840 resultados para operational reliability


Relevância:

20.00% 20.00%

Publicador:

Resumo:

Building energy consumption(BEC) accounting and assessment is fundamental work for building energy efficiency(BEE) development. In existing Chinese statistical yearbook, there is no specific item for BEC accounting and relevant data are separated and mixed with other industry consumption. Approximate BEC data can be acquired from existing energy statistical yearbook. For BEC assessment, caloric values of different energy carriers are adopted in energy accounting and assessment field. This methodology obtained much useful conclusion for energy efficiency development. While the traditional methodology concerns only on the energy quantity, energy classification issue is omitted. Exergy methodology is put forward to assess BEC. With the new methodology, energy quantity and quality issues are both concerned in BEC assessment. To illustrate the BEC accounting and exergy assessment, a case of Chongqing in 2004 is shown. Based on the exergy analysis, BEC of Chongqing in 2004 accounts for 17.3% of the total energy consumption. This result is quite common to that of traditional methodology. As far as energy supply efficiency is concerned, the difference is highlighted by 0.417 of the exergy methodology to 0.645 of the traditional methodology.

Relevância:

20.00% 20.00%

Publicador:

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Purpose – The purpose of this research is to show that reliability analysis and its implementation will lead to an improved whole life performance of the building systems, and hence their life cycle costs (LCC). Design/methodology/approach – This paper analyses reliability impacts on the whole life cycle of building systems, and reviews the up-to-date approaches adopted in UK construction, based on questionnaires designed to investigate the use of reliability within the industry. Findings – Approaches to reliability design and maintainability design have been introduced from the operating environment level, system structural level and component level, and a scheduled maintenance logic tree is modified based on the model developed by Pride. Different stages of the whole life cycle of building services systems, reliability-associated factors should be considered to ensure the system's whole life performance. It is suggested that data analysis should be applied in reliability design, maintainability design, and maintenance policy development. Originality/value – The paper presents important factors in different stages of the whole life cycle of the systems, and reliability and maintainability design approaches which can be helpful for building services system designers. The survey from the questionnaires provides the designers with understanding of key impacting factors.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This paper addresses two critical issues associated with reliability and maintenance of building services systems. The first is the ratio of operating and/or maintenance costs to initial costs for building services systems. It is an important parameter for life cycle costing and maintenance policy development. The second is the proportion of items among building services systems that need preventive maintenance. In this paper, we estimate the ratios based on a cost dataset. It suggests that correctly estimating the ratio be important but using a constant ratio in life cycle costing may result in wrong decisions. It also estimates the proportion of preventive maintenance for building services systems on the basis of the distribution of failure patterns.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Many photovoltaic inverter designs make use of a buck based switched mode power supply (SMPS) to produce a rectified sinusoidal waveform. This waveform is then unfolded by a low frequency switching structure to produce a fully sinusoidal waveform. The Cuk SMPS could offer advantages over the buck in such applications. Unfortunately the Cuk converter is considered to be difficult to control using classical methods. Correct closed loop design is essential for stable operation of Cuk converters. Due to these stability issues, Cuk converter based designs often require stiff low bandwidth control loops. In order to achieve this stable closed loop performance, traditional designs invariably need large, unreliable electrolytic capacitors. In this paper, an inverter with a sliding mode control approach is presented which enables the designer to make use of the Cuk converters advantages, while ameliorating control difficulties. This control method allows the selection of passive components based predominantly on ripple and reliability specifications while requiring only one state reference signal. This allows much smaller, more reliable non-electrolytic capacitors to be used. A prototype inverter has been constructed and results obtained which demonstrate the design flexibility of the Cuk topology when coupled with sliding mode control.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The ability of four operational weather forecast models [ECMWF, Action de Recherche Petite Echelle Grande Echelle model (ARPEGE), Regional Atmospheric Climate Model (RACMO), and Met Office] to generate a cloud at the right location and time (the cloud frequency of occurrence) is assessed in the present paper using a two-year time series of observations collected by profiling ground-based active remote sensors (cloud radar and lidar) located at three different sites in western Europe (Cabauw. Netherlands; Chilbolton, United Kingdom; and Palaiseau, France). Particular attention is given to potential biases that may arise from instrumentation differences (especially sensitivity) from one site to another and intermittent sampling. In a second step the statistical properties of the cloud variables involved in most advanced cloud schemes of numerical weather forecast models (ice water content and cloud fraction) are characterized and compared with their counterparts in the models. The two years of observations are first considered as a whole in order to evaluate the accuracy of the statistical representation of the cloud variables in each model. It is shown that all models tend to produce too many high-level clouds, with too-high cloud fraction and ice water content. The midlevel and low-level cloud occurrence is also generally overestimated, with too-low cloud fraction but a correct ice water content. The dataset is then divided into seasons to evaluate the potential of the models to generate different cloud situations in response to different large-scale forcings. Strong variations in cloud occurrence are found in the observations from one season to the same season the following year as well as in the seasonal cycle. Overall, the model biases observed using the whole dataset are still found at seasonal scale, but the models generally manage to well reproduce the observed seasonal variations in cloud occurrence. Overall, models do not generate the same cloud fraction distributions and these distributions do not agree with the observations. Another general conclusion is that the use of continuous ground-based radar and lidar observations is definitely a powerful tool for evaluating model cloud schemes and for a responsive assessment of the benefit achieved by changing or tuning a model cloud

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This paper presents preliminary results from an assessment of the barriers to adaptation to water supply shortage in a case study catchment in south east England with multiple supply companies. The investigation applies a conceptual framework, which distinguishes between generic barriers affecting the ability of supply companies to make adaptation decisions, and specific barriers to the implementation of each option. The preliminary analysis suggests that whilst there is a widespread awareness of the challenge of climate change, and a conceptual understanding of the need for adaptation, some of the generic barriers that will affect detailed evaluations and actual adaptation decisions have yet to be approached. The analysis also shows that different individual adaptation options are assessed differently by different stakeholders, and that there are differences in the barriers to adoption between supply-side and demand-side measures. First, however, the paper develops the general conceptual framework for the characterisation of the barriers to adaptation used in the study.

Relevância:

20.00% 20.00%

Publicador:

Relevância:

20.00% 20.00%

Publicador: