket, projekteket valósítsunk meg; melyeket hagyjuk el vagy ütemezzük be egy későbbi projektbe; hogyan rangsoroljuk, priorizáljuk a projektek megvalósítását, fontosságát? ______ Gantt chart (Gantt, 1910) was born by Henry Gantt more than a hundred years ago. Kelley and Walker published their critical planning method more than a 60 years ago (see i.e. Kelley-Walker, 1959). Can we use methods based on network planning methods for the challenges of 21st century? In this paper the author can see the results of the recent researches. In this study with their colleagues he investigated which project planning methods can be used in challenges of the 21st century and where and how to improve them. In these researches new matrix-based project planning methods are specified, where they can deal not only operative but strategic questions: which subprojects/tasks should be completed, how to treat priorities of completion in case of defining logic planning, how to support not only traditional but agile project management approaches.In this paper he introduces a new matrix-based method, which can be used for ranking project or multi project scenarios with different kinds of target functions. The author shows methods that are used in an expert module. He shows how to integrate this expert module into the traditional PMS system.
Resumo:
The project management literature on project success is rich. Numerous papers focus on the evolution of the understanding of project success, identification of success criteria and critical success factors. Critical success factors increase the potential for achieving project success, while project success can be evaluated with the help of success criteria. Although the interrelationships between critical success factors and success criteria are rarely analyzed, yet there is a strong demand for it. The aim of this paper is twofold. One of the aims is to identify the impact of one of the critical success factors, the project manager’s project management attitude on project success. The other aim is to highlight the interrelationship between the project manager’s personal characteristics and project management attitude and leadership style, which are three critical success factors. These aim to address the shortcoming mentioned above, which is considering the lack of the interrelationships between critical success factors and success criteria. The research outcomes are drawn from qualitative field research at the Hungarian subsidiaries of multinational companies operating in the ICT sector.
Resumo:
The integration of automation (specifically Global Positioning Systems (GPS)) and Information and Communications Technology (ICT) through the creation of a Total Jobsite Management Tool (TJMT) in construction contractor companies can revolutionize the way contractors do business. The key to this integration is the collection and processing of real-time GPS data that is produced on the jobsite for use in project management applications. This research study established the need for an effective planning and implementation framework to assist construction contractor companies in navigating the terrain of GPS and ICT use. An Implementation Framework was developed using the Action Research approach. The framework consists of three components, as follows: (i) ICT Infrastructure Model, (ii) Organizational Restructuring Model, and (iii) Cost/Benefit Analysis. The conceptual ICT infrastructure model was developed for the purpose of showing decision makers within highway construction companies how to collect, process, and use GPS data for project management applications. The organizational restructuring model was developed to assist companies in the analysis and redesign of business processes, data flows, core job responsibilities, and their organizational structure in order to obtain the maximum benefit at the least cost in implementing GPS as a TJMT. A cost-benefit analysis which identifies and quantifies the cost and benefits (both direct and indirect) was performed in the study to clearly demonstrate the advantages of using GPS as a TJMT. Finally, the study revealed that in order to successfully implement a program to utilize GPS data as a TJMT, it is important for construction companies to understand the various implementation and transitioning issues that arise when implementing this new technology and business strategy. In the study, Factors for Success were identified and ranked to allow a construction company to understand the factors that may contribute to or detract from the prospect for success during implementation. The Implementation Framework developed as a result of this study will serve to guide highway construction companies in the successful integration of GPS and ICT technologies for use as a TJMT.
Resumo:
Nowadays the search for growth makes organizations seeking competitive advantages, project management shares this goal, through techniques that assist in the search for an improved management of the various fields of knowledge through a design methodology. The world is driven by projects and the search for ways to better manage activities such as time, cost and term towards the success of a particular project is something constant. A major contribution that IT can make to the health sector is the support for the management area. IT can integrate processes, optimize the interconnection between the various sectors, make hospitals have access to inside information of good quality, as well as support in the healthcare area, sharing pictures, uniting the various aspects of nursing and nursing service. The major challenge faced by the SESAP Information Technology sector at present is in project management in IT , which does not exist makes investments in the area are increasingly difficult due to this deficiency in management develop their own systems without cost additional to the State. This study seeks to build and strengthen the Project Management within the Department of Health through the implementation of a project office that will manage the final result of this work methodology based on PMBOK, and still show the functionality applied to development the state Hospital Management System that will later be installed on all Regional Health Units and proposing measures for the sustainability and development of the sector amid the difficulties of the current public service. Such action will result in a savings of more than R$ 107,000.00 (one hundred seven thousand) regarding spending private software currently used by the assignment of invested by the State of Rio Grande do Norte user licenses, representing more than 5 % of the total budget of the State Department of Public Health of the State
Resumo:
Projects, as an organizing principle, can provide exciting contexts for innovative work. Thus far, project management discourse has tended to privilege the vital need to deliver projects ‘on time, on budget, and to specification’. In common with the call for papers for this workshop we suggest that perhaps the “instrumental rationality” underpinning this language of characterising project activity may create more problems than it solves. In this paper we suggest that such questions (and language) frame project contexts in a partial way. We argue that such concerns stem from a particular worldview or ontology, which we identify as a ‘being’ ontology. Here we contrast being and becoming project ontologies, to explore the questions, methods and interventions that each foregrounds. In an attempt to move this dialogue further than simply another contrast of modern and postmodernist accounts of project organising, we go on to consider some possible ethical concomitants of valuing being and becoming ontologies in project contexts.
Resumo:
This paper proposes the joint use of the AHP (Analytic Hierarchy Process) and the ICB (IPMA Competence Baseline), as a tool for the decision-making process of selecting the most suitable managers for projects. A hierarchical structure, comprising the IPMA’s ICB 3.0 contextual, behavioural and technical competence elements, is constructed for the selection of project managers. It also describes the AHP implementation, illustrating the whole process with an example using all the 46 ICB competence elements as model criteria. This tool can be of high interest to decision-makers because it allows comparing the candidates for managing a project using a systematic and rigorous process with a rich set of proven criteria.